HomeMy WebLinkAboutAgenda CC 02.11.2020 WorkshopN otice of M eeting of the
Governing B ody of the
C ity of Georgetown, Texas
F ebruary 11 , 20 20
The Georgetown City Council will meet on February 11, 2020 at 2:00 P M at City Council Chambers,
510 W 9th Street Georgetown, TX 78626
The City of Georgetown is committed to compliance with the Americans with Disabilities Act (AD A).
If you require assistance in participating at a public meeting due to a disability, as defined under the
AD A, reasonable assistance, adaptations, or accommodations will be provided upon request. P lease
contact the City Secretary's Office, at least three (3) days prior to the scheduled meeting date, at (512)
930-3652 or City Hall at 808 Martin Luther King J r. Street, Georgetown, TX 78626 for additional
information; TTY users route through Relay Texas at 711.
R E V I S E D A G E N D A
Policy De ve lopme nt/Re vie w Workshop -
A P resentation and discussion regarding the City’s Debt P rogram -- Leigh Wallace, Finance
Director and P aul Diaz, Budget Manager
B P resentation, update, and discussion regarding the Transportation Capital Improvement P lan
(C IP ) and Road Bond P rograms -- Wesley Wright, P E, Systems Engineering Director and Ray
Miller, P ublic Works Director
C P resentation and discussion regarding the P arks, Recreation and Open Space Master P lan Update
-- Kimberly Garrett, P arks and Recreation Director
D P resentation and discussion regarding the P arks and Recreation Cost Recovery P olicy
Development -- Kimberly Garrett, P arks and Recreation Director
E P resentation and review re garding the do wntown parking garage project and discussion of options
for further review of additional sites -- David Morgan, City Manager
Exe cutive Se ssion
In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon's Texas Codes,
Annotated, the items listed below will be discussed in closed session and are subject to action in the
regular session.
F Sec. 551.071: Consul tati on w i th Attorney
Advice from attorney about pending or contemplated litigation and other matters on which the
attorney has a duty to advise the City Council, including agenda items
- Litigation Update
- P E C Franchise
- Election Code Opinion
Sec. 551.086: Certai n P ubl i c P ow er Uti l i ti es: Competi ti ve M atters
- Mercuria IS D A Amendment
- Third Amendment to the Bluejay Next Interconnection Agreement
Sec. 551.087: Del i berati on Regardi ng Economi c Devel opment Negoti ati ons
Page 1 of 103
- P roject Tortilla
Sec. 551.076: Del i berati ons Regardi ng Securi ty Devi ses or Securi ty Audi ts: Cl ose
Meeti ng
- Update on Cyber Security and Continuity P lan -- J ames Davis, IT Operations Manager
Sec. 551:074: P ersonnel Matters
City Manager, City Attorney, City Secretary and Municipal J udge: Consideration of the
appointment, employment, evaluation, reassignment, duties, discipline, or dismissal
- Municipal Court J udge
Adjournme nt
Ce rtificate of Posting
I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that
this Notice of Meeting was pos ted at C ity Hall, 808 Martin Luther King Jr. S treet,
G eorgetown, T X 78626, a plac e readily ac cessible to the general public as required by law, on
the _____ day of _________________, 2020, at __________, and remained so pos ted for
at leas t 72 c ontinuous hours prec eding the s cheduled time of said meeting.
__________________________________
R obyn Dens more, C ity S ec retary
Page 2 of 103
City of Georgetown, Texas
City Council Workshop
February 11, 2020
S UBJEC T:
P resentation and discussion regarding the City’s Debt P rogram -- Leigh Wallace, Finance Director and P aul Diaz,
Budget Manager
I T EM S UMMARY:
This annual overview of current and proposed debt obligations is a requirement of the City’s Fiscal and Budgetary P olicy.
The purpose is to review the debt management program, outstanding debt, and a preview of the 2020 debt sale. The review
includes Revenue bonds, General Obligation bonds, Certificate of Obligation bonds, and Self-Supporting obligations.
The P roposed Debt Issue discussed in the presentation will be finalized during an action item on the February 25th
Council meeting agenda.
F I NANC I AL I MPAC T:
N/A
S UBMI T T ED BY:
Leigh Wallace, Finance Director and P aul Diaz, Budget Manager
AT TAC HMENT S :
Description
Debt Amounts as of 2.4.20
P resentation
Page 3 of 103
FY2020 (Multiple Items)
Row Labels Sum of FY2020
2008 GO
Regional Trail Development 1,275,000.00
San Gabriel Park 600,000.00
2008 GO Total 1,875,000.00
2015 GO
2015 Road Bond Priority 1 - Downtown Sidewalks 1,000,000.00
Intersection Improvements 1,400,000.00
Leander Road (Norwood to South West Bypass)3,200,000.00
Northwest Blvd Bridge 750,000.00
Southwestern Blvd.2,650,000.00
2015 GO Total 9,000,000.00
CO
ADA Transition Plan 150,000.00
Body Cameras 800,000.00
Cardiac Monitors 225,000.00
Construct Airport Maintenance / Equipment Storage Facility 750,000.00
Curb and Gutter 650,000.00
Fuel Station 550,000.00
GMC Remodel 250,000.00
Neighborhood Park Development 250,000.00
Parks Master Plan 200,000.00
Public Safety Vehicles - Fire 2,200,000.00
Public Safety Vehicles - Police 740,200.00
Public Safety Vehicles - Police New 246,000.00
Radio Replacement 129,000.00
SCBA Replacement 290,000.00
SE Inner Loop 4,700,000.00
Tennis Center Pool Demolition 70,000.00
Westinghouse & Scenic Lake Traffic Signal 600,000.00
CO Total 12,800,200.00
REV
Carriage Oaks Transmission 500,000.00
Consultant Engineer 150,000.00
CR262 Waterline 500,000.00
Feeders 160,000.00
Fiber Optic 50,000.00
Hoover Pump Station 750,000.00
LWTP Raw Water Intake Rehabilitation 8,000,000.00
Miscellaneous Line Upgrades 250,000.00
New Development 3,500,000.00
Power Quality Imp 50,000.00
Round Rock Supply Line 300,000.00
Round Rock Supply Pump Station and Ground Storage Tank 1,000,000.00
Sectionalization Imp 100,000.00
