HomeMy WebLinkAboutHwy RM 2338 Water Line Permit 14-64-342APPROVAL
To: City of Georgetown
P. 0, BOx 409
Form 1082
PERMIT NO. 14-64-342
Control 2 103 Section 4
Hwy. No. RM 2338
1 lliamson County
Georgetown, Texas Date Decembef �3, 1964
The State Highway Department offers no objection to the location on the right-of-
way of your proposed 6" water line as shown by accompanying drawings and
notice dated Nov. 30 1964 except as noted below.
Your attention is directed to governing laws, especiallk to -,Article 6674w-1,
Vernon's Annotated Civil Statutes of Texas, pertaining to Control of Access.
Access for servicing this installation shall be limited to access via (a) frontage
roads where provided (b) nearby or adjacent public roads or streets, or (c) trails
along or near the highway right-of-way lines, connecting only to an intersicting
road; from any one or all of which entry may be made to the outer portion of the
highway right-of-way for normal service and maintenance operations. The Utility`"'
Owner's rights of access to the through -traffic roadways and ramps shall be sub-
ject to the same rules and regulations as apply to the general public except,
however, if an emergency situation occurs and usual means of access for normal
service operations will not permit the immediate action required by the Utility
Owner in making emergency repairs as required for the safety and welfare of the
public, the Utility Owner shall have a temporary right of access to and from the
through -traffic roadways and ramps as necessary to accomplish the required
emergency repairs, provided the State Highway Department is immediately notified
by-�he Utility Owner when such repairs are initiated and adequate provision is
made- byTthe Ut:r4ty Owner for convenience an* safetyr of highway traffic -:--;T
it ,pis exRrep sly yuideratood gthat,thor State Highway Department does not, purport,
hereby, to grant any right, claim, title, or easement in or upon this highway;
and it is further understood that the State Highway Department may require the
owner to relocate this line, subject to provisionsof governing laws, by giving
thirty (30) days written notice.
All work on the highway right-of-way shall be performed in accordance with Highway
Department instructions. The installation shall nW damage any, part of the highway
and adequate provisions must be made to cause minimum inconvenience to traffic and
adjacent property owners. Special specifications for placing this line are as
follows�or.attacheds
Please notify Erin p_ F3artz_Br.Mtnce-Formfwty-eight (48) hours prior to
starting construction of the line in order that we may have a representative present.
TEXAS HIGHWAY DEPARTMENT
By I �"r �,
District MWinee
,
(For installations on Interstate Highways, submit in triplicate to File D -18)M44
3\
Form 1082
NOTICE OF PROPOSED IN6TALLATION
UTILITY LINE ON CONTROLLED ACCESS HIGHWAY
Date 11-30-64
TO THE TEXAS STATE HIGHWAY COMMISSION
c/o DISTRICT ENGINEER
TEXAS HIGHWAY DEPARTMENT
Austin TEXAS -
Formal notice is hereby given that the City of Georgetown
Company, proposes to place awn water line within the right-of-
way of RM Highway No. 2338 in Williamson County,
Texas as followss
Connect to present water line at Hwy. Sta. # 772 / 10 and
continue within right of way of RM 2338 to Sta. # 758- 60.
This line will be placed on southwest ## side of road parallel
with ROW line.
The location and description of the proposed line and appurtenances is
more fully shown by Three copies of drawings attached to this
notice. The line will be constructed and maintained on the highway right-of-way
as directed by the State Highway Department in accordance with governing laws.
i date
Construction of this line will begin on or after the approvalAS
19—.
-- Texas
O
a
Form 1033
STATE HIGHWAY DEPARTMENT
Specifications for placing water, sewer, gas and
oil lines and conduit within the Rights-of-way or
crossing State and U. S. Highways,
1. All excavations within the right-of-way and not under surfacing shall be
backfilled by tamping in 6" horizontal layers or by ponding. -All surplus
material shall be removed from the right-of-way and the excavation finished
flush with surrounding natural ground.
2. Where sodding is disturbed by excavation or backfilling operations, such
areas shall be replaced by mulch sodding on all slopes of 2% or less. All
slopes over 2% shall be replaced by block sodding.
--
3. -Highway crossing under surfaced roads and under surfaced cross roads within --
the right-of-way shall be placed by boring. Boring shall extend from crown
line to crown line. All lines under highways carrying pressure shall be
enclosed in satisfactory casing extending from right-of-way line to right-
of-way line. Gravity flow sewer lines under highways shall be cast iron
pipe.
4. Where evidence is presented indicating the impracticability of boring or
tunnelling, the District Engineer of the Highway Department may grant per-
mission to cut the surfacing. In the event a cut is permitted the following
conditions will govern:
(a) Backfill material: All backfill material shall be stabilized with Port-
land Cement and mixed in a concrete mixer or transit mix equipment. If
soil is used it shall be sandy material free from lumps or clods, and
shall be stabilized with two sacks of cement per cubic yard of soil. If
sand and gravel are used, pit run material will be allowed, and it shall
be stabilized with one sack of cement per cubic yard. Backfill may be
mechanically tamped in a moist condition or water added to provide a free
flowing mixture.
(b) WHERE PAVEMENT IS FLEXIBLE BASE AND ASPHALT SURFACE
ASPHALT SURFACE FLEXIBLE BASE
OPEN TRENCH TO MINIMUM BACKFILL TRENCH TO SUR- REMOVE SURPLUS BACKFILL,
WIDTH NECESSARY FACE LEVEL, PENDING PLAC• PLACE BASE AND SURFACE
ING OF BASE AND SURFACE. . SAME AS OR EQUAL TO ORIG-
INAL BASE AND SURFACE.
K1i
(c) WHERE PAVEMENT IS CONCRETE OR CONCRETE BASE WITH OTHER SURFACE
REINFORCING STEEL
a
01
OPEN .TRENCH TO BACKFILL TRENCH
MINIMUM WIDTH NECES- TO SURFACE LEVEL
SARY. CUT STEEL PENDING PLACING
BARS ON ALTERNATE OF CONCRETE.,,
SIDES.
REMOVE SURPLUS
BACKFILL. RE-
MOVE AN EXTRA
1 FT. STRIP OF
CONCRETE ON
EACH SIDE.
0
PLACE 5 SACK
CONCRETE PATCH.
KEEP WET AND
BARRICADED FOR
48,HOURS.
5. Operations along highways shall be performed in such manner that all excavated
material be kept off the pavements at all times, as well as all operating
equipment.
6. Barricades and warning signs and flagmen when necessary shall be provided by
the contractor or owner.
7. One half of the traveled portion of the road must be open to traffic at all
times.