Loading...
HomeMy WebLinkAboutAgenda CC 07.14.2020 WorkshopN otice of M eeting of the Governing B ody of the C ity of Georgetown, Texas J uly 14 , 20 20 The Georgetown City Council will meet on J uly 14, 2020 at 2:30 P M at Teleconference The City of Georgetown is committed to compliance with the Americans with Disabilities Act (AD A). If you require assistance in participating at a public meeting due to a disability, as defined under the AD A, reasonable assistance, adaptations, or accommodations will be provided upon request. P lease contact the City Secretary's Office, at least three (3) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 808 Martin Luther King J r. Street, Georgetown, TX 78626 for additional information; TTY users route through Relay Texas at 711. J oin fr om a P C, M ac , i P ad, i P hone or A ndroid devic e: P lease c lick this U R L to join: https://geor getowntx.zoom.us/s/99335091756? pwd=R kwr VmZy Y nl I S zZy NkE x L 1d RTU E r dz09 P assword: 668390 O r join by phone toll fre e: (833)548-0276 or (833)548-0282 or (877)853-5257 or (888)475-4499 Webinar I D: 993 3509 1756 P assword: 668390 Citizen comme nts are acc epted in thr ee differ ent for mats: Submit the fol lowing for m by 2:15 p.m. on the date of the me eting and the C i ty Se cr etar y wi ll r ead your c omments i nto the re cor di ng during the ite m that is be ing disc usse d – https://re cor ds.geor getown.or g/F or ms/Addr essCounc il You may log onto the me eti ng, at the l ink above , and “r ai se your hand” dur ing the ite m. If you ar e unsur e i f your devic e has a mic rophone pl e ase use your home or mobile phone to di al the toll fre e numbe r. To J oin a Zoom M e eti ng, c li c k on the link and join as an atte ndee . You wil l be aske d to e nte r your name and e mail addr e ss – this i s so we c an i de nti fy you whe n you are c all ed upon. A t the bottom of the webpage of the Zoom M e e ti ng, ther e is an opti on to R aise your H and. To spe ak on an ite m, si mply c li ck on that Raise Your H and option once the i te m you wi sh to speak on has ope ne d. Whe n you ar e c alled upon by the M ayor, your devic e wi ll be r e mote ly un-mute d by the A dministrator and you may speak for thre e minutes. P le ase state Page 1 of 74 your name c le ar l y upon be i ng all owe d to spe ak. Whe n your time is over, your de vice will be muted again. As anothe r option, we ar e ope ni ng a c i ty confe re nc e r oom to allow public to “watch” the vir tual me e ti ng on a bigge r sc re en, and to “r aise your hand” to spe ak fr om that publ ic de vic e . This Vie wi ng R oom is locate d at C ity H all , 808 M ar tin L uthe r K ing J r. Str ee t, C ommunity Room. S ocial D istanc ing will be strictly e nforc ed. F ac e masks ar e r equire d and will be provided onsite . Use of pr ofanity, thr eate ning language, slande rous r emarks or thr eats of harm are not allowed and will re sult in you be ing imme diately re moved from the me eting. If you have questions or ne ed assistanc e, ple ase contact the City Se cr etar y’s offic e at c s@ge orge town.org or at 512-930-3651. Policy De ve lopme nt/Re vie w Workshop - A P resentation and discussion regarding C O VID-19 and the City's modified operations and programs -- J ack Daly, Community Services Director B P resentation and discussion regarding small area planning for the San J ose and TR G neighborhoods -- Sofia Nelson, P lanning Director C P resentation and discussion regarding the Intersection/Sidewalk CIP -- Wesley Wright, P E, Systems Engineering Director and Ray Miller, Director of P ublic Works D P resentation and discussion regarding the FY2021 assessed value trends, and the projected tax impact of five year capital improvement plan -- Leigh Wallace, Finance Director Exe cutive Se ssion In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon's Texas Codes, Annotated, the items listed below will be discussed in closed session and are subject to action in the regular session. E Sec. 551.071: Consul tati on w i th Attorney Advice from attorney about pending or contemplated litigation and other matters on which the attorney has a duty to advise the City Council, including agenda items - Litigation Update - P E C Franchise - Net Metering Sec. 551.086: Certai n P ubl i c P ow er Uti l i ti es: Competi ti ve M atters - P urchase P ower Update Adjournme nt Ce rtificate of Posting I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notice of Meeting was pos ted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily ac cessible to the general public as required by law, on the _____ day of _________________, 2020, at __________, and remained so pos ted for Page 2 of 74 at leas t 72 c ontinuous hours prec eding the s cheduled time of said meeting. __________________________________ R obyn Dens more, C ity S ec retary Page 3 of 74 City of Georgetown, Texas City Council Workshop July 14, 2020 S UBJEC T: P resentation and discussion regarding C O VID-19 and the City's modified operations and programs -- J ack Daly, Community Services Director I T EM S UMMARY: F I NANC I AL I MPAC T: N/A S UBMI T T ED BY: J ack Daly AT TAC HMENT S : Description DR AF T P res entation Page 4 of 74 COVID-19 REPORT July 14, 2020 Page 5 of 74 OVERVIEW •UPDATE FROM WCCHD •LOCAL MASK ORDER •LATEST FROM GOVERNOR •SEEKING DIRECTION ON SPECIAL EVENTS AND DOWNTOWN OUTDOOR DINING Page 6 of 74 UPDATE FROM WCCHD Page 7 of 74 UPDATES SINCE JULY 23 WORKSHOP Cancelled July 4 fireworks show Closed Blue Hole Park Three firefighters tested positive for COVID-19 Issued local mask order Updated mask order to align with Governor’s July 2 order Updated mask guidance to City employees Working with WCCHD to set-up new testing site in Georgetown Page 8 of 74 Issued order on June 29 Everyone in Georgetown age 10 and older is now required to wear a face covering while in public, when maintaining six feet of distance isn’t possible. •Enforcement •Exemptions •Outreach LOCAL MASK ORDER Page 9 of 74 LATEST FROM GOVERNOR On July 2, the Governor established statewide face covering requirement, issued proclamation to limit gatherings •Exemptions •Allows for fines for individuals, •Disallows law enforcement from detaining, arresting, or confining anyone in jail for violation •Proclamation prohibits *outdoor* gatherings of more than 10 people without Mayoral approval •Exemptions Page 10 of 74 SPECIAL EVENTS •POPPtoberfest: October 23-25 •Music on the Square: Cancelled •Beer Crawl: Cancelled •Movies in the Park: Cancelled Page 11 of 74 SPECIAL EVENTS •All other special events in Georgetown facilitated by other organizations must follow the Governor’s guidance. •At current time, no outdoor gatherings will be approved •Developing more robust shop small campaign(s) •Exploring expanded outdoor dining for downtown businesses Page 12 of 74 QUESTIONS Page 13 of 74 City of Georgetown, Texas City Council Workshop July 14, 2020 S UBJEC T: P resentation and discussion regarding small area planning for the San J ose and TR G neighborhoods -- Sofia Nelson, P lanning Director I T EM S UMMARY: As directed by City Co uncil during the ir J une 23rd regular meeting, staff is providing an intro duction to small area planning as an implementation step of the 2 03 0 Comprehensive P lan and pro viding an o verview o f the San J ose and Track Ridge Grassho ppe r Neighbo rhoo ds as candidates for small area planning. The focus of the presentatio n is the process for collecting input from e ach neighborho od o n the issues and oppo rtunities they would like to see addressed in each plan which will inform the project scope. Staff is seeking feedback from the City Council: •Does the City Council support the process to develop a scope for a small area plan for the TR G and San J ose Neighborhoods? •Is there specific information from the neighborhood included in the scope of each plan? •W hat does a successful small area plan look like for you? F I NANC I AL I MPAC T: The issues and opportunities identified by the neighborhood and City Council will inform the total project costs, which will be presented to City Council in September. S UBMI T T ED BY: Nat Waggoner, P M P, AIC P AT TAC HMENT S : Description Map of S an Jos e Map of T R G P resentation Page 14 of 74 Approximate Boundaries for San Jose Neighborhood MA P L E S T VIN E S T E 19TH S T QUAILVALLEYDR E 21ST S T AS H S T AL L E Y E 17TH1/2ST HO G G S T E 16TH S T LA U R E L S T E 19THST E18THSTOLIVE ST E 19TH S T KN I G H T S T E18THST E 20TH S T PINEST C O F F E E ST E 17TH ST ELMST E16THST L A U R E L S T S COLLEGE ST E 17TH S T S C H U R C H S T ANNIEPURLDR LOUISEST E 20TH S T VI R G I N I A S T VI N E S T WAL N U T S T E 16TH ST E 15TH ST H OLLY ST E 19TH 1 / 2 S T E 16TH ST E 17TH ST E 17TH S T E 22ND S T SA N J O S E S T 0 560280 Feet ¯ Boundary Parcels road Page 15 of 74 Approximate Boundaries for TRG Neighborhood W A T E R S E DGE CIR E 7TH ST WAL N U T S T WALNUTST PIN E S T RIVEROAKSCV KN I G H T S T HAR T S T RI VEROAKSCV E 17TH ST CYRUS AV E E17THST E 14TH ST E 3RD ST E16THST W 8TH ST E 15TH ST W9THST E11THST SHILLVIE WDR ASH S T ELMST WAL N U T S T E 13TH ST S O A K H O L L O W R D WUNIVERSITYAVE E UNIVERSITY AVE W 4TH ST SCENICDR RUCKERST MON T G O M E R Y S T E18THST E 16TH ST BRIDGEST CYRUS AV E BRIDGEST MARTINLUTHERKINGJRST MONT GOMERYST S M Y R T L E S T WES T S T W 13TH ST W 14TH ST HO L L Y S T WES T S T E 8TH ST LEA N D E R S T M A R T I N L UTHERKINGJRST W18THST E 4TH ST E9THST S I H 3 5 S B CAN D E E S T WEST S T FO R E S T S T W6THST E 10TH ST E 8TH ST W 4TH ST E 14TH ST