HomeMy WebLinkAboutAgenda CC 01.27.2015 WorkshopNotice of Meeting of the
Governing Body of the
City of Georgetown, Texas
JANUARY 27, 2015
The Georgetown City Council will meet on JANUARY 27, 2015 at 3:30 P.M. at the Council Chambers, 101
E. 7th St., Georgetown, Texas
The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you
require assistance in participating at a public meeting due to a disability, as defined under the ADA,
reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City
Secretary's Office, least four (4) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at
113 East 8th Street for additional information; TTY users route through Relay Texas at 711.
Policy Development/Review Workshop -
A Overview of 2015/16 Budget Process and Council Direction to Staff -- Micki Rundell, Chief Financial
Officer and Jim Briggs, Interim City Manager
B Discussion and Presentation on the 2015 Road Bond Recommendations -- Edward G. Polasek, AICP,
Transportation Services Director, Micki Rundell, Chief Financial Officer and Tom Crawford, 2015
Road Bond Committee Chair
C Update and Discussion regarding MRAP -- Wayne Nero, Chief of Police
D Update on Public Safety Operations and Training Center -- Codi Newsom, Senior Project Manager and
Wayne Nero, Chief of Police
Executive Session
In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon's Texas Codes,
Annotated, the items listed below will be discussed in closed session and are subject to action in the regular
session.
E Sec. 551.071: Consultation with Attorney
- Advice from attorney about pending or contemplated litigation and other matters on which the
attorney has a duty to advise the City Council, including agenda items
- Public Safety Complex
- Summit at The Rivery Project
- Hughes Eminent Domain Suit
Sec. 551.074: Personnel Matters
- Interim City Manager, City Attorney, City Secretary and Municipal Judge: Consideration of the
appointment, employment, evaluation, reassignment, duties, discipline, or dismissal of a public officer
or employee as allowed under Tex. Gov. Code
Sec. 551.087: Deliberation Regarding Economic Development Negotiations
- Albertson's Building
Adjournment
Certificate of Posting
I, Jessica Brettle, City Secretary for the City of Georgetown, Texas, do hereby certify that this Notice of
Meeting was posted at City Hall, 113 E. 8th Street, a place readily accessible to the general public at all
times, on the _____ day of _________________, 2015, at __________, and remained so posted for at least
72 continuous hours preceding the scheduled time of said meeting.
__________________________________
Jessica Brettle, City Secretary
City of Georgetown, Texas
City Council Agenda
January 27, 2015
SUBJECT:
Overview of 2015/16 Budget Process and Council Direction to Staff -- Micki Rundell, Chief Financial
Officer and Jim Briggs, Interim City Manager
ITEM SUMMARY:
This workshop will kick off the 2015/16 Annual Budget process including:
Brief overview of the City’s 5 Focus Areas
Economic Development
Signature Destination
Public Safety
Transportation
Utilities
Review 2014/15 accomplishments/goals
Affirm priorities already underway
Policy direction on the 2015 Tax Rate
Review outline of Council budget workshops from current through adoption
COMMENTS
All 2015/16 BUDGET WORKSHOPS will be clearly identified during the upcoming months. Issues or items
that need additional information or further discussion will be moved to a ‘PARKING LOT’ that will be
reviewed before the budget is finalized in late July.
