Loading...
HomeMy WebLinkAboutAgenda_GVPID_05.14.2018Notice of Meeting for the Georgetown Village Public Improv ement District of the City of Georgetown May 14, 2018 at 6:00 PM at West Side Serv ice Center, located at 5501 Williams Dr Georgetown, TX 78633 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. Regular Session (This Regular S es s io n may, at any time, b e rec es s ed to convene an Exec utive S es s io n fo r any p urpose authorized b y the Op en Meetings Act, Texas Go vernment Co d e 551.) A Co nsideration and possible actio n to approve the minutes o f the Ap ril 9, 2018 regular meeting - Karen Fro s t, Rec o rd ing S ecretary B Dis cus s ion and pos s ible recommend ation fo r ranking o f the p ro p o s ed G VP ID Mas ter Plan priorities . Eric Nuner, As s is tant Parks and Recreatio n Direc to r C Pres entatio n o f the Geo rgeto wn Village Pub lic Imp ro vement District (G VP ID) mo nthly financ ial reports for the mo nth o f April 2018. Elaine Wils on, Controller D Developer's Up d ate - Gary Newman Adjournment CERTIFICATE OF POSTING I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2018, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 1 of 35 City of Georgetown, Texas Georgetown Village Improvement District May 14, 2018 SUBJECT: Cons id eration and p o s s ib le ac tion to approve the minutes of the April 9, 2018 regular meeting - Karen Frost, Rec o rding Sec retary ITEM SUMMARY: FINANCIAL IMPACT: . SUBMITTED BY: Karen Fro s t, Rec o rd ing S ecretary ATTACHMENTS: Description Type Minutes _GVPID 04.09.2018 Backup Material Page 2 of 35 Georgetown Village PID Page 1 of 3 Meeting: April 9, 2018 City of Georgetown, Texas Georgetown Village Public Improvement District Advisory Board Meeting Minutes Monday, April 9, 2018 at 6:00 p.m. West Side Service Center located at 5501 Williams Dr. Georgetown, TX 78633 Members present: Norma Baker; Cara McKinney; Marlene McMichael, Vice-chair; Katie Porter; Gary Newman, Developer Rep; and Penny Evans, Developer Rep; William Laing, Alternate and Marsi Liddell, Alternate Members Absent: Melinda Marler, Chair Staff present: Jim Briggs, General Manager of Utilities; Eric Nuner, Asst. Parks Director; Octavio Garza, Public Works Director; Paul Diaz, Budget Manager and Karen Frost, Planning Specialist. The meeting was called to order by Vice-Chair McMichael at 6:02 p.m. A. Consideration and possible action to approve the minutes of the March 12, 2018 regular meeting. Motion by Newman, second by Porter to approve the minutes as presented. Approved 6 – 0. (Marler absent.) B. Discussion and review of PID Brochure for publication. Karen Frost, Recording Secretary Comments were given by commissioners. Briggs says this will be printed and mailed to all residents and will be given to title companies or realtors to continue to hand out to new residents. C. Presentation of the Georgetown Village PID monthly financial reports for the month of March 2018 and the annual budget calendar. La’Mar Kemp This item was moved to the end of the Master Plan item. Kemp explained that 98% of the assessments have been collected and another $157K will be added to the fund balance, which is the amount left after the rest of the year’s expenses. Briggs handed out the analysis of the fund balance, what it is composed of and how much each property’s estimated value and assessment. It shows the tax appraisal and how that has changed annually since 2005. It also shows the income to the PID with the change in assessment rate of 20 cents to 14 cents. This analysis was created 45 days ago, but there are approximately 90 properties to date, to be built out. The next budget would generate about $425 – 450K next year. With a continuous growth coming. We can match expenditures to these projections. The only increase in the revenue after build out will be due to an increase in home values. Briggs explains that the board needs to develop a plan to spend the fund balance to allocated expenses, which can be over several years, but still are allocated. The board discussed the capital assets budget that sets replacement of items as they appreciate and age. A value is assigned to each item and a schedule of when it needs to be replaced. 1134 properties in the PID. Page 3 of 35 Georgetown Village PID Page 2 of 3 Meeting: April 9, 2018 D. Overview of sidewalk repairs and maintenance in GVPID. Garza gave an update of the sidewalk maintenance project and stated the new list of streets was being put out for bids this week. That will include the sidewalks that will be improved because of street tree roots raising the sidewalks. Briggs reported that Public Works is requesting money in this year’s budget process of the city to include sidewalks from Williams Drive along Shell Road past Rosedale to Madrid. The proposed funding is from remaining 2015 bond money. E. Presentation and discussion on GVPID landscape, amenity, and wayfinding signage masterplan. Eric Nuner, Assistant Parks and Recreation Director Covey and KPA presented the plan onscreen, giving an inventory that was taken, their analysis and recommendations. They created a budget for each park as an estimate of costs or renovating the different areas. These can all be altered to be what the board recommends. The pricing is different for each one and is based on the existing conditions of the signs and landscaping. They provided a 5 year plan and ranked their recommendations. McMichael comments that this plan is too over reaching for the money that is available to spend. She states that redoing the entry signs will not benefit the residents in the future. She states she is concerned about overspending and hoping that the spending is for the current residents. Board, consultants and staff discussed the use of the plan and how to address the plan. Briggs says the board will need to make a decision next month on how to allocate the fund excess. McMichael asked for a pdf of the budget numbers only. Nuner says that can