PINEST E 5TH ST E2NDST E 6TH ST RAILROADAVE E 10TH ST RO C K S T E 9TH 1/2 ST W 3RD ST HARTST E 3RD ST SCHURCHST W 5TH ST TIN B A R N A L Y W 10TH ST E 11TH ST E9THST NHI LLVI EWDR S MYRTLEST W11THST FO R E S T S T W5THST W 7TH ST NOAK HOLLOWRD W 14TH ST W UNIVERSITY AVE W U N IVERSITYAVE W 16TH ST FORESTST W 17TH ST W 2ND ST E9THST W U NI V ERSITY AVE W15THST S M A I N S T S CENI C DR GEO R G E S T S A U S T I N A V E W2NDST E 16TH ST E 17TH ST WUNIVERSITYAVE HOLLYST N C O L L E G E S T TIM B E R S T STONECIR W 9TH ST W16THST PV R SCOLLEGE ST SIH35NB S I H 3 5 N B RIVERHILLSDR SI H 3 5 F W Y N B ENTR261NB SPRINGHOLLOW RIVE R Y DRIVE WAY SI H 35 F W Y S B EXIT260SB U NIVERSITYTN E EXIT262NB UNIVERSITYTNW BLUEHOLEPARKRD ENTR262SB 0 1,000500 Feet ¯ Boundary Downtown Overlay Old Town Overlay Parcels Page 16 of 74 Small Area Planning --------------------- City Council Workshop July 14, 2020 Page 17 of 74 Presentation Team •Susan Watkins, Housing Coordinator •Nat Waggoner, Long Range Planning Manager •Sofia Nelson, Planning Director Page 18 of 74 Purpose of Presentation Introduce small area planning Introduce the San Jose and TRG neighborhoods as candidates for small area planning Page 19 of 74 Presentation Outline Introduction to Small Area Plans San Jose Neighborhood TRG Neighborhood Process/timeline for establishing a scope and defining success Page 20 of 74 Feedback Requested Does the City Council support the process to develop a scope for a small area plan for the TRG and San Jose Neighborhoods? Is there specific information from the neighborhood included in the scope of each plan? What does a successful small area plan look like for you? Page 21 of 74 Components of Small Area Plans Community Outreach Defining Success Vision •Strengths •Weakness •Opportunities •Threats Implementation •Goals •Policies •Strategies •Action Plan Page 22 of 74 Types of Small Area Plans •Neighborhood Plans: cover one distinct residential neighborhood. •Corridor Plans: cover a significant linear feature such as a main street or arterial. •District Plans: include more than one neighborhood or corridor that are experiencing common conditions and issues. Coming soon Page 23 of 74 Common elements of a Small Area Plans Outreach and Visioning Land Use Housing Community Design Economic Development Public Facilities Community Heritage Transportation Implementation …selected as a result of strengths, needs, and opportunities defined by the neighborhood Page 24 of 74 San Jose Neighborhood 0.06 square miles Page 25 of 74 Track Ridge Grasshopper (TRG) Neighborhood .19 square miles Page 26 of 74 Path to partnership Meet Listen Learn Plan Confirm Ask questions Be present Show interest Trusted leaders Concerns Values Vision Develop a partnership to co-achieve vision Develop a plan scope Is this partnership going to achieve the vision? Jul Aug Sept Page 27 of 74 Feedback Requested Does the City Council support the process to develop a scope for a small area plan for the TRG and San Jose Neighborhoods? Is there specific information from the neighborhood included in the scope of a neighborhood plan? What does a successful small area plan look like for you? Page 28 of 74 For more information •If the public wants to participate or get more information, please contact either: Susan Watkins (512) 930-8477, susan.watkins@georgetown.org Nat Waggoner (512) 930-3584, nat.waggoner@georgetown.org Page 29 of 74 City of Georgetown, Texas City Council Workshop July 14, 2020 S UBJEC T: P resentation and discussion regarding the Intersection/Sidewalk CIP -- Wesley Wright, P E, Systems Engineering Director and Ray Miller, Director of P ublic Works I T EM S UMMARY: P lease find attached presentation discussing various sidewalk and intersection improvement projects. F I NANC I AL I MPAC T: Funding information is included in the presentation and part of the annual budgeting process S UBMI T T ED BY: Wesley Wright AT TAC HMENT S : Description F Y2021 S idewalks and S ignals P res entation Page 30 of 74 FY2021 Annual Budget FY21 Budget Capital Improvement Plan Sidewalks & Signals City Council Workshop July 14, 2020 Page 31 of 74 FY2021 Annual Budget Purpose Seek feedback from the City Council on the sidewalk and intersection improvements to include in the Capital Improvement Plan (CIP) for Fiscal Year 2021. Page 32 of 74 FY2021 Annual Budget Proposed FY21 CIP •Sidewalks –Continuation of Priority 1 ADA Master Plan –Downtown –$1MM •Intersection Improvements –Signals, turn lanes, etc. –Locations TBD –$1.8MM Page 33 of 74 FY2021 Annual Budget SIDEWALKS 2014 Sidewalk Master Plan http://sidewalksandfacilities.georgetown.org/ –$100MM Total Sidewalks/Ramps –$10MM Priority 1 –2015 Road Bond •$1MM per year for 10 years Page 34 of 74 FY2021 Annual Budget SIDEWALKS –2015 Road Bond Year 