ATTACHMENT
Budget Process Presentation
FINANCIAL IMPACT:
None
SUBMITTED BY:
Becky Huff
ATTACHMENTS:
Budget Process Presentation
Cover Memo
Item # A
2015/16
Annual Budget
Process Overview
Attachment number 1 \nPage 1 of 19
Item # A
2015/16 Budget Focus:
Stabilization & Completion of
Existing Projects
• No separate Council planning retreat
–Focus projects in existing Strategic Plan
• No new initiatives or major requests
–Complete what is already on the table
Attachment number 1 \nPage 2 of 19
Item # A
Process at the Council Level
• Regular workshops on components of the
budget process
– Each session clearly posted as “Budget
Workshop”
– Help Council link early steps to summer balancing
& adoption process
– Expand & build on last year’s process with earlier
wrap up by Council
•Leave budget balancing for major items
and excess fund balance to Council
– – Not Executive Team
Attachment number 1 \nPage 3 of 19
Item # A
January 27 –Budget “Kick off”
Workshop Goals
• Brief overview of 5 focus areas
• Review 2014/15
accomplishments/goals
• Affirm priorities already underway
• Policy direction on 2015 tax rate
– Goal is to reduce tax rate
• Review outline of workshops
Attachment number 1 \nPage 4 of 19
Item # A
FOCUS AREA:
ECONOMIC
DEVELOPMENT
CITY REVENUE
OVERVIEW
FOCUS AREA:
PUBLIC SAFETY
BUDGET
ADOPTION
FISCAL &
BUDGETARY
POLICY
FOCUS AREA:
SIGNATURE
DESTINATION
& GCP
DEBT
OVERVIEW
FIVE YEAR PLAN
UPDATE
ANNUAL
BUDGET
PRESENTATION
FOCUS AREA:
TRANSPORTATION
& CIP
FOCUS AREA:
CROSSCUTTING
THEMES
BUDGET
PUBLIC
HEARINGS
BUDGET
PARKING LOT
COMPENSATION
BENEFITS &
SELF
INSURANCE
FOCUS AREA:
UTILITY & CIP
Attachment number 1 \nPage 5 of 19
Item # A
City’s Five Focus Areas
Economic Development
Signature Destination
Public Safety
Transportation
Utilities
• Each area has Strategic Business Plan
– Updated & reviewed annually
– Guides the Annual Budget process
Attachment number 1 \nPage 6 of 19
Item # A
Focus Area:Economic Development
Accomplishments:
• Gateway Plan
– Created South
Georgetown TIRZ
• Diversify Tax Base
– 2 new Medical
Hospitals
– Expansion of TLCC
• KJScientific (TLCC)
• Radiation Detection Co
Continuing Efforts:
• Gateway Plan
– Developing Pecan
Branch Center
• DisperSol (TLCC)
• Molecular Templates
(TLCC)
•STI
• Tasus
Attachment number 1 \nPage 7 of 19
Item # A
Focus Area: Signature Destination
Accomplishments:
• Updated & Implement
Downtown Master Plan
– Expanded DT TIRZ
– HARC amendments
– Completed sidewalk &
street projects
– Parking Study (in
process)
– Parking Lot
• Redesigned City Website
Continuing Efforts:
• Develop Garey Park
Operations & Maintenance
• Continue Master Planning –
SG Park & West Side Park
• Continue Historic Landmark
process
• Begin development of
Downtown West Civic Center
• Plan for Convention Center
servicing
• Construct VFW Park
renovations/parking
Attachment number 1 \nPage 8 of 19
Item # A
Focus Area: Public Safety (Fire)
Accomplishments:
• Developed fire-based
paramedic program
• Replaced early
warning sirens
• Adopted Fire Code
• Public Outreach
Programs
• Improved diversity -
”Green” Academy
Continuing Efforts:
• Implement fire-based
paramedic program
• Develop EMS Franchise
Agreement & Partnerships
• Improve Dispatch &
Communication
• Continue efforts for
market-competitive pay &
retention
Attachment number 1 \nPage 9 of 19
Item # A
Focus Area: Public Safety (Police)
Accomplishments:
• Completed PSOTC
• Implemented a
competitive pay plan
• Significantly reduced
burglary of vehicles
– Down 28% from last
year & down 56% over
last 3 years
Continuing Efforts:
• Enhance Public Safety
operations at PSOTC
• Focus on Community
Engagement
• Work on Recruiting/Hiring
• Conduct a Police staffing
study
• Work for accreditation thru
Texas Police Chief’s Best
Practice Recognition
Program
Attachment number 1 \nPage 10 of 19