be sent. A bound copy will be given to the board at the next meeting of the entire document. Staff will look at the survey and make suggestions that could meet the needs of the residents. Newman explains this plan is good not just for deciding what to do at this point, but continuity for the new developers and any changes made in the future. Briggs summarizes that the staff is to come back with proposals that fit into the budget and see where the board wants to adjust. They all agree that they would rather see the money spent on parks instead of new entry signs. They would like to encourage enhancements as opposed to tearing out and building new signage. They were not enthused about the parks trail system markers. Nuner explains that when the board is reviewing and choosing the items to fund, they need to try to include as much of the price in the project as possible, not try to piece meal the projects. Large items can be cut if necessary, but not individual items, per se. He asks that they not get into the tree or shrub counts, as this is a master, general plan. He also stated that they can get a lower construction cost if they are using the economy of scale to Michael Charles, 244 Beretta. He appreciates McMichaels comments about the plan. He wants to state that the different neighborhoods are not falling into the “Village” and different looks in different areas cannot be all made equal. He wants to see about making space for the kids in Beretta and at 502 Madrid. He wants them to be maintained. Wants irrigation in the parks in Section 9. Page 4 of 35 Georgetown Village PID Page 3 of 3 Meeting: April 9, 2018 Sara Schaub, 616 Rosedale, appreciates the suggestion about a bathroom in the park. She wants parks improved only if they are maintained. She says the Madrid park area looks bad. The area behind Rosedale is a mess. Others commented about this area and the problems. F. Developer's Update - Gary Newman Same status as before. An investment company is looking at the residential. His company will keep commercial and multi-family areas. They are working on an amenity for the west side, near McCoy. There will be a waterline that runs out Shell Road. All the property will be annexed in June. Avanti is being planned also which is on the north side of Berry Creek, along Shell Road, almost to Hwy 195. Adjournment Motion by Newman to adjourn. Second by Porter. The meeting was adjourned at 8:02 p.m. __________________________________ ______________________________ Approved, Marlene McMichael, Vice-Chair Attest, Katie Porter, Secretary Page 5 of 35 City of Georgetown, Texas Georgetown Village Improvement District May 14, 2018 SUBJECT: Disc ussion and p o s s ib le rec o mmendatio n for ranking of the proposed GVPID Mas ter P lan p rio rities. Eric Nuner, As s is tant P arks and Rec reation Direc tor ITEM SUMMARY: The final mas ter plan rec o mmendatio ns are p res ented and disc ussed. Onc e rankings and priorities are id entified , the b o ard will make a recommendatio n to City Counc il for imp rovements and proposed expend itures . FINANCIAL IMPACT: NA SUBMITTED BY: Eric Nuner, As s is tant Parks and Recreatio n Direc to r ATTACHMENTS: Description Type Recommendations from the Mas ter Plan Backup Material Entry Cos t Es timates Backup Material Park Update Cos t Es timates Backup Material Sign Cos t Es timates Backup Material Page 6 of 35 Georgetown Village PID Open Space Recommendations by Covey Landscape Architects High Priority: Madrone Park in Full: $195,227 Bedford Park in Full: $112,798 Entry Monumentation $276,401 Total: $584,426 Medium Priority in any order: Parklets in Full (11): $279,794 Summers Green in Full: $186,736 Rowan Park in Full: $143,141 Shell Road Fence Screening*: $122,531 Secondary Entries: $255,155 Low Priority in any order: Village Pool in Full: $315,517 Trail/Open Space Map: $xxxxx Trail Markers: $xxxxx * Area between Bellaire and Madrid on the South East side of Shell Road Page 7 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.12 $625.00 $7,500.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.650 $4.50 $2,925.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 950 $6.00 $5,700.00 Ornamental grass planting beds Tall shrub beds s.f 600 $6.00 $3,600.00 Tall shrub and evergreen planting beds Low shrub beds s.f 1,651 $6.00 $9,906.00 Low shrub and perenial planting beds Shade trees each 5 $800.00 $4,000.00 65 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress Lawn - Sod s.f 3,000 $0.60 $1,800.00 Buffalo Grass Sod Lawn - Hydromulch s.f 9,000 $0.12 $1,080.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.36 $40.00 $1,440.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.72 $60.00 $4,320.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.96 $60.00 $5,760.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 15,561 $1.25 $19,451.25 Irrigation for planting beds and turf Site grading / demolition c.y.72 $50.00 $3,600.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $750.00 $750.00 Limb up and thin out existing trees Entry Monumentation with sign allow 1 $51,348.00 $51,348.00 Remove old signs, add new with sign panels and lighting. River rock c.y.20 $625.00 $12,500.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.450 $4.50 $2,025.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 291 $6.00 $1,746.00 Ornamental grass planting beds Tall shrub beds s.f 679 $6.00 $4,074.00 Tall shrub and evergreen planting beds Low shrub beds s.f 953 $6.00 $5,718.00 Low shrub and perenial planting beds Shade trees each 5 $800.00 $4,000.00 65 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress Lawn - Sod s.f 1,600 $0.60 $960.00 Buffalo Grass Sod Lawn - Hydromulch s.f 10,000 $0.12 $1,200.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.20 $40.00 $800.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.36 $60.00 $2,160.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.56 $60.00 $3,360.