1 (2016) –Various Intersections & Signal Ramps Year 2 (2017) -Intersections, 10th/11th, Southbound IH35 (29-2243) Year 3 (2018) –Austin Avenue (University –Leander) Year 4 (2019) –7th Street (Downtown –Southwestern University Year 5 (2020) –Downtown (Square & New City Hall) Year 6 (2021) –Downtown (continued) Year 7 (2022) –Downtown (continued) Year 8 (2023) –Downtown (complete) Year 9 (2024) –SH29 (Austin to Southwestern University) Year 10 (2025) -SH29 (Austin to Southwestern University) Page 35 of 74 FY2021 Annual Budget SIDEWALKS –2020 Downtown Page 36 of 74 FY2021 Annual Budget SIDEWALKS –Looking Forward •2020-2025 Complete Downtown and SH29 Improvements •Priority 2 Sidewalks –Arterials, high ped counts (blue ) –Possibly include in May 2021 Road Bond Election –2014 Cost Estimate $7.5MM –Update Locations and Cost Estimate •Schools •Intersections Page 37 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS •Currently under design –SH29 & HEB/Wolf Crossing –Westinghouse & Scenic Lake Drive –Westinghouse & Blue Ridge (developer) •Proposed FY21 Funding –$1.8MM –2015 Road Bond Funds Page 38 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS 2pts each -MUTCD Warrants 0 to 10pts -Average Daily Traffic 0 to 10pts -Peak Hour Volume 0 to 10pts -Crash 0 to 5pts -Speed 0 to 10pts -Pedestrian/Bike 0 to 15pts -Improvement Type 1pt each -Special Conditions 0 to 10.95pts -Time Spent on List Evaluation Criteria –Points Assigned Based On Objective Data Page 39 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS MUTCD Warrants –2pts each A warrant describes a threshold condition based upon average or normal conditions that, if found to be satisfied as part of an engineering study, shall result in analysis of other traffic conditions or factors to determine whether a traffic control device or other improvement is justified. Warrants are not a substitute for engineering judgment. The fact that a warrant for a particular traffic control device is met is not conclusive justification for the installation of the device. Page 40 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Average Daily Traffic –0 to 10pts Page 41 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Peak Hour Volume - 0 to 10pts Page 42 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Crash –0 to 10pts Page 43 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Speed –0 to 5pts Pedestrians –0 to 10pts Page 44 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Improvement Type –0 to 15pts New Signal 10pts Signal/Road Mods 5pts Turn Lane 5pts Special Conditions –0 to 17pts Public Facilities (Rec, Medical, High Density) 1pt School Zone 10pts Sight Distance Issues 2pts Time Spent On List 0.01pts per day 3.65pts per year 10.96pts max Page 45 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS -Rankings Intersection Ranking Score SE Inner Loop at Rockride Lane 42.01 Sun City Blvd at Dell Webb 29.00 Shell Road at Verde Vista 25.08 SE Inner Loop at Maple St 20.67 Williams Dr at Estella Crossing 20.67 Northwest Blvd at Golden Oaks 15.33 Austin Ave At 5th Street 15.00 University at CR 103 14.67 Austin Ave at 16th 11.67 Sam Houston at Maple St 10.67 Austin Ave at 10th 6.67 Northwest Blvd at Golden Oaks 3.00 Page 46 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Other Intersections Under Consideration (continued): –Williams Drive & Serenada •Striping ($25k) •Turn Lane Improvements •Pedestrian Actuation •NOT BOND FUNDED. Funded with FY21 Operational Budget, as available Page 47 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Rockride & SE Inner Loop •42.01 Rating •Peak Hour School Traffic •Warrants met •Level of Service B (good) •Traffic Signal may increase delay •Proposed striping & raised medians ($50k) •Proposed reduced speed (55 to 40mph) •NOT Bond funded. Funded with FY21 Operational Budget, as available Page 48 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS -Rankings Sun City & Del Webb •29.00 Rating •Existing 3-Way Stop (everyone stops) •Two Signal Warrants Met •No Funding Proposed FY21 •Continue to Study & Evaluate Options •Public Engagement •Multiple Considerations: –Construct Signal (potentially add to overall delay) –Roundabout (least overall delay, complications with golf cart, unfamiliarity) –Do Nothing, Leave Intersection As-Is Page 49 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Shell Road & Verde Vista •25.08 Rating •Recently Constructed Turn Lanes (2018) •Three Warrants Met as of January 2020 •Proposed $600k Bond Funds for FY21 Page 50 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS SE Inner Loop & Maple -20.67 Rating and; Sam Houston & Maple -10.67 Rating •Possible Multi-Signal Complex (not currently warranted) •Possible Roundabout –likely temporary –5 to 10 or more years •Possible Future Flyover