Item # A
Focus Area:Transportation
Accomplishments:
• Renewed ¼ cent street
maintenance sales tax
• Completed sidewalk
master plan
• Completed OTP update
• Worked to bring 2015
Road Bond to voters
• FM 1460 Construction
• Completed N. Austin
Ave Sidewalk
Continuing Efforts:
• Continue development of
Public Transportation options
• Continue Update of Airport
Master Plan
• Complete Road 2015
Maintenance plan based
• Continue development of
Traffic Management System
• Complete Year 1 MS4
Stormwater Permit
Requirements
Attachment number 1 \nPage 11 of 19
Item # A
Focus Area:Utilities
Accomplishments:
• Completed CTSUD
consolidation
• Secured LT renewable
energy sources
• Completed EAM
implementation
• Continued conservation
efforts
• Settled LCRA lawsuit
Continuing Efforts:
• Complete Westside
Service Center
• Implement new billing &
customer service
software
• Develop local solar
solution
Attachment number 1 \nPage 12 of 19
Item # A
Crosscutting Themes
Accomplishments:
• Created training
programs for Boards
• Continued to develop
Self-Insurance Plan
• Updated market data
for 100 positions
• Updated purchasing
processes
Continuing Efforts:
• Determine specifications
for new Financial Software
• Target lowered 2015/16
property tax rate
• Continue Internal Control
reviews & improvements
Attachment number 1 \nPage 13 of 19
Item # A
Additional BUDGET FOCUS
• Funding Goal
– REDUCE TAX RATE in 2015/16
• Clarify Council Direction
– City Council “balances” excess / 1-time funding
• Ensure communication
– Specifically identify ‘BUDGET WORKSHOPS”
– Create “PARKING LOT” for follow up or
unresolved items and issues
Attachment number 1 \nPage 14 of 19
Item # A
Council Budget Workshops
• February 24 – Annual Debt Presentation
•March
– Compensation, Benefits & Self Insurance
• Finalized in June
• April
– Fiscal & Budgetary policy review & update
– Start Capital Project Review by Focus Area
•May
– Continue budget reviews by Focus Area
• Wrap up by 2
nd meeting
Attachment number 1 \nPage 15 of 19
Item # A
Council Budget Workshops
• June – 1
st Meeting
– GUS & Transportation CIP
– Asset Maintenance
• Including ISF’s, Parks, Streets & Utilities
• Update Comp & Benefits (insurance)
• June – 2
nd Meeting
– Revenue overview – sales taxes, utilities
• July – 1
st Meeting
– Five year financial plan review
Attachment number 1 \nPage 16 of 19
Item # A
Council Budget Workshops
July 20 & 21 – presentations
• 2015/16 Annual Budget Overview to include:
–Division/Department reviews
–2015/16 available funds
• Both new revenues & General Fund excess
balance
• Costs of Council priorities
• Council to balance
– Proposed Tax Rate should be final
Attachment number 1 \nPage 17 of 19
Item # A
Council Budget Workshops
• July 28
– Schedule Public Hearings for Proposed Budget
& Tax Rate
• August & September
– Public hearings
• August 11 & August 18
–1st Readings of Budget Ordinances – August 25
– Final Adoption – 2
nd Reading – September 8
Attachment number 1 \nPage 18 of 19
Item # A
Questions?
Attachment number 1 \nPage 19 of 19
Item # A
City of Georgetown, Texas
City Council Agenda
January 27, 2015
SUBJECT:
Discussion and Presentation on the 2015 Road Bond Recommendations -- Edward G. Polasek, AICP,
Transportation Services Director, Micki Rundell, Chief Financial Officer and Tom Crawford, 2015 Road
Bond Committee Chair
ITEM SUMMARY:
The Road Bond Committee is meeting Wednesday January 21st, to consider comments and suggestions
received from City Council at their January 13th Workshop. Attached is a revised presentation and proposal
staff prepared in advance of that meeting.
The Road Bond Committee will consider and vote on this proposal and results will be made available to City
Council after the posting deadline for the January 27th City Council Workshop.