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 12,000 $1.00 $12,000.00 Irrigation for planting beds and turf Site grading / demolition c.y.36 $50.00 $1,800.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $750.00 $750.00 Limb up and thin out existing trees Entry Monumentation w/o sign allow 1 $34,078.00 $34,078.00 Remove old signs, add new without sign panels. $213,851.25 $32,077.69 $24,592.89 $270,521.83 ITEM East Side of Shell Road Subtotal West Side of Shell Road Contingency 15% Landscape Design Services, Permitting, Bidding Total GEORGETOWN VILLAGE (PID) OPEN SPACE MASTERPLAN SHELL ROAD ENTRIES AND FENCE SCREEN - OPINION OF PROBABLE COST (OPC) MAIN ENTRY SHELL ROAD Page 1 of 8Page 8 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.8 $625.00 $5,000.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.250 $4.50 $1,125.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 170 $6.00 $1,020.00 Ornamental grass planting beds Tall shrub beds s.f 317 $6.00 $1,902.00 Tall shrub and evergreen planting beds Low shrub beds s.f 643 $6.00 $3,858.00 Low shrub and perenial planting beds Lawn repair - Hydromulch s.f 2,500 $0.12 $300.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.10 $40.00 $400.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.23 $60.00 $1,380.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.16 $60.00 $960.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 1,200 $1.25 $1,500.00 Irrigation for planting beds and turf Site grading / demolition c.y.23 $50.00 $1,150.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $500.00 $500.00 Limb up and thin out existing trees Neighborhood Entry Sign allow 1 $13,761.00 $13,761.00 Remove old sign, add new using existing concrete footing. $34,606.00 $5,190.90 $3,979.69 $43,776.59 ITEM Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total VILLAGE COMMONS NEIGHBORHOOD ENTRY Page 2 of 8Page 9 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.8 $625.00 $5,000.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.250 $4.50 $1,125.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 170 $6.00 $1,020.00 Ornamental grass planting beds Tall shrub beds s.f 317 $6.00 $1,902.00 Tall shrub and evergreen planting beds Low shrub beds s.f 643 $6.00 $3,858.00 Low shrub and perenial planting beds Lawn repair - Hydromulch s.f 2,500 $0.12 $300.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.10 $40.00 $400.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.23 $60.00 $1,380.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.16 $60.00 $960.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 1,200 $1.25 $1,500.00 Irrigation for planting beds and turf Site grading / demolition c.y.23 $50.00 $1,150.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $500.00 $500.00 Limb up and thin out existing trees Neighborhood Entry Sign allow 1 $13,761.00 $13,761.00 Remove old sign, add new using existing concrete footing. $34,606.00 $5,190.90 $3,979.69 $43,776.59 Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total ITEM ROSEDALE NEIGHBORHOOD ENTRY Page 3 of 8Page 10 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.16 $625.00 $10,000.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.275 $4.50 $1,237.50 4" steel edging with powdercoat finish Ornamental grass beds s.f 250 $6.00 $1,500.00 Ornamental grass planting beds Tall shrub beds s.f 650 $6.00 $3,900.00 Tall shrub and evergreen planting beds Low shrub beds s.f 500 $6.00 $3,000.00 Low shrub and perenial planting beds Lawn repair -Hydromulch s.f 2,500 $0.12 $300.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.14 $40.00 $560.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.30 $60.00 $1,800.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.16 $60.00 $960.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 1,200 $1.25 $1,500.00 Irrigation for planting beds and turf Site grading / demolition c.y.30 $50.00 $1,500.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $500.00 $500.00 Limb up and thin out existing trees Neighborhood Entry Sign allow 1 $17,336.00 $17,336.00 Remove old sign, use new concrete footing. $45,843.50 $6,876.53 $5,272.00 $57,992.03 Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total ITEM MADRID NEIGHBORHOOD ENTRY Page 4 of 8Page 11 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.8 $625.00 $5,000.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.250 $4.50 $1,125.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 170 $6.00 $1,020.00 Ornamental grass planting beds Tall shrub beds s.f 317 $6.00 $1,902.00 Tall shrub and evergreen planting beds Low shrub beds s.f 643 $6.00 $3,858.00 Low shrub and perenial planting beds Lawn repair -Hydromulch s.f 2,500 $0.12 $300.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.10 $40.00 $400.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.23 $60.00 $1,380.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.16 $60.00 $960.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 1,200 $1.25 $1,500.00 Irrigation for planting beds and turf Site grading / demolition c.y.23 $50.00 $1,150.00 Grading and excavation for new planting beds Neighborhood Entry Sign allow 1 $13,761.00 $13,761.00 Remove old sign, add new using existing concrete footing. $34,106.00 $5,115.90 $3,922.19 $43,144.09Total ITEM Landscape Design Services, Permitting, Bidding Subtotal Contingency 15% WESTBURY NEIGHBORHOOD ENTRY Page 5 of 8Page 12 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.8 $625.00 $5,000.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.250 $4.50 $1,125.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 170 $6.00 $1,020.00 Ornamental grass planting beds Tall shrub beds s.f 317 $6.00 $1,902.00 Tall shrub and evergreen planting beds Low shrub beds s.f 643 $6.00 $3,858.00 Low shrub and perenial planting beds Lawn repair -Hydromulch s.f 2,500 $0.12 $300.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.10 $40.00 $400.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.23 $60.00 $1,380.