With Freeway Cross-Section •Proposed $400k Bond Funds for FY21 for design/ROW Page 51 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS •Williams Drive & Estrella Crossing –20.67 Rating –Wesleyann at Estrella –Good separation from DB Woods and Serenda existing signals –Proposed $600k Bond Funds for FY21 Page 52 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Other Intersections Under Consideration: –Northwest Blvd & Lakeway Dr. (15.33) –Austin Ave & 5th Street (15.00) (Pedestrian Flasher?) –University & CR103 (14.67) –Austin & 16th Street (11.67) (Recently Installed Pedestrian Flasher) –Austin & 10th Street (6.67) (Recently Installed Pedestrian Flasher) –Northwest Blvd & Golden Oaks (3.00) –Williams & Sedro/Gatlin (not ranked, new mixed-use developments) –Sam Houston/SE1 & Rock Ride (not ranked, recent enhancements) Page 53 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS Other Intersections Under Consideration (continued): –Austin & 5th Street •Flasher similar to 10th & Austin, No Signal Warrants met •$100k FY21 Bond Funds –8th Street @ Georgetown Library •Ped Flasher similar to 10th & Austin •New Parking Lot, Proposed City-Center enhancements •$50k FY21 Bond Funds –GMC/Georgetown Municipal Complex (Industrial & Leander Road/2243) •Possible Ped Flashers similar to 10th & Austin, Public/Employee Access •$50k FY21 Bond Funds Page 54 of 74 FY2021 Annual Budget SIGNALS & INTERSECTIONS •Downtown Sight Distance Restrictions –6th Street and 9th Street @ Austin Avenue –Possibly Remove a Few Parking Spots –Selective Landscape Trimming/Removal –In House Effort, NOT BOND FUNDED, FY21 Operational Budget. Page 55 of 74 FY2021 Annual Budget Recommendations and Guidance Sidewalks –$1MM –Continue with Priority 1 Signals -$1.8MM (2015 Road Bond Funds) •Sun City & Del Webb –Continue to Study Options –Public Engagement (Signal, Roundabout, As-Is) •Shell and Verde Vista –Signal $600k •SE1/Inner Loop/Maple –Roundabout design/ROW $400k •Williams & Estrella –Signal $600k •Flashers –Austin & 5th Flasher -$100k –8th @ Library Flasher -$50k –GMC Flasher -$50k Seek feedback from the City Council on the sidewalk and intersection improvements to include in the Capital Improvement Plan (CIP) for Fiscal Year 2021. Is there additional information the City Council needs prior to providing direction on the proposed projects? Page 56 of 74 FY2021 Annual Budget FY21 Budget Capital Improvement Plan Sidewalks & Signals City Council Workshop July 14, 2020 Page 57 of 74 City of Georgetown, Texas City Council Workshop July 14, 2020 S UBJEC T: P resentation and discussion regarding the FY2021 assessed value trends, and the projected tax impact of five year capital improvement plan -- Leigh Wallace, Finance Director I T EM S UMMARY: Annually in the Budget process, staff bring forward an analysis of the Five Year Capital Improvement P lan and the General Debt Service Fund model. This tool assesses the impacts of issuing property-tax backed debt and allows for scenario testing and the adjustment of multiple variables including assessed value, sales tax, tax rate distribution, and debt service requirements. Staff will recommend a balanced model to Council and seek the Council’s feedback on the funded projects. This information then becomes part of the City Manager ’s P roposed FY2021 Budget. F I NANC I AL I MPAC T: None S UBMI T T ED BY: R LD on behalf of Leigh Wallace, Finance Director AT TAC HMENT S : Description Tax S upported Debt and C I P P res entation Tax Model 5 Year C apital Improvement P lan Page 58 of 74 FY2021 Annual Budget FY2021 5-year Capital Improvement Plan and Tax-Supported Debt Council Workshop 7-14-20 Page 59 of 74 FY2021 Annual Budget Property Tax Process •Assessed Value is certified on July 25th by Williamson Central Appraisal District (WCAD). •After the certification date, finance staff meets with the WilCo Tax Assessor Collector’s Office and verifies the Truth in Taxation form. –This form calculates the No New Revenue rate and the Voter Approval rate. –State requirement and must be published in the local paper and on City and WCAD websites. Page 60 of 74 FY2021 Annual Budget Truth in Taxation •The No New Revenue rate is the property tax rate the City would need to charge in order to produce the same amount of property tax revenues as last year while using the new valuations of the current year. •Typically, property values appreciate from year to year. In most years, the increased value of a property means a lower tax rate could produce the same amount of revenue. For example, a home valued at $100,000 with a tax rate of 42 cents would produce $420 in property tax revenue. If in the following year, the home is valued at $105,000, the No New Revenue rate would be 40 cents to produce the same $420 worth of revenue. The