FINANCIAL IMPACT:
Future Road Bond Consideration
SUBMITTED BY:
Edward G. Polasek, AICP
ATTACHMENTS:
Road Bond Committee Alternative Proposal
2015 Bond List
2008 Bond Report
Cover Memo
Item # B
2015 Road Bond Committee
Recommendations Updated
from January 13 Workshop
City Council Workshop
January 27, 2015
City of Georgetown DRAFT
Attachment number 1 \nPage 1 of 18
Item # B
Agenda
•Decision on Austin Avenue Bridges.
–Bond Program or CO.
–4 lane or 5 lane.
•Bond Program to include priority projects
from each of the Objectives in 10 year
package.
•Build some projects, develop others.
–Start with Commitment List.
•Bond Package from $70 to $100 million.
•Create Track record of project delivery.
City of Georgetown DRAFT
Attachment number 1 \nPage 2 of 18
Item # B
Results to Date
•9 Objectives
1.Repair Critical Faults on Austin Ave. Bridges
2.Reduce Traffic on Williams Dr. and Improve
Circulation in the Gateway area
3.Reduce Traffic on SH 29
4.Repair Urgent Sidewalk ADA and Safety Issues
5.Reduce Congestion and Improve Traffic Flow on
Leander Rd.
6.Improve Intersection Management
7.Improve Accessibility to GISD Facilities from Austin
Ave. and FM 971
8.Improve Safety and Access from SH 29 to Sam
Houston Ave.
9.Improve Capacity and Safety of eastern SH 29
City of Georgetown DRAFT
Attachment number 1 \nPage 3 of 18
Item # B
City of Georgetown DRAFT
Objective # 1- Repair Critical Faults on Austin Ave Bridges
Roadway
Project
Net Cost
to Complete
CT Austin Ave. Bridges
(4 Lane Design with Left Turn Lanes) $ 14.3 M
Austin Ave. Bridges
(4 Lane Design) $ 10.6 M
Attachment number 1 \nPage 4 of 18
Item # B
Decision on Austin Avenue Bridges
–Bond Program or CO:
•Recommend CO as additional funding sources may
change over time.
–4 lane or 5 lane:
•4 lane bridge (ADA pedestrian access only $10.4 M).
•5 lane (Bond Committee recommendation) includes
lane improvements between bridges and north to
Morrow with no intrusion into downtown ($14.3 M).
•Either recommendation: structural integrity of
bridges requires complete replacement.
City of Georgetown DRAFT
Attachment number 1 \nPage 5 of 18
Item # B
Bond Commitment List
City of Georgetown
DRAFT
•2nd to 6th Ranked projects by Committee.
–Southwest Bypass and Wolf Ranch Parkway,
part of Industrial District Agreement
(Objective #3).
–NW Blvd Bridge, Rivery Blvd. Extension and
IH 35 NB Frontage Road part of Rivery
Conference Center TIA Improvements and
Williamson County Interlocal (Objective #2).
OTP Roadway
Project Commitment Functional
Classification Project Costs Contigency Issuance Net Cost
to Complete Cumulative
Committed
*C AE Northwest Blvd Bridge - Fontana Dr To Austin Ave High Commitment Major Arterial $ 11,020,000 $ 1,102,000 $ 275,500 $ 12,397,500 $ 12,397,500
*C AD Rivery Blvd Extension - Williams Dr To Northwest Blvd High Commitment Collector $ 5,907,000 $ 590,700 $ 147,675 $ 6,645,375 $ 19,042,875
*C AF IH 35 NB Frontage Road - Williams Dr To Lakeway Bridge High Commitment Frontage $ 6,243,000 $ 624,300 $ 156,075 $ 7,023,375 $ 26,066,250
*C AZ1 Southwest Bypass - Wolf Ranch Pkwy To Leander Rd Medium Commitment Freeway $ 13,530,000 $ 1,353,000 $ 338,250 $ 15,221,250 $ 41,287,500
*C BC Wolf Ranch Pkwy - DB Wood Dr To Southwest Bypass Medium Commitment Minor Arterial $ 3,168,000 $ 316,800 $ 79,200 $ 3,564,000 $ 44,851,500
Attachment number 1 \nPage 6 of 18
Item # B
Objective # 2-Reduce Traffic on Williams Dr. and Improve
Circulation in the Gateway area
City of Georgetown DRAFT
Rivery Blvd.