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.16 $60.00 $960.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 1,200 $1.25 $1,500.00 Irrigation for planting beds and turf Site grading / demolition c.y.23 $50.00 $1,150.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $500.00 $500.00 Limb up and thin out existing trees Neighborhood Entry Sign allow 1 $13,761.00 $13,761.00 Remove old sign, add new concrete footing. $34,606.00 $5,190.90 $4,775.63 $44,572.53 Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total BELLAIRE NEIGHBORHOOD ENTRY ITEM Page 6 of 8Page 13 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.8 $625.00 $5,000.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.250 $4.50 $1,125.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 170 $6.00 $1,020.00 Ornamental grass planting beds Tall shrub beds s.f 317 $6.00 $1,902.00 Tall shrub and evergreen planting beds Low shrub beds s.f 643 $6.00 $3,858.00 Low shrub and perenial planting beds Lawn repair -Hydromulch s.f 2,500 $0.12 $300.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.10 $40.00 $400.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.23 $60.00 $1,380.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.16 $60.00 $960.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 1,200 $1.25 $1,500.00 Irrigation for planting beds and turf Site grading / demolition c.y.23 $50.00 $1,150.00 Grading and excavation for new planting beds Tree trimming maintenance allow 1 $500.00 $500.00 Limb up and thin out existing trees Neighborhood Entry Sign allow 1 $17,336.00 $17,336.00 Remove old sign, add new using existing concrete footing. $38,181.00 $5,727.15 $4,390.82 $48,298.97 Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total SYCAMORE NEIGHBORHOOD ENTRY ITEM Page 7 of 8Page 14 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.3 $625.00 $1,875.00 Cobble mulch for planting areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Steel edging l.f.2,646 $4.50 $11,907.00 4" steel edging with powdercoat finish Ornamental grass beds s.f 100 $6.00 $600.00 Ornamental grass planting beds Tall shrub fence screen each 665 $35.00 $23,275.00 5 gallon, tall shrub planted 4' on center Low shrub beds s.f 366 $6.00 $2,196.00 Low shrub and perenial planting beds Lawn repair -Hydromulch s.f 30,000 $0.12 $3,600.00 Repair existing grass with hydromulch Bermudagrass Hardwood mulch c.y.164 $40.00 $6,560.00 Double shredded hardwood mulch, 4" thick Planting mix c.y.245 $60.00 $14,700.00 Excavate 6" existing, replace 6" new and till to 12" depth Topsoil / compost c.y.82 $60.00 $4,920.00 2" of topsoil / compost mixed into existing soil. Irrigation s.f 13,230 $1.25 $16,537.50 Irrigation for planting beds and turf Site grading / demolition c.y.245 $50.00 $12,250.00 Grading and excavation for new planting beds $100,170.50 $15,025.58 $11,519.61 $126,715.68 $678,798.30 Contingency 15% Landscape Design Services, Permitting, Bidding Total SHELL ROAD ENTRIES AND FENCE SCREEN GRAND TOTAL SHELL ROAD PLANTING FOR FENCE SCREENING ITEM Subtotal Page 8 of 8Page 15 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.10 $80.00 $800.00 20'x20' area,4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas River rock c.y.3 $625.00 $1,875.00 Cobble mulch for planting areas Stone boulders each 6 $350.00 $2,100.00 Seating boulders, average size 2'Hx2'Wx3'L Planting beds s.f 250 $9.00 $2,250.00 Approximately 5'x5' various planting pockets City Park sign each 2 $5,148.00 $10,296.00 City park masonry sign Decomposed granite c.y. 80 $80.00 $6,400.00 80'x80' area,4" depth, minus pavilion footprint Steel edging l.f. 320 $4.50 $1,440.00 Bordering decomposed granite areas Pavilion each 1 $85,000.00 $85,000.00 20x30 Metal Frame with standing seam roof Picnic tables each 5 $3,500.00 $17,500.00 As specified in the masterplan Benches each 5 $2,500.00 $12,500.00 As specified in the masterplan Trash receptacles each 3 $2,000.00 $6,000.00 As specified in the masterplan Lawn s.f 17,300 $0.20 $3,460.00 Hydromulch Bermudagrass Irrigation s.f 17,300 $1.00 $17,300.00 Irrigation rotors for lawn areas Mitt Mutt dispensor each 3 $800.00 $2,400.00 As specified in the masterplan Hardwood mulch path s.f 2,760 $1.25 $3,450.00 6' wide, double shredded hardwood mulch, 4" thick Hardwood mulch area s.f 1,000 $1.25 $1,250.00 25'x40' wide, double shredded hardwood mulch, 4" thick Concrete walks s.f 4,190 $8.00 $33,520.00 5' wide, 4" thick concrete Concrete edging at playscape l.f.280 $22.00 $6,160.00 6" wide, 12" depth concrete border Evergreen tree screen each 40 $500.00 $20,000.00 45 gallon, i.e., Wax Myrtle, Yaupon Holly, Mountain Laurel Site grading / demolition allow 1 $10,000.00 $10,000.00 Excavation for decomposed granite and hydromulch areas Tree trimming maintenance allow 1 $5,000.00 $5,000.00 Limb up and thin out existing trees $249,421.00 $37,413.15 $28,683.42 $315,517.57Total GEORGETOWN VILLAGE (PID) OPEN SPACE MASTERPLAN CITY PARK AND PARKLETS - OPINION OF PROBABLE COST (OPC) VILLAGE POOL AND CITY PARK ITEM Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Sign Areas Pavilion Area General Page 1 of 13Page 16 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Concrete walk s.f.800 $9.00 $7,200.00 5' wide, 4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets City Park sign each 1 $5,148.00 $5,148.00 City park masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Seating Areas Pavilion each 1 $85,000.00 $85,000.00 20'x30' Metal Frame with standing seam roof Picnic tables each 5 $3,500.00 $17,500.00 As specified in the masterplan Concrete pad under pavilion s.f.1,500 $9.00 $13,500.00 30'x50', 4" depth Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Concrete accessibility ramps each 1 $750.00 $750.00 One on each side of the street Painted crosswalk allow 1 $1,500.00 $1,500.00 From ramp to ramp Hardwood mulch s.f 4,500 $1.25 $5,625.00 Double shredded hardwood mulch, 4" thick, under dripline Tree trimming maintenance allow 1 $1,500.00 $1,500.00 Limb up and thin