No New Revenue rate enables the public to evaluate the relationship between taxes for the prior year and for the current year. •Previously known as the Effective Rate. Page 61 of 74 FY2021 Annual Budget Truth in Taxation •The Voter Approval rate is the maximum tax rate the City can set before requiring an election to approve the tax rate. After adjustments for debt calculations, the Voter Approval rate is equal to the effective rate times 3.5%. •Previously known as the Rollback Rate. Page 62 of 74 FY2021 Annual Budget Tax Rate Calculation Variables Page 63 of 74 FY2021 Annual Budget Assessed Value Growth Source: Williamson Central Appraisal District Page 64 of 74 FY2021 Annual Budget What’s Changed Since Last Year? ***Not Certified Values*** Page 65 of 74 FY2021 Annual Budget What is Tax-Supported Debt? •Debt repaid with property taxes •General Obligation bonds (voter approved) –Parks and trails –Roads and bridges –Sidewalks •Certificate of Obligation bonds –Facilities –Capital equipment –Vehicles Page 66 of 74 FY2021 Annual Budget How the debt model works •As older bond issues are fully paid off, payments for existing debt decline •City Council prioritizes capital projects and new debt to pay for them •The tax rate brings in the appropriate amount of revenue to pay new and existing debt Page 67 of 74 FY2021 Annual Budget How the Model Works Page 68 of 74 FY2021 Annual Budget Assumptions •Assumptions in years 1 thru 5 (2021 –2025) –$300M –$175M of growth in new value and 4 -3% growth in existing value. Combined growth is 7 to 5% growth year over year. –3.5% growth in tax ceiling revenue –Tax rate for debt service and distribution of O&M (46.5%) and I&S (53.5%) tax ceiling remain constant. –Interest rates at 2.8% thru 3.7% Detailed chart attached to agenda item Page 69 of 74 FY2021 Annual Budget Model Results •For the past few fiscal years, the City has been able to issue around $17 million of new tax supported debt without raising the tax rate •Projections for FY2021 through FY2025 are the capacity to issue around $18 million of new tax supported debt without raising the tax rate Page 70 of 74 FY2021 Annual Budget Summary of 5-yr CIP Detailed chart attached to agenda item 5 Year Tax Supported CIP FY2021 FY2022 FY2023 FY2024 FY2025 Tax Supported Facilities 4,700,000 0 6,000,000 12,150,000 15,850,000 Fleet 3,230,000 2,781,500 3,227,400 2,647,500 2,484,000 Other 363,278 0 0 0 0 Parks 1,945,000 750,000 6,700,000 4,250,000 250,000 Public Safety 805,000 300,000 0 0 Streets 6,800,000 14,600,000 3,000,000 1,000,000 0 Tax Supported Total 17,843,278 18,431,500 18,927,400 20,047,500 18,584,000 Grand Total 17,843,278 18,431,500 18,927,400 20,047,500 18,584,000 Page 71 of 74 FY2021 Annual Budget Next Steps •Get Council’s feedback on the proposed CIP projects for FY2021 •Staff will provide an estimate on the No New Revenue and the Voter Approval rates at the Budget Workshops on July 21 and 22. •Certified tax roll on July 25th. •FY2021 Proposed Budget presented to Council August 11th and start tax rate adoption process. Page 72 of 74 City of Gergetown, Texas Projected $107,100,000 Bond Issuance Program Debt Capacity Analysis as of July 9, 2020. Analysis should be updated annually. (A) (B) (C) (D) (E) (F) (G) (H) (I) (J) (K) (L) (M) (N) (O) (P) Freeze-Adj. Less: Net $18,000,000 $18,000,000 $17,850,000 $20,675,000 $32,575,000 Proj. Total Less: Less: Total Net Est. FYE Assessed Est. AV Existing Self-Supporting Tax-Supp. Series 2021 Series 2022 Series 2023 Series 2024 Series 2025 Tax-Supp. Frozen I&S Fund Balance Tax-Supp. I&S 9/30 Value Growth D/S Debt Service D/S 5/15 2.88% 5/15 3.08% 5/15 3.28% 5/15 3.48% 5/15 3.68% D/S Revenues Drawdown D/S Tax Rate 2021 6,070,552,727$ 23,698,860$ (5,334,613)$ 18,364,247$ -$ -$ -$ -$ -$ 18,364,247$ (4,932,149)$ -$ 13,432,098$ 0.2250$ 2022 6,507,025,468 7.19%23,193,575 (5,215,408) 17,978,167 1,380,000 - - - - 19,358,167 (5,104,775) - 14,253,392 0.2213 2023 6,912,413,155 6.23%22,680,706 (4,961,661) 17,719,045 1,374,650 1,400,000 - - - 20,493,695 (5,283,441) - 15,210,254 0.2223 2024 7,283,609,741 5.37%22,401,309 (4,898,913) 17,502,396 1,381,300 1,399,900 1,409,000 - - 21,692,596 (5,468,362) - 16,224,234 0.2250 2025 7,633,223,009 4.80%21,416,697 (4,605,457) 16,811,239 1,377,150 1,400,090 1,410,570 1,663,688 - 22,662,737 (5,659,755) - 17,002,982 0.2250 2026 7,633,223,009 0.00%18,528,346 (4,345,597) 14,182,748 1,382,450 1,399,530 1,414,630 1,663,140 2,665,875 22,708,373 (5,705,650) - 17,002,723 0.2250 2027 7,633,223,009 0.00%18,164,086 (4,250,398) 13,913,688 1,376,950 1,398,270 1,412,770 1,661,480 2,662,450 22,425,608 (5,667,278) - 16,758,330 0.2218 2028 7,633,223,009 0.00%16,427,976 (3,952,562) 12,475,414 1,375,900 1,401,260 1,410,110 1,663,840 2,660,260 20,986,784 (5,463,824) - 15,522,960 