$6.6 M
4 Lane Divided Roadway
Williams Dr.
$2.1 M
Deceleration & Right Turning Lane
N.W. Blvd Rd & Bridge
$12.4M
4 Lane Roadway & Bridge
I 35 NB Frontage Rd.
$7.0 M
New location for NB Frontage Rd.
I 35 SB Frontage Rd
$4.7 M
I 35 SB Frontage Rd.
Objective # 2
Total
$26.0 M
Attachment number 1 \nPage 7 of 18
Item # B
City of Georgetown DRAFT
Objective # 3- Reduce Traffic on SH 29
Shell Rd.
$20.7 M
4 Lanes of Ultimate 6
DB Wood Rd.
$20.2 M
Widen to 4 Lane Divided
SE. Inner Loop
$12.4 M
Widen to 5 Lanes
SE. Inner Loop
$29.6 M
4 Lanes of Ultimate FWY
SW. Bypass
$15.2 M
2 Lanes of Ultimate FWY
Leander Rd.
$5.2 M
Widen to 5 Lanes
DB Wood Rd.
$18.3 M
Widen to 4 Lanes
Wolf Ranch Pkwy
$3.6 M
2 of Ultimate 4 Lanes
SW. Bypass
$4.2 M
2 Lanes of Ultimate FWY
Objective # 3
Total
$18.8 M
Objective # 3
Project
Development
$23.5 M
Attachment number 1 \nPage 8 of 18
Item # B
City of Georgetown DRAFT
Objective # 4-Repair Urgent Sidewalk ADA and Safety Issues
Roadway
Project
Net Cost
to Complete Bond Proposal
Sidewalk, Safety & ADA
Pool $ 10.3 M $5.1
Attachment number 1 \nPage 9 of 18
Item # B
City of Georgetown DRAFT
Roadway
Project
Net Cost
to Complete
CS Leander Rd
Bridge @ IH 35 $4.5 M
Funding to provide “shovel ready “
Schematic and Construction Plans,
Specifications and Estimate for a
future TxDOT project.
Objective # 5 - Reduce Congestion & Improve Traffic Flow on
Leander Road
CS $4.5 M
Attachment number 1 \nPage 10 of 18
Item # B
Objective #6 Improve Intersection Management
City of Georgetown
DRAFT
Roadway
Project
Net Cost
to Complete Bond Proposal
Site Specific Projects
Program $ 10.3 M $5.1 M
JIMHOGGRD
JIM
H
O
G
G
D
R
WILLIAMSDR
RM
2
3
3
8
Jim Hogg Dr. and Williams Dr. Serenada Dr. and Williams Dr.
Objective # 6-Improve Intersection Management
Example Intersection Improvements
Attachment number 1 \nPage 11 of 18
Item # B
City of Georgetown
DRAFT
Objective # 7-Improve Accessibility to GISD Facilities from Austin
Ave. and FM 971
Stadium Dr.
$1 M
4 Lane Divided
NE. Inner Loop
$1 M
4 Lane Divided
Objective # 7
Total
$10.0 M
Objective # 7
Project
Development
$2.0 M
Attachment number 1 \nPage 12 of 18
Item # B
Objective # 8-Improve Safety and Access from SH 29 to Sam
Houston Ave
Roadway
Project
Net Cost
to Complete
BP Southwestern
Blvd. $ 4.2 M
City of Georgetown DRAFT
Attachment number 1 \nPage 13 of 18
Item # B
City of Georgetown DRAFT
Roadway
Project
Net Cost
to Complete
AT SH 29 $ 4.5 M
Funding to provide “shovel ready “
Schematic and Construction Plans,
Specifications and Estimate for a
future TxDOT project.