South West Bypass Water (H24-1)1,800,000.00
Southside Water Treatment Plant Rehab 2,250,000.00
Stonewall Ranch PS Improvements 2,500,000.00
Tank Rehabilitation 750,000.00
REV Total 22,610,000.00
Grand Total 46,285,200.00
Page 4 of 103
FY2020 Annual Budget
Annual Debt Overview
Fiscal Year
2020 Budget
And Five-Year Capital Improvement Plan
Page 5 of 103
FY2020 Annual Budget
Debt Planning
•Budget development includes the capital plan
and the debt plan
•2020 Budget included proposed debt with
estimated tax impacts (for the following year)
–Refine the 2020 debt plan as project timing and
costs are updated
Page 6 of 103
FY2020 Annual Budget
Debt Policies
•Provide debt update annually
•Balance needs of the City between pay as you go
and debt financing
–Stability of tax rate
•Explore all funding options for a capital item
•Finance a capital item over its useful life
–Intergenerational equity
•Method of sale –competitive, unless market
conditions are favorable to select negotiated
Page 7 of 103
FY2020 Annual Budget
Types of Debt
General Obligation Bonds
-Used for large projects, such as Southwestern
Blvd, the Southwest Bypass, the Northwest Blvd
Bridge, & San Gabriel Park
-Approved by the voters
-Repaid with property taxes over long terms
Page 8 of 103
FY2020 Annual Budget
Types of Debt
Certificates of Obligation -Tax Backed
–Used for required or routine items, such as Fire
Stations, Public Safety Vehicles, and other City
facilities
–Public notice required
–Repaid with property taxes
–Term over the life of the asset
Page 9 of 103
FY2020 Annual Budget
Types of Debt
Certificates of Obligation -Self Supporting
–Used for various projects, such as but not limited to:
Stormwater, GTEC, GEDCO, and TIRZ
–Public notice required
–Repaid with revenue other than general property tax
–Sales tax
–Drainage fees
–TIRZ property taxes
–Term over the life of the asset
Page 10 of 103
FY2020 Annual Budget
Types of Debt
Revenue Bonds
–Used for large electric and water projects
–Repaid with utility revenue over life of asset
Page 11 of 103
FY2020 Annual Budget
Types of Debt
Refunding Bonds
–This is an option when the call date is reached
on any bond type
–The call date is typically 10 years after a 20
year bond is sold
–Options are reviewed with Bond Advisor to
see if it’s in the best interest of the City
–This option is selected to refinance with a
lower interest rate and receive a savings on
the debt balance
Page 12 of 103
FY2020 Annual Budget
Current Bond Ratings
•Independent review of City’s management and
financial condition to determine
creditworthiness
•Impacts the interest rate of the bond
•Standard & Poor’s 2019 Rating
–General obligation AA+
–Revenue bonds AA-
Page 13 of 103
FY2020 Annual Budget
Debt Coverage Ratio
•For revenue bonds
•Combined water and electric
•Number of times net operating revenue can
cover debt service
–Bond covenants 1.35x
–Fiscal and Budgetary Policy 1.5x
–FY20 budgeted coverage is 2.93x
Page 14 of 103
FY2020 Annual Budget
Current Tax Rate
•Total 42 cents per $100 assessed valuation
–Interest & Sinking 22.453 cents
–Operations & Maintenance 19.547 cents
•Agreement with the voters
–2015 Transportation Bond
•No increase more than 10 cents total
•No increase more than 2 cents in one year
•City has retained the same tax rate for 3 years
--FY20/0.42 --FY19/0.42 --FY18/0.42
Page 15 of 103
FY2020 Annual Budget
Current Tax Obligation
Not Including Self Funded Obligations
Other City
Facilities
21%
Parks/Rec &
Facilities
13%
Public Safety
30%
Streets and
Transportation
36%
General Government
Tax Supported Debt $169M
Other City Facilities Parks/Rec & Facilities Public Safety Streets and TransportationPage 16 of 103
FY2020 Annual Budget
5 Year Tax Supported Debt
Not Including Self Funded Obligations
0
20,000,000
40,000,000
60,000,000
80,000,000
100,000,000
120,000,000
140,000,000
160,000,000
180,000,000
2014-2015 2015-2016 2016-2017 2017-2018 2018-2019
CO's GO's
Dol
l
a
r
s
Page 17 of 103
FY2020 Annual Budget
Debt per Capita
$1,859
$2,124
$2,187
$2,501
$2,508
$0 $500 $1,000 $1,500 $2,000 $2,500 $3,000
2014/15
2015/16
2016/17
2017/18
2018/19
Total Tax Supported Debt per Capita
Page 18 of 103
FY2020 Annual Budget
Enterprise Obligations
Electric
32%
Irrigation
1%
Stormwater
Drainage
4%
Water
30%Airport
2%
Wastewater
31%
Enterprise Debt $99.6M
Electric Irrigation Stormwater Drainage Water Airport Wastewater
Page 19 of 103
FY2020 Annual Budget
5 Year Enterprise Debt,
Including Self Supported Debt
0
20,000,000
40,000,000
60,000,000
80,000,000
100,000,000
120,000,000
2014-2015 2015-2016 2016-2017 2017-2018 2018-2019
Water/WW/Irrigation Electric Stormwater/Airport
Page 20 of 103
FY2020 Annual Budget
Debt Per Customer
$843 $883
$1,051
$960
855
$1,233
$1,166
$1,320
$1,414
$1,158
$0
$200
$400
$600
$800
$1,000
$1,200
$1,400
$1,600
2014/15 2015/16 2016/17 2017/18 2018/19
Outstanding Debt per Utility Customer
W/WW Debt Per Customer Electric Debt Per Customer
Page 21 of 103
FY2020 Annual Budget
Historical Assets Net of Debt
$- $100 $200 $300 $400 $500 $600 $700
2014
2015
2016
2017
2018
Millions
City Assets Net of Related Debt
General Utility
Page 22 of 103
FY2020 Annual Budget
Tax Impact Analysis
•Updated each year, the Five Year Debt Model is
a tool to better understand the impacts of
issuing debt.
•Allows for scenario testing and the adjustment
of multiple variables including assessed value,
sales tax, tax rate distribution, and debt service
requirements.
•Reviewed with Council each summer.
Page 23 of 103
FY2020 Annual Budget
How the Model Works
Projected Tax Increase
Page 24 of 103
FY2020 Annual Budget
Assumptions
•Small changes can have big results
•Use Current I&S Tax Rate: 22.453 cents
•Use Current O&M Tax Rate: 19.547 cents
•Use Current Ratio of 53/47 for tax ceiling
revenue.
•Base growth of 4.5% in FY2021, decreasing to
3.25% by 2024. Tax ceiling revenue growing at
a constant 3.5%.