0.2054 2029 7,633,223,009 0.00%16,297,027 (3,902,698) 12,394,329 1,379,150 1,403,390 1,406,700 1,665,040 2,661,320 20,909,929 (5,452,557) - 15,457,373 0.2045 2030 7,633,223,009 0.00%14,985,164 (3,460,071) 11,525,093 1,376,600 1,399,660 1,412,490 1,660,080 2,660,440 20,034,363 (5,321,197) - 14,713,166 0.1947 2031 7,633,223,009 0.00%14,183,690 (3,473,545) 10,710,145 1,378,350 1,400,180 1,412,190 1,659,140 2,662,670 19,222,675 (5,194,316) - 14,028,359 0.1856 2032 7,633,223,009 0.00%13,515,057 (3,477,315) 10,037,742 974,300 1,404,840 1,410,970 1,662,040 2,662,820 18,152,712 (5,019,135) - 13,133,577 0.1738 2033 7,633,223,009 0.00%13,406,152 (3,416,160) 9,989,992 972,550 993,480 1,413,830 1,663,600 2,660,840 17,694,292 (4,941,190) - 12,753,102 0.1688 2034 7,633,223,009 0.00%12,793,306 (3,148,357) 9,644,948 975,200 995,280 1,005,600 1,663,870 2,661,780 16,946,678 (4,810,183) - 12,136,496 0.1606 2035 7,633,223,009 0.00%12,268,583 (3,110,114) 9,158,469 977,100 991,280 1,006,120 1,182,800 2,660,450 15,976,219 (4,632,616) - 11,343,603 0.1501 2036 7,633,223,009 0.00%8,925,410 (1,882,346) 7,043,064 973,250 991,640 1,005,790 1,182,920 1,901,850 13,098,514 (4,051,492) - 9,047,022 0.1197 2037 7,633,223,009 0.00%6,881,273 (822,946) 6,058,326 973,800 991,200 1,004,610 1,181,960 1,902,070 12,111,966 (3,831,662) - 8,280,305 0.1096 2038 7,633,223,009 0.00%3,637,248 (408,165) 3,229,083 973,600 994,960 1,002,580 1,184,920 1,900,390 9,285,533 (3,135,984) - 6,149,548 0.0814 2039 7,633,223,009 0.00%1,648,000 (396,550) 1,251,450 972,650 992,760 1,004,700 1,186,620 1,901,810 7,309,990 (2,585,640) - 4,724,350 0.0625 2040 7,633,223,009 0.00%- - - 975,950 994,760 1,005,800 1,182,060 1,901,140 6,059,710 (2,207,320) - 3,852,390 0.0510 2041 7,633,223,009 0.00%- - - 973,350 995,800 1,005,880 1,186,420 1,903,380 6,064,830 (2,208,919) - 3,855,911 0.0510 2042 7,633,223,009 0.00%- - - - 995,880 1,004,940 1,184,340 1,898,340 5,083,500 (1,894,727) - 3,188,773 0.0422 2043 7,633,223,009 0.00%- - - - - 1,002,980 1,186,000 1,901,210 4,090,190 (1,560,492) - 2,529,698 0.0335 2044 7,633,223,009 0.00%- - - - - - 1,186,220 1,901,610 3,087,830 (1,206,063) - 1,881,767 0.0249 2045 7,633,223,009 0.00%- - - - - - - 1,899,540 1,899,540 (762,774) - 1,136,766 0.0150 285,052,462$ (65,062,878)$ 219,989,584$ 23,524,250$ 23,944,160$ 24,162,260$ 28,470,178$ 45,630,245$ 365,720,677$ (102,101,499)$ -$ 263,619,178$ Assumptions: (1) FY 2021 preliminary Assessed Valuation ("AV") provided by the W illiamson County Appraisal District as of July 4, 2020. FY 2022 through FY 2025 AV growth rates provided by the City as of July 3, 2020. Projected AV growth shown for purposes of illustration only. (2) All financing assumptions are as of July 6, 2020 for purposes of illustration only. 80% of each new issuance was amortized over 20 years at 3% and 20% of each new issuance was amortized over 10 years at 2%. Preliminary, subject to change. (3) Total frozen tax revenues through FY 2025 provided by the City as of July 3, 2020 and assume 3.5% growth through FY 2026. Frozen tax revenues after FY 2026 are assumed to remain constant and the portion attributable to the I&S tax rate is calculated on a pro rata basis assuming a constant M&O tax rate of $0.195 (at 99.00% collections). (4) Est. tax collections rate: 99.00% $107,100,000 Projected New Issuance Specialized Public Finance Inc.Page 1 7/10/2020 Page 73 of 74 Tax Supported Five Year CIP Project Name Category Funding FY2021 FY2022 FY2023 FY2024 FY2025 Beyond 5 Years Animal Services Renovation/Addition Facilities CO ‐                       ‐                       ‐                       ‐                       6,200,000           Facility Services Renovation/Expansion Facilities CO ‐                       ‐                       ‐                       ‐                       900,000              Fire Logistics Building Facilities CO 950,000              ‐                       ‐                       Fire Station No. 1 Renovation Facilities CO ‐                       3,750,000           ‐                       ‐                       Fire Station No. 3 Renovation Facilities CO ‐                       ‐                       3,150,000           ‐                       Fire Station No. 4 ‐ Relocation Facilities CO ‐                       ‐                       ‐                       ‐                       7,000,000           Fire Station No. 8 Facilities CO ‐                       ‐                       7,000,000           Georgetown Municipal Complex Renovation Facilities CO ‐                       ‐                       ‐                       ‐                       8,500,000           Mixed Use Parking Garage Facilities CO ‐                       ‐                       ‐                       ‐                       ‐                       