Objective # 9-Improve Capacity and Safety of eastern SH29
Attachment number 1 \nPage 14 of 18
Item # B
Committee Minimal Bond
Funding
•8 construction projects.
•5 projects are currently in the final design
phase.
•Sidewalk and Intersection Pool created.
•$70.0 M over a 10 year timeframe
addressing all priority areas.
City of Georgetown DRAFT
Attachment number 1 \nPage 15 of 18
Item # B
Committee Recommended
Bond Funding
•Minimal Project List plus the
following projects:
•Leander Road (River Ridge to SW Bypass)
$5.2 M. Committee #10/BJ2.
•D. B. Wood Road (SH 29 to Oak Ridge Drive)
$18.3 M. Committee # 11/AN.
•$6.8 M in project development funds for
remaining priority projects on list.
•Total Recommendation $100 Million
City of Georgetown DRAFT
Attachment number 1 \nPage 16 of 18
Item # B
Remaining Meetings
City of Georgetown DRAFT
•January 27, 2015 – City Council Workshop – Second presentation
•January 28, 2015 – Road Bond Committee Meeting
•February 4, 2015 – Road Bond Committee Meeting
•February 10, 2015 – Road Bond Call by City Council
•February 11, 2015 – Road Bond Committee Meeting
•February 18, 2015 – Road Bond Committee Meeting
•February 24, 2015 – Final date for Road Bond Call by City Council
Attachment number 1 \nPage 17 of 18
Item # B
Questions?
City of Georgetown DRAFT
Attachment number 1 \nPage 18 of 18
Item # B
OTP Roadway
Project Commitment Functional
Classification Project Costs Contigency Issuance Net Cost
to Complete Cumulative
*C AE Northwest Blvd Bridge - Fontana Dr To Austin Ave High Commitment Major Arterial 11,020,000$ 1,102,000$ 275,500$ 12,397,500$ 12,397,500$
*C AD Rivery Blvd Extension - Williams Dr To Northwest Blvd High Commitment Collector 5,907,000$ 590,700$ 147,675$ 6,645,375$ 19,042,875$
*C AF IH 35 NB Frontage Road - Williams Dr To Lakeway Bridge High Commitment Frontage 6,243,000$ 624,300$ 156,075$ 7,023,375$ 26,066,250$
*C AZ1 Southwest Bypass - Wolf Ranch Pkwy To Leander Rd Medium Commitment Freeway 13,530,000$ 1,353,000$ 338,250$ 15,221,250$ 41,287,500$
*C BC Wolf Ranch Pkwy - DB Wood Dr To Southwest Bypass Medium CommitmentMinor Arterial 3,168,000$ 316,800$ 79,200$ 3,564,000$ 44,851,500$
*C -Intersection/Capital Pool High -5,000,000$ -$ 125,000$ 5,125,000$ 49,976,500$
*D CS Leander Rd Bridge @ IH 35 High -4,000,000$ 100,000$ 4,100,000$ 54,076,500$
*C -Sidewalk, Safety and ADA Accessibility Pool High -5,000,000$ -$ 125,000$ 5,125,000$ 59,201,500$
*D AJ NE Inner Loop - Stadium Dr To FM 971 High Major Arterial 1,000,000$ 25,000$ 1,025,000$ 60,226,500$
*D CQ Stadium Dr (CR 151) - Austin Ave To NE Inner Loop Medium Minor Arterial 1,000,000$ 25,000$ 1,025,000$ 61,251,500$
*C BP Southwestern Blvd - Raintree Dr To SE Inner Loop Medium Collector 3,723,000$ 372,300$ 93,075$ $ 4,188,375 $ 65,439,875
*D AT SH 29 (Haven Lane to SH130)Medium Major Arterial 4,000,000$ 100,000$ 4,100,000$ 69,539,875$
*C BJ2 Leander Rd (RM 2243) - 400ft W of SWBypass to River Ridge Dr Medium Major Arterial 4,650,000$ 465,000$ 116,250$ 5,231,250$ 74,771,125$