Page 25 of 103
FY2019 Annual Budget
5 Year Tax Backed CIP
5 Year CIP Schedule FY2020 FY2021 FY2022 FY2023 FY2024 Beyond 5 Years
CO
General Capital Projects
Facilities 800,000 0 0 0 0 49,825,000
Fleet 3,315,200 4,108,278 3,564,000 2,341,500 1,974,400 13,215,000
GTEC 4,700,000
Parks 670,000 400,000 400,000 250,000 4,250,000 38,900,000
Public Safety 1,315,000 515,000 300,000 0 0 0
Streets 1,600,000 0 0 7,000,000 0 0
General Capital Projects Total 12,400,200 5,023,278 4,264,000 9,591,500 6,224,400 101,940,000
CO Total 12,400,200 5,023,278 4,264,000 9,591,500 6,224,400 101,940,000
2008 GO
General Capital Projects
Parks 1,875,000 3,000,000 2,250,000 1,500,000 250,000 11,700,000
Streets 0 0 0 0 0 5,550,000
General Capital Projects Total 1,875,000 3,000,000 2,250,000 1,500,000 250,000 17,250,000
2008 GO Total 1,875,000 3,000,000 2,250,000 1,500,000 250,000 17,250,000
2015 GO
General Capital Projects
Streets 9,000,000 9,700,000 12,000,000 5,400,000 2,000,000 20,750,000
General Capital Projects Total 9,000,000 9,700,000 12,000,000 5,400,000 2,000,000 20,750,000
2015 GO Total 9,000,000 9,700,000 12,000,000 5,400,000 2,000,000 20,750,000
Grand Total 23,275,200 17,723,278 18,514,000 16,491,500 8,474,400 139,940,000
Page 26 of 103
FY2020 Annual Budget
Forecast
•No tax impact in the five year model based on
assumptions mentioned.
–Strong and consistent growth in our
community.
–Council’s action during the budget process
in recent summers to limit capital project
spending is helping ($18-$20 million
capacity per year for the next 5 years).
Page 27 of 103
FY2020 Annual Budget
Bond Authorization Remaining
General Obligation Debt Authorized by the Voters 2008 Roads 2008 Parks 2015 Roads Total
Amount Authorized by the Voters 46,000,000 35,500,000 105,000,000 186,500,000
Year & Issue
2009 1,175,000 1,175,000
2010 1,365,000 1,365,000
2010A 9,435,000 2,500,000 11,935,000
2012 0
2012A 0
2013 5,000,000 5,000,000
2014 4,800,000 4,800,000
2015 4,375,000 4,375,000
2015A 1,710,000 10,075,000 11,785,000
2016 3,000,000 10,000,000 13,000,000
2017 6,500,000 2,635,000 9,135,000
2018 3,900,000 4,000,000 16,550,000 24,450,000
2019 5,330,000 5,330,000
Total Issued 25,050,000 22,710,000 44,590,000 92,350,000
Authorization Remaining 20,950,000 12,790,000 60,410,000 94,150,000
*Includes allocated premium which counts towards the voter authorization.
Page 28 of 103
FY2020 Annual Budget
FY 2020 Proposed Debt
Tax Supported -General Obligation
2020 Debt Issue FY2020
2008 GO
Tax Supported
Regional Trail Development 1,275,000.00
San Gabriel Park 600,000.00
Tax Supported Total 1,875,000.00
2008 GO Total 1,875,000.00
2015 GO
Tax Supported
2015 Road Bond Priority 1 -Downtown Sidewalks 1,000,000.00
Intersection Improvements 1,400,000.00
Leander Road (Norwood to South West Bypass)3,200,000.00
Northwest Blvd Bridge 750,000.00
Southwestern Blvd.2,650,000.00
Tax Supported Total 9,000,000.00
2015 GO Total 9,000,000.00
Grand Total 10,875,000.00
Page 29 of 103
FY2020 Annual Budget
FY 2020 Proposed Debt
Tax Supported -Certificate of Obligation
2020 Debt Issue FY2020
CO
Tax Supported
ADA Transition Plan 150,000.00
Body Cameras 800,000.00
Cardiac Monitors 225,000.00
Fuel Station 550,000.00
GMC Remodel 250,000.00
Neighborhood Park Development 250,000.00
Parks Master Plan 200,000.00
Public Safety Vehicles -Fire 2,200,000.00
Public Safety Vehicles -Police 740,200.00
Public Safety Vehicles -Police New 246,000.00
Radio Replacement 129,000.00
SCBA Replacement 290,000.00
Tennis Center Pool Demolition 70,000.00
Westinghouse & Scenic Lake Traffic Signal 600,000.00
Tax Supported Total 6,700,200.00
CO Total 6,700,200.00
Grand Total 6,700,200.00
Page 30 of 103
FY2020 Annual Budget
FY 2020 Proposed Debt
Self Supported -Certificate of Obligation
2020 Debt Issue FY2020
CO
Self Supported
Construct Airport Maintenance / Equipment Storage Facility 750,000.00
Curb and Gutter 650,000.00
SE Inner Loop-GTEC 4,700,000.00
Self Supported Total 6,100,000.00
CO Total 6,100,000.00
Grand Total 6,100,000.00
Page 31 of 103
FY2020 Annual Budget
Supporting the Debt
•The current Stormwater and Airport rates can
support the issuing of more debt in these
funds.
•Due to continued strong sales tax collections,
the GTEC debt can be supported.
Page 32 of 103
FY2020 Annual Budget
FY 2020 Proposed Debt
Electric/Water –Revenue Bonds
2020 Debt Issue FY2020
REV
Electric
Consultant Engineer 150,000.00
Feeders 160,000.00
Fiber Optic 50,000.00
New Development 3,500,000.00
Power Quality Imp 50,000.00
Sectionalization Imp 100,000.00
Electric Total 4,010,000.00
Water
Carriage Oaks Transmission 500,000.00
CR262 Waterline 500,000.00
Hoover Pump Station 750,000.00
LWTP Raw Water Intake Rehabilitation 8,000,000.00
Miscellaneous Line Upgrades 250,000.00
Round Rock Supply Line 300,000.00
Round Rock Supply Pump Station and Ground Storage Tank 1,000,000.00
South West Bypass Water (H24-1)1,800,000.00
Southside Water Treatment Plant Rehab 2,250,000.00
Stonewall Ranch PS Improvements 2,500,000.00
Tank Rehabilitation 750,000.00
Water Total 18,600,000.00
REV Total 22,610,000.00
Grand Total 22,610,000.00
Page 33 of 103
FY2020 Annual Budget
Supporting the Debt
•Current rates for Water and Electric can
support the issuing of new debt.
•Staff will be reviewing water rates in the spring
as part of Water Infrastructure Planning and
development of the FY2021 Budget and Five
Year CIP.