out existing trees $147,618.00 $22,142.70 $16,976.07 $186,736.77 Sign Area Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total General SUMMER'S GREEN CITY PARK ITEM Page 2 of 13Page 17 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets City Park sign each 1 $5,148.00 $5,148.00 City park masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Seating Area Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite Concrete walks s.f 1,000 $8.00 $8,000.00 200' l.f., 5' wide, 4" thick concrete Decomposed granite path c.y.16 $80.00 $1,280.00 260' l.f., 5' wide,4" depth Steel edging l.f.440 $4.50 $1,980.00 Bordering decomposed granite path Evergreen tree screen each 10 $500.00 $5,000.00 45 gallon, i.e., Wax Myrtle, Yaupon Holly, Mountain Laurel Shade trees each 25 $1,200.00 $30,000.00 100 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress Lawn s.f 12,000 $0.20 $2,400.00 100'x120' hydromulch Bermudagrass Topsoil / Compost c.y.148 $60.00 $8,880.00 2" layer of topsoil tilled into existing grade Irrigation s.f 12,000 $1.00 $12,000.00 Irrigation rotors for lawn areas Hardwood Mulch s.f.2,000 $1.25 $2,500.00 Under dripline of existing trees,4" depth Tree trimming maintenance allow 1 $1,500.00 $1,500.00 Limb up and thin out existing trees Seating Area Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Benches each 5 $2,500.00 $12,500.00 As specified in the masterplan Trash receptacles each 3 $2,000.00 $6,000.00 As specified in the masterplan $113,155.50 $16,973.33 $13,012.88 $143,141.71 Subtotal Landscape Design Services, Permitting, Bidding Total Sign Area General ROWAN PARK CITY PARK ITEM Contingency 15% Page 3 of 13Page 18 of 35 UNIT QTY.UNIT COST TOTAL REMARKS A. Decomposed granite c.y.3 $80.00 $240.00 10'x15 area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas B. Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Picnic tables each 1 $3,500.00 $3,500.00 As specified in the masterplan Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas C.Vegetation Buffer Evergreen tree screen each 36 $500.00 $18,000.00 45 gallon, i.e., Wax Myrtle, Yaupon Holly, Mountain Laurel D.Shade Trees Shade trees each 19 $800.00 $15,200.00 65 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress E.Manicured Lawn Lawn s.f 7,800 $0.20 $1,560.00 Hydromulch Bermudagrass Irrigation s.f 7,800 $1.00 $7,800.00 Irrigation rotors for lawn areas Topsoil / Compost c.y.50 $60.00 $3,000.00 2" layer of topsoil/compost tilled into existing grade Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas F.Tot Lot Playscape allow 1 $50,000.00 $50,000.00 Various small play elements and pea gravel fall surface Playscape Shade allow 1 $30,000.00 $30,000.00 Fabric shade structure Concrete edging at playscape l.f.280 $22.00 $6,160.00 6" wide, 12" depth concrete border Benches each 2 $2,500.00 $5,000.00 As specified in the masterplan Site grading / demolition allow 1 $2,500.00 $2,500.00 Excavation for playscape Hardwood mulch s.f 3,000 $1.25 $3,750.00 Double shredded hardwood mulch, 3" thick, under dripline $154,330.00 $23,149.50 $17,747.95 $195,227.45 Mailbox Node Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total Seating Area General MADRONE PARK CITY PARK ITEM Page 4 of 13Page 19 of 35 UNIT QTY.UNIT COST TOTAL REMARKS A. Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $1,250.00 Cobble mulch for planting areas Stone boulders each 3 $350.00 $1,050.00 Seating boulders, average size 2'Hx2'Wx3'L Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets City Park sign each 1 $5,148.00 $5,148.00 City park masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas B. Sidewalk Concrete walks s.f 4,000 $8.00 $32,000.00 4' wide, 4" thick concrete C1.Seating Area Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite C2.Seating Area Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Benches each 2 $250.00 $500.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite D. Vegetation Buffer Evergreen tree screen each 25 $500.00 $12,500.00 45 gallon, i.e., Wax Myrtle, Yaupon Holly, Mountain Laurel E. Shade Trees Shade trees each 15 $800.00 $12,000.00 65 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress F. Benches each 2 $2,500.00 $5,000.00 As specified in the masterplan Playscape Per COG Parks Department 2021 Shade over playscape Per COG Parks Department 2021 G. Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.8 $4.50 $36.00 Bordering decomposed granite areas Stone boulders each 3 $350.00 $1,050.00 Seating boulders, average size 2'Hx2'Wx3'L Small park sign each 1 $3,080.00 $3,080.00 Large park masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Hardwood Mulch s.f.2,000 $1.25 $2,500.00 Under dripline of existing trees,3" depth $89,169.00 $13,375.35 $10,254.44 $112,798.79 BEDFORD PARK CITY PARK ITEM Landscape Design Services, Permitting, Bidding Total Sign Area Sign Area / Mailbox Node Playground General Subtotal Contingency 15% Page 5 of 13Page 20 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Hardwood Mulch s.f.2,000 $1.25 $2,500.00 Under dripline of existing trees,3" depth Mitt Mutt dispensor each 2 $800.00 $1,600.00 As specified in the masterplan $4,100.00 $615.00 $565.80 $5,280.80 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Stone boulders each 3 $350.00 $1,050.00 Seating boulders, average size 2'Hx2'Wx3'L Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Existing bench each 1 $250.00 $250.00 Remove and relocate onsite Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Evergreen tree screen each 5 $500.00 $2,500.00 45 gallon, i.e., Wax Myrtle, Yaupon Holly, Mountain Laurel Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Tree trimming maintenance allow 1 $1,000.00 $1,000.00 Limb up and thin out existing trees Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas Small park sign each 1 $3,080.00 $3,080.00 Small park masonry sign Concrete walks s.f 450 $8.00 $3,600.00 5' wide, 4" thick concrete Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Tree trimming maintenance