Loading...
HomeMy WebLinkAboutHwy RM 2338 Water Line Permit 14-64-342APPROVAL To: City of Georgetown P. 0, BOx 409 Form 1082 PERMIT NO. 14-64-342 Control 2 103 Section 4 Hwy. No. RM 2338 1 lliamson County Georgetown, Texas Date Decembef �3, 1964 The State Highway Department offers no objection to the location on the right-of- way of your proposed 6" water line as shown by accompanying drawings and notice dated Nov. 30 1964 except as noted below. Your attention is directed to governing laws, especiallk to -,Article 6674w-1, Vernon's Annotated Civil Statutes of Texas, pertaining to Control of Access. Access for servicing this installation shall be limited to access via (a) frontage roads where provided (b) nearby or adjacent public roads or streets, or (c) trails along or near the highway right-of-way lines, connecting only to an intersicting road; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Utility`"' Owner's rights of access to the through -traffic roadways and ramps shall be sub- ject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Owner in making emergency repairs as required for the safety and welfare of the public, the Utility Owner shall have a temporary right of access to and from the through -traffic roadways and ramps as necessary to accomplish the required emergency repairs, provided the State Highway Department is immediately notified by-�he Utility Owner when such repairs are initiated and adequate provision is made- byTthe Ut:r4ty Owner for convenience an* safetyr of highway traffic -:--;T it ,pis exRrep sly yuideratood gthat,thor State Highway Department does not, purport, hereby, to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the State Highway Department may require the owner to relocate this line, subject to provisionsof governing laws, by giving thirty (30) days written notice. All work on the highway right-of-way shall be performed in accordance with Highway Department instructions. The installation shall nW damage any, part of the highway and adequate provisions must be made to cause minimum inconvenience to traffic and adjacent property owners. Special specifications for placing this line are as follows�or.attacheds Please notify Erin p_ F3artz_Br.Mtnce-Formfwty-eight (48) hours prior to starting construction of the line in order that we may have a representative present. TEXAS HIGHWAY DEPARTMENT By I �"r �, District MWinee , (For installations on Interstate Highways, submit in triplicate to File D -18)M44 3\ Form 1082 NOTICE OF PROPOSED IN6TALLATION UTILITY LINE ON CONTROLLED ACCESS HIGHWAY Date 11-30-64 TO THE TEXAS STATE HIGHWAY COMMISSION c/o DISTRICT ENGINEER TEXAS HIGHWAY DEPARTMENT Austin TEXAS - Formal notice is hereby given that the City of Georgetown Company, proposes to place awn water line within the right-of- way of RM Highway No. 2338 in Williamson County, Texas as followss Connect to present water line at Hwy. Sta. # 772 / 10 and continue within right of way of RM 2338 to Sta. # 758- 60. This line will be placed on southwest ## side of road parallel with ROW line. The location and description of the proposed line and appurtenances is more fully shown by Three copies of drawings attached to this notice. The line will be constructed and maintained on the highway right-of-way as directed by the State Highway Department in accordance with governing laws. i date Construction of this line will begin on or after the approvalAS 19—. -- Texas O a Form 1033 STATE HIGHWAY DEPARTMENT Specifications for placing water, sewer, gas and oil lines and conduit within the Rights-of-way or crossing State and U. S. Highways, 1. All excavations within the right-of-way and not under surfacing shall be backfilled by tamping in 6" horizontal layers or by ponding. -All surplus material shall be removed from the right-of-way and the excavation finished flush with surrounding natural ground. 2. Where sodding is disturbed by excavation or backfilling operations, such areas shall be replaced by mulch sodding on all slopes of 2% or less. All slopes over 2% shall be replaced by block sodding. -- 3. -Highway crossing under surfaced roads and under surfaced cross roads within -- the right-of-way shall be placed by boring. Boring shall extend from crown line to crown line. All lines under highways carrying pressure shall be enclosed in satisfactory casing extending from right-of-way line to right- of-way line. Gravity flow sewer lines under highways shall be cast iron pipe. 4. Where evidence is presented indicating the impracticability of boring or tunnelling, the District Engineer of the Highway Department may grant per- mission to cut the surfacing. In the event a cut is permitted the following conditions will govern: (a) Backfill material: All backfill material shall be stabilized with Port- land Cement and mixed in a concrete mixer or transit mix equipment. If soil is used it shall be sandy material free from lumps or clods, and shall be stabilized with two sacks of cement per cubic yard of soil. If sand and gravel are used, pit run material will be allowed, and it shall be stabilized with one sack of cement per cubic yard. Backfill may be mechanically tamped in a moist condition or water added to provide a free flowing mixture. (b) WHERE PAVEMENT IS FLEXIBLE BASE AND ASPHALT SURFACE ASPHALT SURFACE FLEXIBLE BASE OPEN TRENCH TO MINIMUM BACKFILL TRENCH TO SUR- REMOVE SURPLUS BACKFILL, WIDTH NECESSARY FACE LEVEL, PENDING PLAC• PLACE BASE AND SURFACE ING OF BASE AND SURFACE. . SAME AS OR EQUAL TO ORIG- INAL BASE AND SURFACE. K1i (c) WHERE PAVEMENT IS CONCRETE OR CONCRETE BASE WITH OTHER SURFACE REINFORCING STEEL a 01 OPEN .TRENCH TO BACKFILL TRENCH MINIMUM WIDTH NECES- TO SURFACE LEVEL SARY. CUT STEEL PENDING PLACING BARS ON ALTERNATE OF CONCRETE.,, SIDES. REMOVE SURPLUS BACKFILL. RE- MOVE AN EXTRA 1 FT. STRIP OF CONCRETE ON EACH SIDE. 0 PLACE 5 SACK CONCRETE PATCH. KEEP WET AND BARRICADED FOR 48,HOURS. 5. Operations along highways shall be performed in such manner that all excavated material be kept off the pavements at all times, as well as all operating equipment. 6. Barricades and warning signs and flagmen when necessary shall be provided by the contractor or owner. 7. One half of the traveled portion of the road must be open to traffic at all times.