Page 34 of 103
FY2020 Annual Budget
FY 2020 Refunding Option
•2010 Utility revenue bonds are callable; $6.5M
principal remaining
•Estimated interest rate change from 4% to
1.6%
•Estimated savings $717,000 over 10 years
–Depends on actual sale in April
Page 35 of 103
FY2020 Annual Budget
Takeaways
•The City continues to aggressively implement
infrastructure improvements to match the voter
approved projects.
•The debt correlates to population growth and voter
approved projects to improve services and quality of
life.
•The City continues to experience strong economic
growth.
•Economic forecast shows the City can fund the current
CIP plan within the current tax and utility rates.
•Water infrastructure decisions coming to Council this
spring/summer with future rate impacts.
Page 36 of 103
FY2020 Annual Budget
Next Steps
•February 25 Council Agenda
–Authorize Financial Advisors to proceed with bond sale schedule
and documents
–Approve Notice of Intent to issue Certificates of Obligation
•March
–Offering Statements reviewed by staff
–Staff meet with bond rating agency
•April 28 Council Agenda
–Approve results of competitive sale
•May 21–Closing and receive proceeds
Page 37 of 103
City of Georgetown, Texas
City Council Workshop
February 11, 2020
S UBJEC T:
P resentation, update, and discussion regarding the Transportation Capital Improvement P lan (CIP ) and Road Bond
P rograms -- Wesley Wright, P E, Systems Engineering Director and Ray Miller, P ublic Works Director
I T EM S UMMARY:
Attached is a pre sentatio n updating Co unc il o n the current Transportatio n C IP projects as well as both the 2008 and 2015
Road Bond P rograms.
Staff is seeking direction from Council on a possible future road bond election.
F I NANC I AL I MPAC T:
Various project financials are included in the attached presentation and spreadsheet.
S UBMI T T ED BY:
Wesley Wright
AT TAC HMENT S :
Description
C I P & R oad Bond P res entation
2015 R oad Bond Map
2015 R oad Bond S ummary S heet
Page 38 of 103
Road Bond Update
Road Bond & Transportation CIP Update
City Council WorkshopFebruary 11, 2020
Ray Miller, Public Works DirectorWesley Wright, PE, Engineering Director
Page 39 of 103
Road Bond UpdatePurpose
•Status of the 2008 &2015 Road Bond Programs
•Review of Williamson County 2019 Road Bond
Program
•CAMPO Supported Projects
•TxDOT Supported Projects
•Seek the Council’s input and direction –Future Road
Bond Initiative?
Page 40 of 103
Road Bond Update2008 Road Bond
Financials
•$46MM total package
•$25MM debt issued ($8MM cash available)
•$21MM authorized, but not issued
Completed Projects
•SE1/Maple/Sam Houston
•DB Wood/Williams Intersection
•SH29 Bypass Routing Study
Anticipated/Remaining Expenditures
•FM 1460 –Completed (Est. $1MM final true-up)
•FM 971 –TxDOT letting mid 2020 (Est. $4MM)(Austin Ave to Gann St.)
•Berry Creek Drive (Airport –195) –TBD (Est. $4MM)
Page 41 of 103
Road Bond Update2015 Road Bond
Financials
•$105MM total package
•$54MM debt issued (or soon to be issued thru Spring 2020)
•$51MM authorized, but not issued (future)
Completed Projects –$30.4MM
•Southwest Bypass/Wolf Ranch Parkway (SH29/FM2243) ($20.1MM)
•Various Priority 1 Sidewalks ($4MM)
•Rivery Blvd ($5.6MM)
•Bond Funds From Completed Projects ($0.7MM)
Under construction -$12.8MM
•Northwest Blvd –Est. Completion Early 2021 ($11.3MM)
•Various Priority 1 Sidewalks ($1.5MM)
Page 42 of 103
Road Bond Update2015 Road Bond
Remaining Projects
•Under Design -$12.7MM
–Southwest Bypass (Wolf Ranch Parkway –SH29 connection) ($0.7MM design)
–Williams & Lakeway Intersection ($1.4MM)
–Leander Road (River Ridge to SW Bypass) ($5.2MM 2015 Road Bond)
•Design & ROW April 2019, Construction 2021 (Add’l $4.5MM CAMPO Funds)
–Southwestern Blvd (Raintree to Inner Loop) ($4.2MM 2015 Road Bond)
•Design March 2019, Construction early 2020
–Inner Loop (Austin to 1460) ($1.2MM 2015 Road Bond)
•Design February 2019, Construction early 2020 (GTEC Funded -$7.2MM)
•Future Design & Const. -$23.1MM
–DB Wood (SH29-Oak Ridge) ($18.4MM) (FY21-22)
–Remainder Priority 1 Sidewalks (Downtown & SH29) ($4.7MM) (FY21-23)
Page 43 of 103
Road Bond Update2015 Road Bond
Remaining Projects (cont’d)
•Future Design ONLY -$14.4MM
–Stadium Dr. & NE Inner Loop ($2.1MM)
–SH29 (Haven Lane to SH130) ($4.1MM)
–Remainder Intersection Improvements ($3.7MM)
–Remainder Future Projects ($4.5MM)
•Williams, Shell, Inner Loop, DB Wood, IH35 SB Frontage
•TxDOT Projects -$11.6MM
–TxDOT Funded Going Forward
–IH35 NB Frontage Road ($7MM)
–Leander Road Bridge Design ($4.6MM)
Page 44 of 103
Road Bond Update2015 Road Bond
Summary
$30.4MM –Completed (prior years)
$12.8MM -Under Construction (current)
$12.7MM -Under Design (current)
$23.1MM -Future Design & Const. (FY21-22)
$14.4MM -Future Design ONLY (TBD)
$11.6MM -TxDOT Projects (not planned)
$105MM –Total 2015 Road Bond Program
**By 2022 the City of will have substantially completed
projects listed in the 2008 &2015 Road BondsPage 45 of 103
Road Bond Update2015 Road Bond
2020 2021 2022
NW Blvd
SE Inner Loop
Southwestern
Sidewalks Sidewalks Sidewalks
Intersections Intersections Intersections
DB Wood DB Wood
Page 46 of 103
Road Bond UpdateWilco 2019 Road Bond
In preparing for the Wilco 2019 Road Bond call for
projects,the City of Georgetown selected and submitted
the following projects with a proposed local match:
•Southwest By-Pass Extension:From current terminus to SH-29.
Estimated Construction Cost is $5.5 million with a local match
of $2.0 million
•SE Inner Loop /Sam Houston Extension:From current
terminus of Sam Houston at Patriots Way,northeast to SH-29.