allow 1 $1,000.00 $1,000.00 Limb up and thin out existing trees $21,642.50 $3,246.38 $2,488.89 $27,377.76 Total ADKINS PARK / GREENSIDE PARKLETS ITEM General CREEKSIDE CITY PARK ITEM Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total Greenside Park Adkins Park Page 6 of 13Page 21 of 35 UNIT QTY.UNIT COST TOTAL REMARKS River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Remove existing signs each 1 $250.00 $250.00 Remove and discard Seating Areas Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Hardwood Mulch s.f.2,000 $1.25 $2,500.00 Under dripline of existing trees,4" depth $11,527.50 $1,729.13 $1,325.66 $14,582.29 UNIT QTY.UNIT COST TOTAL REMARKS Seating Areas Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.3 $80.00 $240.00 5' wide, 4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $1,250.00 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Ornamental trees each 17 $500.00 $8,500.00 45 gallon, i.e., Crape Myrtle, Redbud, Mountain Laurel Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Expanded Seating Area Decomposed granite c.y.10 $80.00 $800.00 30'x8' border area,4" depth Steel edging l.f.120 $4.50 $540.00 Bordering decomposed granite areas Hardwood Mulch s.f.1,500 $1.25 $1,875.00 Under dripline of existing trees,4" depth Tree trimming maintenance allow 1 $1,500.00 $1,500.00 Limb up and thin out existing trees $20,670.00 $3,100.50 $2,377.05 $26,147.55 General Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total Sign Area General FAIRFIELD PARKLET ITEM Subtotal HANOVER PARKLET ITEM Contingency 15% Landscape Design Services, Permitting, Bidding Total Page 7 of 13Page 22 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Shell Park Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.4 $80.00 $320.00 5' wide, 4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Seating Areas Decomposed granite c.y.10 $80.00 $800.00 20'x20' area,4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas Stone boulders each 6 $350.00 $2,100.00 Seating boulders, average size 2'Hx2'Wx3'L Trash receptacles each 1 $2,000.00 $2,000.00 As specified in the masterplan Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite General Concrete accessibility ramps each 1 $750.00 $750.00 One on each side of the street Painted crosswalk allow 1 $1,500.00 $1,500.00 From ramp to ramp Westbury Park Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.4 $80.00 $320.00 5' wide, 4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Seating Areas Decomposed granite c.y.10 $80.00 $800.00 20'x20' area,4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas Stone boulders each 6 $350.00 $2,100.00 Seating boulders, average size 2'Hx2'Wx3'L Trash receptacles each 1 $2,000.00 $2,000.00 As specified in the masterplan Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite $31,655.00 $4,748.25 $3,640.33 $40,043.58 SHELL PARK / WESTBURY PARKLETS ITEM Sign Area Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Sign Area Total Page 8 of 13Page 23 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Concrete accessibility ramps each 1 $750.00 $750.00 One on each side of the street Painted crosswalk allow 1 $1,500.00 $1,500.00 From ramp to ramp Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.3 $80.00 $240.00 5' wide, 4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Shade trees each 7 $1,200.00 $8,400.00 100 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Seating Areas Decomposed granite c.y.10 $80.00 $800.00 20'x20' area,4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas Stone boulders each 6 $350.00 $2,100.00 Seating boulders, average size 2'Hx2'Wx3'L Trash receptacles each 1 $2,000.00 $2,000.00 As specified in the masterplan Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Decomposed granite c.y.3 $80.00 $240.00 10'x15 area,4" depth Decomposed granite path c.y.2 $80.00 $160.00 5' wide, 4" depth Steel edging l.f.130 $4.50 $585.00 Bordering decomposed granite areas Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas $26,757.50 $4,013.63 $3,077.11 $33,848.24 GREEN GROVE PARKLET ITEM Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total Sign Area Mailbox Node Page 9 of 13Page 24 of 35 UNIT QTY.UNIT COST TOTAL REMARKS A. Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $1,250.00 Cobble mulch for planting areas Stone boulders each 3 $350.00 $1,050.00 Seating boulders, average size 2'Hx2'Wx3'L Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Low stone retaining wall l.f.25 $100.00 $2,500.00 18" high wall to hold grade and level seating area Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite B. Pathway Decomposed granite path c.y.7 $80.00 $560.00 5' wide, 4" depth Steel edging l.f.360 $4.50 $1,620.00 Bordering decomposed granite areas C. Seating Area River rock c.y.4 $625.00 $2,500.00 Cobble mulch for planting areas Planting beds s.f 250 $9.00 $2,250.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite D. Concrete accessibility ramps each 1 $750.00 $750.00 One on each side of the street Painted crosswalk allow 1 $1,500.00 $1,500.00 From ramp to ramp Hardwood Mulch s.f.2,000 $1.25 $2,500.00 Under dripline of existing trees,3" depth $27,775.00 $4,166.25 $3,194.13 $35,135.38 Park Connection Subtotal Contingency 15% Landscape Design Services, Permitting, Bidding Total Sign Area General SPRING COURT PARKLET ITEM Page 10 of 13Page 25 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.3 $80.00 $240.00 5' wide, 4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Seating Areas Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Exisitng Benches each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Tables each 1 $250.00 $250.00 Remove and relocate onsite Hardwood mulch s.f 2,000 $1.25 $2,500.00 Double shredded hardwood mulch, 4" thick, under dripline Tree trimming maintenance allow 1 $1,500.00 $1,500.00 Limb up and thin out existing trees $18,075.00 $2,711.25 $2,078.63 $22,864.88 Sign Area General Subtotal Landscape Design Services, Permitting, Bidding Total Contingency 15% ITEM VILLAGE GLEN PARKLET Page 11 of 13Page 26 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.3 $80.00 $240.00 5' wide, 4" depth Steel edging l.f.160 $4.50 $720.