*C AN DB Wood Dr - SH 29 To Oak Ridge Dr Medium Minor Arterial 16,320,000$ 1,632,000$ 408,000$ 18,360,000$ 93,131,125$
*D
Preliminary Engineering to begin making Projects from
original Bond List shovel ready: AC, AO, BU, BG, AZ2,
HH, QQ, TT Medium 6,700,000$ 167,500$ 6,867,500$ 99,998,625$
99,998,625$
Revised Project List Based on Jan 13th Workshop
Project Development Pool
* C - Construction D - Design
Committed
Additional Project List
Minimal Projects List
Attachment number 2 \nPage 1 of 1
Item # B
Project Complete Ongoing
Long
Term Notes Total Project
Costs
Amount
Issued3 "Balance"
Funds
Required to
CompleteSE 1/Maple √√√√Completed 6,000,000$ 5,180,000$ 820,000$ -$
DB Wood/Williams √√√√Completed 1,650,000$ 1,370,000$ 280,000$ -$
FM 1460 √√√√Under Construction Spring 2015 16,900,000$ 7,300,000$ 9,600,000$ 4,400,000$ 4
SH 29 Bypass Routing
Study √√√√Ongoing 2,500,000$ 1,250,000$ 1,250,000$ -$
FM 971 √√√√
Partial - Intersection
improvements in 2012 and 2014-
2016
13,200,000$ 500,000$ 12,700,000$ 4,000,000$
Berry Creek Drive √√√√3,900,000$ -$ 3,900,000$ 3,900,000$
Total2: 44,150,000$ 15,600,000$ 28,550,000$ 12,300,000$
Anticipated Issuance Costs: 1,850,000$
Total Issued: 46,000,000$
2008 Bond "Surplus": 18,100,000$
Remaining: 33,955,000$
Notes:
1 Total includes issuance costs.
2 Total does not include issuance costs.
3 Funds remaing after project has been completed have been rolled into the FM 1460 project.
4 To yet be determined.
2008 Road Bond Summary
January 21, 2015
2008 Road Bonds Authorized1: 46,000,000$
Total Issued: 12,045,000$
PDFConvert.14612.1.Copy_of_2008_Road_Bond_Summary_2014-12-17
Attachment number 3 \nPage 1 of 1
Item # B
City of Georgetown, Texas
City Council Agenda
January 27, 2015
SUBJECT:
Update and Discussion regarding MRAP -- Wayne Nero, Chief of Police
ITEM SUMMARY:
Update and discussion regarding MRAP.
FINANCIAL IMPACT:
N/A
SUBMITTED BY:
Wayne Nero, Chief of Police
Cover Memo
Item # C
City of Georgetown, Texas
City Council Agenda
January 27, 2015
SUBJECT:
Update on Public Safety Operations and Training Center -- Codi Newsom, Senior Project Manager and
Wayne Nero, Chief of Police
ITEM SUMMARY:
General update on Public Safety Operations and Training Center.
FINANCIAL IMPACT:
N/A
SUBMITTED BY:
Wayne Nero, Chief of Police
Cover Memo
Item # D
City of Georgetown, Texas
City Council Agenda
January 27, 2015
SUBJECT:
Sec. 551.071: Consultation with Attorney
- Advice from attorney about pending or contemplated litigation and other matters on which the attorney has
a duty to advise the City Council, including agenda items
- Public Safety Complex
- Summit at The Rivery Project
- Hughes Eminent Domain Suit
Sec. 551.074: Personnel Matters
- Interim City Manager, City Attorney, City Secretary and Municipal Judge: Consideration of the
appointment, employment, evaluation, reassignment, duties, discipline, or dismissal of a public officer or
employee as allowed under Tex. Gov. Code
Sec. 551.087: Deliberation Regarding Economic Development Negotiations
- Albertson's Building
ITEM SUMMARY:
FINANCIAL IMPACT:
N/A
SUBMITTED BY:
Cover Memo
Item # E