Estimated Construction Cost is $22.5 million with a local match
of $4.0 million
•Westinghouse Road :From FM 1460 to SH-130.Estimated
Construction Cost is $20.2 million with a local match of $8.2
million.Page 47 of 103
Road Bond UpdateCAMPO Supported Projects
Lakeway & Williams
•Project will add additional turn lanes on both
•Estimated Construction cost is $800,000 (Federal =$500,000)
Leander Road Expansion
•From Norwood Drive to Southwest By-Pass
•Construct a 4-lane divided roadway
•Improved sidewalks along the north side of the roadway
•Construction is estimated to begin in Late 2022
•Estimated construction cost is $8.8 million (Federal = $3,600,000)Federal $$ = 3,600,000
Page 48 of 103
Road Bond UpdateCAMPO Supported Projects
Austin Avenue Bridges
•Project will Rehab the Austin Avenue Bridge over the San Gabriel River
between Morrow and 2nd Street.
•Improve the support structures of the bridges decks;maintain concrete
under the bridge and columns;remove the sidewalks;resurface the decks;
added wider travel lanes.
•Estimated Construction cost is $8.7 million (based on the original estimate
and AFA .(Federal =$1.3 million)
SH-29 & DB Woods
•Project will add additional turn lanes on both SH-29 and DB Woods
•Install a raised concrete median along SH-29 with a few “hooded”left hand
turns
•Install new drainage structures at the intersection
•Estimated Construction cost is $5.7 million
Page 49 of 103
Road Bond UpdateCAMPO Supported Projects
2045 Regional Transportation Plan (DRAFT)
•A Recent call for Projects to be included in the new Regional Transportation
Plan that will have a Horizon Year of 2045.
•Over $45 Billion in potential Projects were submitted
•CAMPO currently estimates that $38 Billion would be available for funding
•If a future project is to be eligible for Federal or State Funding through
CAMPO them that project must be listed within the long-range Regional
Transportation Plan.
The following projects were submitted:
•Williams Drive from Austin Avenue to Jim Hogg
•NE Inner Loop from IH-35 to SH-29
•SE Inner Loop from SH-29 to IH-35
•Westinghouse Road from FM 1460 to SH-130
•Shell Road from SH-195 to Williams
•DB Woods from Williams to Cedar Breaks
•FM 971 from Gann Street to City of Georgetown Water Treatment FacilityPage 50 of 103
Road Bond UpdateTxDOT Supported Projects
IH-35 & Williams Drive
•A Reconstruct the Williams Drive interchange to a diverging diamond
intersection (DDI)
•Construct north and southbound intersection bypass lanes under Williams
Drive bridge
•Extend the northbound I-35 frontage road from Williams Drive to the
Lakeway Drive exit ramp
•Construction is estimated to begin late 2020 –early 2021 and anticipated
completion would be late 2023.
IH-35 &Leander Road (RM 2243)
•Replace the existing bridge at RM 2243 with a taller,wider bridge that
includes 3 additional turn-lanes
•Improve existing southbound frontage road to SE Inner Loop
•Add braided entrance and exit ramps along the southbound frontage road
to SE Inner Loop.
•Construction is estimated to begin late fall of 2023 with anticipated
completion the fall of 2025Page 51 of 103
Road Bond UpdateTxDOT Supported Projects
IH-35 & Westinghouse
•Remove existing bridge and construct new bridge
•Construct a Continuous Flow Intersection (CFI)
•Improve existing southbound frontage road from Inner Loop to RM 1431
•Reverse entrance and exit ramps between SE Inner Loop and RM 1431
•Construction is estimated to begin spring 2023 and anticipated completion
would be winter of 2025
IH-35 &SH-29
•Reconstruct Bridge to improve turning movements and increase mobility
through the intersection.
•Intersection BY -PASS Lanes
•Construction is estimated to begin late 2023 dependent on Funding
Page 52 of 103
Road Bond Update
Looking Forward –FY21
•DB Wood Road
•Design & ROW (FY21) -$4MM
•Construction (FY22) -$14MM
•Priority 1 Sidewalks
•Downtown -$1MM
•Intersection Improvements
•Location and Dollars –TBD
•Aviation Drive
•GTEC –Economic Development
•Airport Road to IH35 SB Frontage Road
Page 53 of 103
Road Bond Update
Intersection Improvements
Criteria for Selection
•Traffic Counts on all approach legs of an intersection
•Number of Traffic Accidents at the intersection
•Peak Hour Volumes
•Turning Movement Counts
•Pedestrian Traffic
•Proposed new growth in close proximity to the intersection
•Etc…
Intersections under review (to name just a few)
•SE Inner loop and Rockride
•Sam Houston and Rockride
•Stadium Drive and NE Inner Loop
•Williams and Estrella Crossing
•Shell Road and Verde Vista
•Austin Avenue and San Gabriel Village Blvd
Page 54 of 103
Road Bond Update
Looking Forward
Future Bond Elections?
Nov 2020?
Future Projects?
•Memorial Drive
•Rock Ride
•Shell Road
•Inner Loop
•Williams Drive
•Others…
Impact Fees –Committee Consideration Feb. 25th
Financial Rules of Thumb
•$1.5MM per lane-mile new construction
•1 cent property tax = ~$9MM CapitalPage 55 of 103
Road Bond Update
Summary
•The City of Georgetown has substantially completed
the projects listed in the 2008 and is close with 2015
Road Bond Programs.
•The City of Georgetown continues to partner with
other agencies such as Williamson County,CAMPO
and TxDOT on various transportation related projects.
•The City will create a listing of important intersections
and will develop criteria for ranking these intersections
for needed improvements.
•Council Direction –Road Bond Committee?
•November 2020 Election?
Page 56 of 103
Road Bond Update
Comments / Questions?