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Existing trash receptacles each 1 $250.00 $250.00 Remove and relocate onsite Exisitng Mitt Mutt dispensor each 1 $250.00 $250.00 Remove and relocate onsite Seating Areas Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Shade trees each 5 $1,200.00 $6,000.00 100 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress Evergreen tree screen each 5 $500.00 $2,500.00 45 gallon, i.e., Wax Myrtle, Yaupon Holly, Mountain Laurel Tree trimming maintenance allow 1 $1,500.00 $1,500.00 Limb up and thin out existing trees $23,575.00 $3,536.25 $2,711.13 $29,822.38 Sign Area General Subtotal CHESTNUT PARKLET ITEM Contingency 15% Landscape Design Services, Permitting, Bidding Total Page 12 of 13Page 27 of 35 UNIT QTY.UNIT COST TOTAL REMARKS Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Retaining wall / seating wall l.f.20 $200.00 $4,000.00 20' length, 18" height Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Shade trees each 7 $1,200.00 $8,400.00 100 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress Seating Areas Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Decomposed granite path c.y.3 $80.00 $240.00 5' wide, 4" depth River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Stone boulders each 5 $350.00 $1,750.00 Seating boulders, average size 2'Hx2'Wx3'L Existing bench each 1 $250.00 $250.00 Remove and relocate onsite Exisitng picnic table each 1 $250.00 $250.00 Remove and relocate onsite Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Decomposed granite c.y.5 $80.00 $400.00 20'x20' area,4" depth Site grading / demolition allow 1 $1,000.00 $1,000.00 Excavation for decomposed granite and hydromulch areas Steel edging l.f.80 $4.50 $360.00 Bordering decomposed granite areas River rock c.y.2 $625.00 $937.50 Cobble mulch for planting areas Planting beds s.f 125 $9.00 $1,125.00 Approximately 5'x5' various planting pockets Small Parklet Sign each 1 $3,080.00 $3,080.00 Small parklet masonry sign Shade trees each 8 $1,200.00 $9,600.00 100 gallon, i.e., Live Oak, Cedar Elm, Bald Cypress $41,757.50 $6,263.63 $4,802.11 $52,823.24 $1,241,348.35 City Parks 958,703.08$ Parklets $282,645.28 $1,241,348.35 CITY PARK AND PARKLET GRAND TOTAL Total Sign Area / Mailbox Node Sign Area / Mailbox Node Subtotal Contingency 15% CEDAR ELM PARKLET ITEM Landscape Design Services, Permitting, Bidding Page 13 of 13Page 28 of 35 UNIT QTY.UNIT COST TOTAL Stone Veneer f.f.354 $20.00 $7,080.00 Stone Cap s.f.97 $20.00 $1,940.00 CMU f.f.236 $10.00 $2,360.00 Concrete Footing c.y 8 $500.00 $4,000.00 Concrete Piers each 4 $1,000.00 $4,000.00 Cast Stone Inset each 1 $800.00 $800.00 Stone Slab Sign f.f.132 $50.00 $6,600.00 Sandblasted / Paint Sign Letters allow 1 $3,500.00 $3,500.00 Sign Lights each 6 $1,400.00 $8,400.00 Electrical allow 1 $4,000.00 $4,000.00 Demolition of existing sign allow 1 $4,000.00 $4,000.00 $46,680.00 $4,668.00 $51,348.00 $34,078.00 Total Entry Monumentation 2 $85,426.00 UNIT QTY.UNIT COST TOTAL Stone Veneer f.f.87 $20.00 $1,740.00 Stone Cap s.f.24 $20.00 $480.00 CMU f.f.89 $10.00 $890.00 Stone Slab Sign f.f.30 $50.00 $1,500.00 Sandblasted / Paint Sign Letters allow 1 $1,600.00 $1,600.00 Sign Lights each 2 $1,400.00 $2,800.00 Electrical allow 1 $2,500.00 $2,500.00 Demolition of existing sign allow 1 $1,000.00 $1,000.00 $12,510.00 $1,251.00 $13,761.00 Total Neighborhood Entry Signs 4 $13,761.00 $55,044.00 Subtotal ITEM NEIGHBORHOOD ENTRY SIGN - Utilizing existing concrete footing Subtotal ITEM ENTRY MONUMENTATION Individual Monumentation with Sign Panel (East Side) Total Contingency 10% OPEN SPACE MASTERPLAN SIGNAGE - OPINION OF PROBABLE COST (OPC) Individual Monumentation w/o Sign Panel (West Side) Total GEORGETOWN VILLAGE (PID) Contingency 10% Individual Sign Total Page 1 of 4Page 29 of 35 UNIT QTY.UNIT COST TOTAL Stone Veneer f.f.87 $20.00 $1,740.00 Stone Cap s.f.24 $20.00 $480.00 CMU f.f.89 $10.00 $890.00 Stone Slab Sign f.f.30 $50.00 $1,500.00 Sandblasted / Paint Sign Letters allow 1 $1,600.00 $1,600.00 Sign Lights each 2 $1,400.00 $2,800.00 Electrical allow 1 $2,500.00 $2,500.00 Concrete Footing c.y 3 $500.00 $1,250.00 Concrete Piers each 2 $1,000.00 $2,000.00 Demolition of existing sign allow 1 $1,000.00 $1,000.00 $15,760.00 $1,576.00 $17,336.00 Total Neighborhood Entry Signs 2 $17,336.00 $34,672.00 UNIT QTY.UNIT COST TOTAL Stone Veneer f.f.84 $20.00 $1,680.00 CMU f.f.0 $10.00 $0.00 Sign allow 1 $3,000.00 $3,000.00 Concrete Footing c.y 2 $500.00 $1,000.00 $5,680.00 $568.00 $6,248.00 Total City Park Signs 6 $6,248.00 $37,488.00 UNIT QTY.UNIT COST TOTAL Stone Veneer f.f.40 $20.00 $800.00 CMU f.f.0 $10.00 $0.00 Sign allow 1 $500.00 $500.00 Sign Letters allow 1 $1,000.00 $1,000.00 Concrete Footing c.y 1 $500.00 $500.00 $2,800.00 $280.00 $3,080.00 Total Parklet Signs 11 $3,080.00 $33,880.00 CITY PARK SIGN Individual Sign Total ITEM NEIGHBORHOOD ENTRY SIGN - Adding new concrete footing ITEM Subtotal Contingency 10% Individual Sign Total PARKLET SIGN ITEM Subtotal Contingency 10% Individual Sign Total Subtotal Contingency 10% Page 2 of 4Page 30 of 35 UNIT QTY.UNIT COST TOTAL Stone Veneer f.f.50 $20.00 $1,000.00 CMU f.f.45 $10.00 $450.00 Steel Sign Panel each 1 $500.00 $500.00 Direct Embed Coating / signage allow 1 $2,000.00 $2,000.00 Concrete Footing allow 1 $500.00 $500.00 $4,450.00 $445.00 $4,895.00 Total Open Space Signs 6 $4,895.00 $29,370.00 UNIT QTY.UNIT COST TOTAL 4" Steel Post each 1 $250.00 $250.00 Steel Sign Panel each 1 $250.00 $250.00 Direct Embed Coating / signage allow 1 $1,000.00 $1,000.00 Concrete Footing allow 1 $100.00 $100.00 $1,600.00 $160.00 $1,760.00 Total Trail Markers 8 $1,760.00 $14,080.00 UNIT QTY.UNIT COST TOTAL 4" Steel Post each 1 $100.00 $100.00 Direct Embed Coating / signage allow 1 $500.00 $500.00 Concrete