12,000,000        Parks and Recreation Administration Relocation Facilities CO ‐                       ‐                       1,100,000           9,000,000           Public Facilities Master Plan Facilities CO ‐                       ‐                       ‐                       ‐                       ‐                       175,000              Public Works Relocation Facilities CO ‐                       ‐                       ‐                       ‐                       ‐                       4,200,000           Purchasing/Warehouse/Fleet Services Relocation Facilities CO ‐                       ‐                       1,750,000           15,100,000        Recreation Center Teen/Senior Renovation Facilities CO 200,000              ‐                       Signature Gateway Facilities CO ‐                       200,000              ‐                       ‐                       ‐                       Festival/Public Space ‐ Georgetown City Center Facilities CO 1,300,000           2,150,000           Public Safety Operation and Training Center Phase II Facilities CO 4,500,000           ‐                       ‐                       ‐                       Public Safety Operation and Training Center Phase III Facilities CO ‐                       3,000,000           Public Safety Vehicles ‐ Fire Fleet CO 2,290,000           1,814,000           2,230,000           1,797,000           1,690,000           5,765,000           Public Safety Vehicles ‐ Police Fleet CO 940,000              967,500              997,400              850,500              794,000              5,618,000           Radio Replacement Fleet CO 363,278              ‐                       ‐                       ‐                       ‐                       ‐                       Neighborhood Park Development Parks CO 250,000              ‐                       250,000              250,000              250,000              250,000              Parks Master Plan Parks CO 200,000              Tennis Center Facility Improvement Parks CO 70,000                ADA Transition Plan Parks CO 150,000              150,000              ‐                       ‐                       Blue Hole Park Improvement Parks 2008 GO ‐                       ‐                       ‐                       ‐                       1,200,000           Regional Trail Development Parks 2008 GO 1,275,000           ‐                       1,200,000           2,400,000           San Gabriel Park Parks 2008 GO ‐                       600,000              5,250,000           8,700,000           Southeast Community Park Parks 2008 GO ‐                       ‐                       4,000,000           10,500,000        Westside Park Development Parks 2008 GO ‐                       ‐                       ‐                       ‐                       10,000,000        Westside Recreation Center Parks 2008 GO ‐                       ‐                       ‐                       ‐                       20,600,000        Cardiac Monitors Public Safety ‐ Fire DCO 225,000              ‐                       ‐                       ‐                       ‐                       SCBA Replacement Public Safety ‐ Fire DCO 580,000              300,000              ‐                       ‐                       ‐                       Berry Creek Drive Streets 2008 GO ‐                       ‐                       ‐                       ‐                       ‐                       5,550,000           2015 Road Bond Priority 1 ‐ Downtown Sidewalks Streets 2015 GO 1,000,000           1,000,000           1,000,000           1,000,000           ‐                       D.B . Wood (SH 29 to Oak Ridge) Streets 2015 GO 4,000,000           12,400,000        2,000,000           ‐                       ‐                       ‐                       Intersection Improvements Streets 2015 GO 1,800,000           1,200,000           ‐                       ‐                       ‐                       North East Inner Loop/Stadium Drive Streets 2015 GO ‐                       ‐                       ‐                       ‐                       ‐                       2,000,000           Preliminary Engineering Pool Streets 2015 GO ‐                       ‐                       ‐                       ‐                       ‐                       2,050,000           SH29 (Haven to SH130) Streets 2015 GO ‐                       ‐                       ‐                       ‐                       ‐                       4,100,000           Austin Avenue Bridges Streets CO ‐                       ‐                       7,000,000           17,843,278        18,431,500        18,927,400        21,347,500        18,584,000        137,858,000      Page 74 of 74