Page 57 of 103
Georgetown City Council &Bond Committee Project List
I
I
§¨¦35
§¨¦35
¬«29
¬«195
¬«29
RM 2243
FM 971
FM 1460
AZ-2
W
ILLIA
M
S D
R
INNER LOOP
U N I V E R S I T Y A V E
D
B
W
O
O
D
R
D
AIRPORT RD
S
U
N
C
IT
Y B
L
V
D
S H E L L R D
D E L W E B B B L V D
N
A
W
G
R
I
M
E
S
B
L
V
D
BU
HH
AT
TT
AN
BG
BC
AZ-1
AF
AJ
BP
AO
CQ
BJ-2
AC
CS
AD AE
F Legend
Build
Design
Planning
I Seperator
Georgetown
0 1 20.5 MilesPath: G:\0573.009.000\07.00 CADD\GIS\Overall_Exhibit-11x17_noBound.mxd
* Currently anticipated project list. Projects may vary based on future economic market and other conditions.* Currently anticipated project list. Projects may vary based on future
OTP
Project
Identifier
Roadway Project *
AE Northwest Blvd Bridge - Fontana Dr To Austin Ave
AD Rivery Blvd Extension - Williams Dr To Northwest Blvd
AF IH 35 NB Frontage Road - Williams Dr To Lakeway Bridge
AZ1 Southwest Bypass - Wolf Ranch Pkwy To Leander Rd
BC Wolf Ranch Pkwy - DB Wood Dr To Southwest Bypass
-Intersection/Capital Pool
CS Leander Rd Bridge @ IH 35
-Sidewalk, Safety and ADA Accessibility Pool
AJ NE Inner Loop - Stadium Dr To FM 971
CQ Stadium Dr (CR 151) - Austin Ave To NE Inner Loop
BP Southwestern Blvd - Raintree Dr To SE Inner Loop
AT SH 29 (Haven Lane to SH130)
BJ2 Leander Rd (RM 2243) - 400ft W of SWBypass to River Ridge Dr
AN DB Wood Dr - SH 29 To Oak Ridge Dr
AZ2 Southwest Bypass- Wolf Ranch Pkwy To SH29
Preliminary Engineering to begin developing Projects from
original Bond List to shovel ready: AC, AO, BU, BG, HH, TT
AC Williams Dr - Rivery Blvd. to Frontage Rd
AO IH 35 SB Frontage Rd - Williams Dr To Rivery Blvd
BU SE Inner Loop - IH 35 To Southwestern Blvd
BG SE Inner Loop - Southwestern Blvd To SH 29
HH Shell Rd - Williams Dr to Shell Spur Rd
TT DB Wood Dr - Oak Ridge Dr To Lake Overlook Dr.
Page 58 of 103
Project Name
Dollars Budgeted
as of FY20
2015 Road Bond
Funds Remaining Project Status
Northwest Blvd Bridge
Fontana Dr To Austin Ave 11,250,000$ 1,147,500$ Under Construction - Anticipated Completion Q1 2021
Rivery Blvd Extension
Williams Dr To Northwest Blvd 5,611,358$ 1,034,018$ COMPLETED
Southwest Bypass/Wolf Ranch Pkwy
SH29 To Leander Rd 18,322,090$ 463,160$
Completed - Open to Traffic
$20,075,000 issued debt
$2,265,410 ($1,752,910 + 512,500) available for connection to SH29
Southwest Bypass
Wolf Ranch Pkwy To SH29 706,992$ (194,492)$
Coordinating design scope with County as part of their Road Bond - Aquirrie
Fields Task Order $706,991.75
Southwestern Blvd
Raintree Dr To SE Inner Loop 4,200,000$ -$ Under Design, Anticipate Bidding Late 2020
Leander Rd (RM 2243)
SWBypass to River Ridge Dr 5,200,000$ 31,250$ Under Design - need ROW and TxDOT Environmental (2 years)
Intersection/Capital Pool 1,400,000$ 3,725,000$ Williams/Lakeway FY20 ($1,400,000) under design
Sidewalk, Safety and ADA Accessibility
Pool 6,000,000$ 4,250,000$ Approximately 50% of Priority 1 sidewalks are designed or completed
NE Inner Loop
Stadium Dr To FM 971 -$ 1,025,000$ Future Year - Design Funding Only
Stadium Dr (CR 151)
Austin Ave To NE Inner Loop -$ 1,025,000$ Future Year - Design Funding Only
SH 29
Haven Lane To SH130 -$ 4,100,000$ Future Year - Design & ROW Funding Only
DB Wood
SH 29 To Oak Ridge Dr -$ 18,360,000$ Future Year - Design and Construction (FY21 Budget?)
Leander Rd Bridge @ IH 35 -$ 4,612,500$ Design Anticipated to Start 2020 - TxDOT Funded
IH 35 NB Frontage Road
Williams Dr To Lakeway Bridge -$ 7,023,375$ Future TxDOT Funded Project - No city funding contribution expected
Preliminary Engineering to begin
developing Projects from original Bond List
to shovel ready 1,200,000$ 4,518,875$
SE Inner Loop (Southwestern-IH35) Under Design,Williams Dr (Rivery-Frontage
Rd), IH 35 SB Frontage Rd (Williams-Rivery), SE Inner Loop (SH29-
Southwestern), Shell Rd (Williams-Shell Spur), DB Wood (Oak Ridge-Lake
Overlook)
Totals 53,890,439$ 51,121,186$ $ 105,000,000
Page 59 of 103
City of Georgetown, Texas
City Council Workshop
February 11, 2020
S UBJEC T:
P resentation and discussion regarding the P arks, Recreation and Open Space Master P lan Update -- Kimberly Garrett,
P arks and Recreation Director
I T EM S UMMARY:
Funds were approved in the FY 20 20 budge t to update the P arks, Recreatio n and Ope n Space Maste r P lan. The current
master plan was adopted by City Council in 2009. Since that time, the City has seen tremendous growth. In addition, many
of the priorities in the master plan have been accomplished. The master plan process will assess our c urre nt parks and
recreation system and allow citizens to voice desires and concerns through a public engagement process of surveys,
public meetings and workshops. Based on the citizen input and a needs analysis, a set of priorities and recommendations
including cost estimates will be developed to help guide staff and elected officials over the next 10 years.
A Request for P roposals from interested firms will be issued in the next 30-45 days. The master plan process is proposed
to take 12 months with a summer 2021 adoption.
This workshop will provide a presentation regarding the update of the P arks, Recreation and Open Space Master P lan.
F I NANC I AL I MPAC T:
N A
S UBMI T T ED BY:
Kimberly Garrett, P arks and Recreation Director
AT TAC HMENT S :
Description
P resentation
Page 60 of 103
Parks, Recreation & Open
Space Master Plan Update
City Council Workshop
February 11, 2020
City of GeorgetownPage 61 of 103
Agenda
•Current Master Plan
•Goals of a Parks Master Plan
•Current Conditions
•Process
•Next Steps/Timeline
•Questions
Page 62 of 103
Current Master Plan
•Started summer
2007; adopted early
2009
•Basis for the 2008
Parks Bond Package
•10 year planning
horizon
•Many priorities
accomplished
Page 63 of 103
Priorities | Accomplishments
•Park Development
–San Gabriel Park
Renovations (Phases
1 & 2)
–Garey Park
–New Neighborhood
Parks Developed
City of GeorgetownPage 64 of 103
Priorities | Accomplishments
•Land Acquisition
–Acquired 90 acres for
a northwest
community park
–Purchased land on
the South SG River
near VFW Park
–Preservation of river
corridors for trails
City of GeorgetownPage 65 of 103
Priorities | Accomplishments
•Improvements to Existing Parks
–ADA and upgrades to current park design
standards
Old Town Park
Edwards Park
San Jose Park
Chautauqua Park
Geneva Park
Emerald Springs Park
City of GeorgetownPage 66 of 103
Priorities | Accomplishments
•Recreation Facilities
–Hike and Bike Trail Expansions
One mile trail extension along Scenic Dr.