Footing allow 1 $100.00 $100.00 $700.00 $70.00 $770.00 Total Distance Markers 20 $770.00 $15,400.00 $305,360.00SIGNAGE GRAND TOTAL ITEM Subtotal Contingency 10% Individual Sign Total TRAIL MARKERS (not included in the City Park / Parklet (OPC) DISTANCE MARKERS (not included in the City Park / Parklet (OPC) ITEM Subtotal Contingency 10% Individual Sign Total OPEN SPACE SIGN (not included in the City Park / Parklet (OPC) ITEM Subtotal Contingency 10% Individual Sign Total Page 4 of 4Page 31 of 35 City of Georgetown, Texas Georgetown Village Improvement District May 14, 2018 SUBJECT: Presentatio n of the Georgetown Village Public Improvement Dis tric t (GVPID) monthly financial rep o rts for the month of April 2018. Elaine Wils o n, Controller ITEM SUMMARY: FINANCIAL IMPACT: None. SUBMITTED BY: La'Mar Kemp , Ac c o untant ATTACHMENTS: Description Type 04.2018 Financial Summary and Statement Backup Material Page 32 of 35 17/18 Budget YTD Activity Variance Revenues: Ad Valorem Taxes 388,128$ 381,905$ (6,223)$ Interest Earned 2,000 5,047 3,047 Total Revenues 390,128 386,951 (3,177) Expenditures: Administrative Fee- General Fund 47,858 24,566 23,292 Office Supplies 500 - 500 Brochures, Advertising 3,000 - 3,000 Insurance 2,000 362 1,638 Contracts & Leases, Primary 90,160 90,112 48 Contracts & Leases, Secondary 28,479 - 28,479 Park Master Plan 70,000 59,490 10,510 Above Ground Improvements 38,000 - 38,000 Signs 4,813 - 4,813 Utilities/Irrigation 36,000 25,105 10,895 Maintenance, Sidewalks 42,164 1,746 40,418 Maintenance, Irrigation 10,900 955 9,946 Maintenance, Ponds 3,000 - 3,000 Maintenance, Alleys 20,000 3,050 16,950 Maintenance, Street Trees 60,000 21,600 38,400 Administrative Fee - Joint Service 8,966 5,229 3,737 Total Expenditures 465,840 232,215 233,625 Current Year Variance (75,712) 154,736 230,448 Beginning Fund Balance 677,161 713,772 [A]36,611 Current Funds Available 601,449$ 868,508$ 267,059$ Notes: •The majority of property tax collections occur in January. •YTD activity includes encumbrances. •Year End YTD activity becomes audited activity each following January. •Fiscal year is from October 1 to September 30. •Unaudited financial statements prepared by the City of Georgetown, as of May 03, 2018. [A]Audited budgetary basis fund balance. Financial Statement Village PID April 30, 2018 Page 33 of 35 5-03-2018 08:24 AM C I T Y O F G E O R G E T O W N PAGE: 1 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: APRIL 30TH, 2018 ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET REVENUES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ REVENUE ======= PRIMARY REVENUE 4-0001-40-100 AD VALOREM TAX 388,128.00 0.00 381,904.72 98.40 0.00 6,223.28 TOTAL PRIMARY REVENUE 388,128.00 0.00 381,904.72 98.40 0.00 6,223.28 INTEREST 4-0001-42-100 ALLOCATED INTEREST 2,000.00 0.00 4,907.67 245.38 0.00 ( 2,907.67) 4-0001-42-152 GISD TAX (PID) INTEREST 0.00 0.00 138.98 0.00 0.00 ( 138.98) TOTAL INTEREST 2,000.00 0.00 5,046.65 252.33 0.00 ( 3,046.65) DEVELOPMENT FEE _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ TOTAL REVENUE 390,128.00 0.00 386,951.37 99.19 0.00 3,176.63 VILLAGE PID =========== OTHER _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ _____________________________________________________________________________________________________________________________ *** TOTAL REVENUES *** 390,128.00 0.00 386,951.37 99.19 0.00 3,176.63 ============= ============= ============= ====== ============== =============== _____________________________________________________________________________________________________________________________ Page 34 of 35 5-03-2018 08:24 AM C I T Y O F G E O R G E T O W N PAGE: 2 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: APRIL 30TH, 2018 COMMUNITY SERVICES VILLAGE PID ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ OPERATIONS 5-0211-51-110 GENERAL FUND ALLOCATION 47,858.00 2,313.00 24,566.00 51.33 0.00 23,292.00 5-0211-51-111 OFFICE SUPPLIES 500.00 0.00 0.00 0.00 0.00 500.00 5-0211-51-130 BROCHURES, ADVERTISING 3,000.00 0.00 0.00 0.00 0.00 3,000.00 5-0211-51-200 INSURANCE 2,000.00 0.00 361.65 18.08 0.00 1,638.35 5-0211-51-310 CONTRACT & LEASES, PRIMARY 90,160.00 0.00 45,184.84 99.95 44,927.48 47.68 5-0211-51-311 CONTRACT & LEASES, SECONDA 28,479.00 0.00 23,189.00 0.00 ( 23,189.00) 28,479.00 5-0211-51-315 PARK MASTER PLAN 70,000.00 10,815.00 49,505.00 84.99 9,985.00 10,510.00 5-0211-51-341 ABOVE GROUND IMPROVEMENTS 38,000.00 0.00 0.00 0.00 0.00 38,000.00 5-0211-51-342 SIGNS 4,813.00 0.00 0.00 0.00 0.00 4,813.00 5-0211-51-430 UTILITIES 36,000.00 2,143.57 25,105.13 69.74 0.00 10,894.87 5-0211-51-501 MAINT, ALLEYS/SIDEWALKS 42,164.00 0.00 32,833.08 4.14 ( 31,086.74) 40,417.66 5-0211-51-502 MAINT, IRRIGATION 10,900.00 799.50 799.50 8.76 155.00 9,945.50 5-0211-51-503 MAINT , PONDS 3,000.00 0.00 0.00 0.00 0.00 3,000.00 5-0211-51-506 MAINT, ALLEYS 20,000.00 0.00 6,537.13 15.25 ( 3,487.13) 16,950.00 5-0211-51-507 MAINT, STREET TREES 60,000.00 0.00 21,600.00 36.00 0.00 38,400.00 5-0211-51-950 JOINT SERVICES ALLOCATION 8,966.00 747.00 5,229.00 58.32 0.00 3,737.00 TOTAL OPERATIONS 465,840.00 16,818.07 234,910.33 49.85 ( 2,695.39) 233,625.06 ____________________________________________________________________________________ TOTAL VILLAGE PID 465,840.00 16,818.07 234,910.33 49.85 ( 2,695.39) 233,625.06 _____________________________________________________________________________________________________________________________ TOTAL COMMUNITY SERVICES 465,840.00 16,818.07 234,910.33 49.85 ( 2,695.39) 233,625.06 _____________________________________________________________________________________________________________________________ *** TOTAL EXPENSES *** 465,840.00 16,818.07 234,910.33 49.85 ( 2,695.39) 233,625.06 ============= ============= ============= ====== ============== =============== *** REVENUES OVER/(UNDER) EXPENSES( 75,712.00)( 16,818.07 152,041.04 204.38- 2,695.39 ( 230,448.43) *** END OF REPORT *** Page 35 of 35