½ mile trail extension from SG Park to Katy
Crossing
–Splash pads
San Jose & Rabbit Hill Park
Downtown Art Center
Lakeside Park
City of GeorgetownPage 67 of 103
Priorities | Accomplishments
Recreation Facilities
–Playgrounds
Creative Playscape
Neighborhood Parks
–Picnic Pavilions
–New Restrooms
–Art in the Park Program
Worked with Arts and Culture Board to place art in
San Gabriel Park and at the Recreation Center
City of GeorgetownPage 68 of 103
Goals of a Parks Master Plan
•Assessment of the current system
•Allows citizens to voice desires and
concerns
•Provide a set of recommended Parks and
Recreation priorities to guide staff and
elected officials
•Develops framework for future funding
options
Page 69 of 103
Current Conditions
•Funding in FY 2020 budget
•Tremendous growth since last master plan
–2008 population @47,500; now @74,000
–60% growth
•2030 Comp plan survey
–Maintain & add to existing quality Parks & Rec
•Current master plan needed | TPWD
grants
City of GeorgetownPage 70 of 103
Process
•Public Input/Community Engagement
–Surveys
–Public Meetings & Workshops
•Evaluate current level of service
•Conduct demand/needs analysis
•Develop priorities and recommendations
including cost estimates over 10 years
City of GeorgetownPage 71 of 103
Next Steps/Timeline
•Issue RFP within next 30 -45 days
•Firm selected
–Selection committee will score and interview
proposals
•Approval process Spring 2020
–Parks Board Recommendation
–Council Approval
•Estimated Adoption Summer 2021
City of GeorgetownPage 72 of 103
Questions
City of GeorgetownPage 73 of 103
City of Georgetown, Texas
City Council Workshop
February 11, 2020
S UBJEC T:
P resentation and discussion regarding the P arks and Recreation Cost Recovery P olicy Development -- Kimberly
Garrett, P arks and Recreation Director
I T EM S UMMARY:
This workshop presentatio n will introduce the topic of cost recovery. During the 2020 fiscal year, staff will work to
develop a policy on cost recovery. A po lic y is important to ensure fiscal responsibility and financial stability of programs
and services. In the City’s Fiscal and Budgetary P olicy, cost recovery is briefly mentioned under Revenue Management,
but there are no details on ho w fees should be set and if specific programs or services should have different cost recovery
goals. Through this process, we will be asking the questions of “who benefits” and “who should pay”. The industry best
practice is to have a tiered appro ach related to the amount of subsidy a pro gram should have based on who benefits, the
community o r the individual. In addition, there are different costs to consider when developing a policy, including direct
costs, indirect costs and capital costs. All or some of the costs should be considered in develo ping the policy. This policy
development process will be going on simultaneously with the master plan update and will be included in the community
engagement and outreach process for that plan. Staff will develop a draft policy for review by City Council.
F I NANC I AL I MPAC T:
N A
S UBMI T T ED BY:
Kimberly Garrett, P arks and Recreation Director
AT TAC HMENT S :
Description
P resentation
Page 74 of 103
Parks & Recreation
Cost Recovery Policy
Development
City Council Workshop
February 11, 2020
City of GeorgetownPage 75 of 103
Agenda
•What is Cost Recovery?
•Why a policy is important
•Current Fiscal & Budgetary Policy
•Creating a Policy
•Next Steps
•Questions
Page 76 of 103
What is cost recovery?
•Cost recovery is the amount of the annual
operating budgeted expense that can be
offset by funding from sources other than
general taxpayer investment such as
property tax.
City of GeorgetownPage 77 of 103
Why a policy is important
•Ensures fiscal responsibility and financial
stability of programs and services
•Creates citizen & staff awareness of all
associated costs and price structure
•Required as part of the Commission for
Accreditation for Parks and Recreation
Agencies (CAPRA)
City of GeorgetownPage 78 of 103
Current Fiscal & Budgetary Policy
•Addressed under Revenue Management
–Equity | Minimize subsidies
•Recognize benefit tax payers contribute to City
programs and services
•States resident rates should be 75% of non resident
rates for membership
–Revenue Adequacy | Willingness & Ability to pay
•Target operational cost recovery is between 50-60%
City of GeorgetownPage 79 of 103
Process of creating a policy
•Questions to ask?
–“Who benefits” and “who should pay”
•Taxpayers | Individuals | Both
•Involve key stakeholders –City Council,
Parks Board, user groups, and staff
•Industry best practice -a tiered approach
based on who benefits:
Community Individual
Page 80 of 103
What costs to include?
•Direct cost
–Expenses directly related to the operation of
the program or service (instructor, supplies,
equipment, etc)
•Indirect Costs
–Costs incurred with or without the service
provided (utilities, maintenance, janitorial,
administration and fleet costs)
•Capital Costs
Page 81 of 103
Benefits Model | Tier Approach
City of GeorgetownPage 82 of 103
Next Steps
•Master Plan RFP includes an add
alternate for assistance with this policy
•Utilize public input/community
engagement process in conjunction with
master plan
•Establish draft policy for City Council
Review
City of GeorgetownPage 83 of 103
Questions
City of GeorgetownPage 84 of 103
City of Georgetown, Texas
City Council Workshop
February 11, 2020
S UBJEC T:
P resentation and review regarding the downtown parking garage project and discussion of options for further review of
additional sites -- David Morgan, City Manager
I T EM S UMMARY:
This workshop is to pro vide background fo r the current work on the proposed downtown parking garage at 6th and Main
and to discuss options for council direction on analysis of different sites.
F I NANC I AL I MPAC T:
T he funding for the current garage was included in the F Y 2019 B udget at $5 million. A contract for $348,000 was
approved in N ovember 2019 with Wantman Group for the architectural and engineering design on the proposed
structure.
S UBMI T T ED BY:
David Morgan, City Manager
AT TAC HMENT S :
Description
Downtown P arking P resentation
P arking S pac es Downtown Worksheet
Page 85 of 103
Downtown Parking Garage
February 11, 2020
Page 86 of 103
Purpose of Workshop
•Provide background for current parking
garage site and downtown parking
–Define the changes driving demand for
additional parking
•Discuss options for council direction on
analysis of other sites
–Engagement from stakeholders
–Identify goals and criteria for decision making
Page 87 of 103
Background on Downtown
Parking
Page 88 of 103
Public Parking Changes since 2015
East Side of Austin
•8 spaces gained on 9th St
by GHC due to bus stop
moving
•(20) Spaces lost due to
Watkins
•(12) Spaces lost due to
City Hall sale
West Side of Austin
•138 Phase 1 Lot at 8th
and MLK (County
partnership)
•67 Phase 2 Lot at 8th and
MLK (County partnership)
•13 Blue Hole Parking
(coming soon)
City of GeorgetownPage 89 of 103
Why 6th and Main
•Sale of City buildings increased intensity of use
in the area
•Additional development in this area will increase
demand for parking
•A smaller garage could be funded within city’s
budget in the shorter term, alleviating parking
pressures to delay the larger and more
expensive garage
•Smaller garage proposed in FY18 for FY19
Budget
City of GeorgetownPage 90 of 103
Downtown Development
Timeline 2017-current
Page 91 of 103
City-owned lot
County-owned lot
Garage Site
Page 92 of 103
Parking Demands
•Availability of public parking in downtown was
the driver for the development code reducing
parking that would be required in other parts of
city
•For 2019 Downtown Development Projects
–691 would be required if not located in
Downtown
–108 added or identified through alternative
plans
City of GeorgetownPage 93 of 103
New businesses
•Watkins (office & restaurant)
•Hitch Hall
•Golden Rule
•600 Market Place
•Heritage Court (office &
restaurant)
•Rock Street Lofts
•Blue Corn Harvest
•Wish Well
•City Post (3 levels)
•Mango Tango
•Barrel and Amps
•Stromberg Hoffman (front)
•Lamppost Coffee
•Lark and Owl Bistro/Bookstore
•Wag Heaven
•309 Coffee
City of GeorgetownPage 94 of 103
MLK
Development in Downtown
Downtown
Overlay
Area 1 district
3 hour parking
Free Public Parking
New construction or
substantial redevelopment
Reuse or planned reuse of
existing building with more
intense use
Page 95 of 103
Area 1
Reuse or planned
reuse of existing
building with
more intense use
New
construction or
substantial
redevelopment
Downtown Development Parking Analysis
parking requirement if use located outside downtown overlay
33
spaces
110
spaces
29
spaces 155 spaces
32 spaces
63 spaces
23
spaces
25
spaces
30 spaces
22
spaces
104 spaces
16
spaces
49
spaces
Page 96 of 103
Area 1
Reuse or planned
reuse of existing
building with
more intense use
New construction or
substantial
redevelopment
Downtown Development Analysis
opportunities for new development
Undeveloped platted
lots
Page 97 of 103
Next Steps -Opportunities
Page 98 of 103
Summary -Verification
•Consensus
–Additional public parking is needed
–Parking structures should be considered
–More public input should be initiated
•Feedback
–Other sites should be studied
City of GeorgetownPage 99 of 103
Expand Scope of Study
•Pause on 6th and Main Lot
•Utilize existing consultant to expand study
•Review other sites
–Based upon updated development and
parking demands
City of GeorgetownPage 100 of 103
Expand Scope of Study
•Establish Criteria for review/evaluation
•Potential criteria
–Fiscally responsible
–Consistent with Downtown Master Plan
•Design criteria
–Location where it serves the highest need
•Accessibility
•Alleviate immediate pressures short/mid-term
City of GeorgetownPage 101 of 103
Next Steps
•Feedback on revised approach from
Council
•Discussion with Design Committee
–Meeting on 2/13/20
•Next Steps
–Return to Council with scope changes and
contract change for consultant
–Proposed public engagement process
City of GeorgetownPage 102 of 103
Development Parking Requirement outside of
downtown
No. of Parking
Spaces (outside
of downtown)
Parking
Requirement
(Downtown)
No. of Parking
Spaces
(downtown)
Watkins Building
(office/ restaurant )
(office )1 per 300 ft 2 GFA/ (restaurant) 1 per
100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces
33
No off-street
parking
requirement in Area
1
0
Hitch Hall
1 per 100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces
63
No off-street
parking
requirement in Area
1
0
Golden Rule
1 per 100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces
32
No off-street
parking
requirement in Area
1
0
114 E. 7th Street
(mango tango/ 600
market place)
(Mango Tango)1 per 100 ft 2 of designated
seating area/entertainment area + 4
additional spaces / (600 Market place )1 per
250 ft 2 GFA for first 20,000 ft
30
No off-street
parking
requirement in Area
1
0
City Post
(basement/ 1st floor
restaurant/ event
center)
(basement/ and 1st floor restaurant) 1 per
100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces / (event facility ) 1 per 400 ft 2 GFA +
1 additional per 4 capacity seating
155
No off-street
parking
requirement in Area
1
0
Heritage Court
(restaurant/ office)
(restaurant) 1 per 100 ft 2 of designated
seating area/entertainment area + 4
additional spaces / (office) 1 per 300 ft 2 GFA
110 1 per 500 sq. ft GFA 32
Lamppost Coffee
1 per 100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces
22
No off-street
parking
requirement in Area
1
0
Rock Street Lofts
(retail/ residential)
(retail)1 per 250 ft 2 GFA for first 20,000 ft 2
GFA,/ (residential) 1.5 per 1-bedroom unit
2 per 2-bedroom unit
2.5 per 3-bedroom unit
+ additional 5% of total spaces for visitor use
23
1 per 500 sq. ft
GFA/ 1 space per
unit (alternative
parking plan)
14
Blue Corn Harvest
1 per 100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces
29
No off-street
parking
requirement in Area
1
0
Wish Well 1 per 400 ft 2 GFA + 1 additional per 4
capacity seating 104
50% of the
following: 1 per 400
ft 2 GFA + 1
additional per 4
capacity seating
52
Stromberg Hoffman
Building - 718 S. Austin
Avenue and 209 8th
Street (street front
restaurant space/
Barrel and Amps/ 2nd
floor yoga studio)
(restaurant) 1 per 100 ft 2 of designated
seating area/entertainment area + 4
additional spaces / (yoga studio) 1 per 250 ft
2 GFA for first 20,000 ft 2 GFA,
49
No off-street
parking
requirement in Area
1
0
205 W. 6th Street
(Lark and Owl
Bistro/Bookstore/ Wag
Heaven)
(Bistro) 1 per 100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces / (Bookstore and Wag Heaven) 1 per
250 ft 2 GFA for first 20,000 ft 2 GFA,
25 1 per 500 sq. ft GFA 8
309 Coffee
1 per 100 ft 2 of designated seating
area/entertainment area + 4 additional
spaces
16 1 per 500 sq. ft GFA 2
* specific area dedicated to seating space has not been determined.
The area of the entire space dedicated to the use has been used for
parking estimates
TOTAL 691 108
Page 103 of 103