NOTICE OF PROPOSED INSTALLATION
PIPE LINES
Permit No. w-73-262
Date May 3, 1973
TO THE TEXAS STATE HIGHWAY COMMISSION
c/o DISTRICT ENGINEER
TEXAS HIGHWAY DEPARTMENT
TEXAS
Formal notice 'is hereby given that. _ HAWW_City of Georgetown
# proposes to place a 8" 01 Mauer pipe line within the
Road
right -of --way of 'Z9_2338 Highway No. in 1ii111awson
County, ' Testas as -follows: 719 • 54
Qonneot to pvesent 8" nater line on private Pr0PastV, anter FK 2338 at station HOH
ran parallel 5' fibro east right-of-vs7y line to station 703 + 88-
31 drpth- asinie AR eioveirago 21
The location and description of the proposed line and appurtenances
is more fully shown by ?hrW___ copies of drawings attached to this
notice. The line will be constructed and maintained on.the highway right-
of-way as directed by the State Highway Department in accordance with
governing laws.
Construction of this line will begin on or after the Tth __ day
• 19 73 /
Firm_'
�� -- .=►►
)10
Form 10328
APPROVAL (.5-15-69).
Control 142114ection 1
Hwy. No. P'M 2338 ------
City of Georgetown Dat i, -n ----County
To
""�M%mlywiva P. 0. Boot 409
Georgetown, Texas 78626
The State Highway Department offers no objection to the location on the
right-of-way of your proposed 8" CI water•
ac-
companying drawings and notice dated line as shown by noted below. except as
.It is expressly understood that the State Highway Department does not pur-
port, hereby, to grant any right, claim, title, or easement in or upon this `
highwayl and it is furtherunderstood that the State Highway Department may
require the owner to relocate this line,,subject to provisions of governing
laws, by giving thirty (30) days written notice.
All work on the highway right-of-way shall be performed in accordance with
Highway'Department-'instructions. The installation shall not damage any
part of,, the highways,.andadequate. provisions, must be made to cause minimum
inconvenience to traffic and adjacent pro ert owners.
Owne;;..fails to comply with the -re p y In the event the
gt4irements -as pet forth herein, the 'State
may take such action as it deems appropriate to compel compliance.
Please comply With attached Form 1033.
Serio F. Barts, Htnoe. Const. Supv.
Please notify !. 0. Box 136, 4eorgetown, Texas 78626
g�j+2 forty-eight (48) _hours prior
to starting construction of the line, in order that we may have a represen-
tative present..
TE HIGHWAY DEPARTMENT
By: 4ineer-Distri6t_No.,
D s ict E
- Form 1033
STATE HIGHWAY DEPARTMENT
Specifications for placing water, sewer, gas and
oil lines and conduit within the .tights -of -way or
crossing State and U. S. Highways
1. All excavations within the right-of-way and not under surfacing shall be
backfilled by tamping in 6" horizontal layers or by ponding... All surplus
material shall be removed from the right-of-way and.the.excavation finished
flush with surrounding natural ground.
2. Where sodding -is disturbed by excavation«or`backfilling operations,"siuch
areas shall be replaced by mulch sodding on all slopes of 2%i or less. All
slopes over' 2
p % shall be replaced by'block sodding...
3. Highway crossing under surfaced roads' and under surfaced cross roads within
the right-of-way shall be placed by boring. Boring shall extend from crown
line to crown line.- All lines under highways carrying pressure shall be
enclosed in satisfactory casing extending from right-of-way line to right-
of-way line. Gravity flow 'sewer 'lines "under highways shall be cast iron
pipe.
4. Where evidence is presented indicating the impracticability of boring or
tunnelling, -the District Engineer of the Highway Department may grant per-
mission to cut the surfacing. In the event a cut is permitted the following
conditions will govern:
(a) Backfill material:,- All backfill material shall be stabilized with Port-
land Cement and mixed in a concrete mixer or transit mix equipment. If
soil is used it shall be sandy material free from lumps or clods, and
shall be stabilized with two sacks of cement per cubic yard of soil. If
sand and gravel are used, pit run material will be allowed, and it shall
be stabilized with one sack of cement per cubic yard_ Backfill may be
-ichanically tamped in a moist condition or water added to provide a free
.owing
(b) WHERE PAVEMENT IS FLEXIBLE BASE AND ASPHALT SURFACE
rASPHALT SURFACE ;,. `; ,";. (FLEXIBLE BASE
• e
OPEN TRENCH Mn MINIMUM BACKFILL TRENCH TO SUR- REMOVE SURPLUS BACKFILL,
WIDTH NECESSARY FACE LEVELS PENDING PLAC- PLACE BASE AND SURFACE
ING.OF BASF AND SURFACE;SAME AS OR EQUAL TO ORIG-
. c.< _ INAL BASE AND SURFACE.
(c) WHERE PAVEMENT IS CONCRETE OR CONCRETE BASE WITH OTHER SURFACE
REINFORCING STEEL
OPEN TRENCH TO BACKFILL TRENCH FEWVE SURPLUS PLACE•5 SACK
MINIMJM WIDTH NECES- TO SURFACE LEVEL BACKFILL. RE- CONCRETE PATCH.
SARY. CUT STEEL PENDING PLACING MOVE AN EXTRA KEEP WET AND
BARS ON ALTERNATE OF CONCRETE. 1 FT. STRIP OF BARRICADED FOR
SIDES. CONCRETE ON 48 HOURS.
EACH SIDE.
5. Operations along highways shall be performed in such manner that all excavated
material be kept off the pavements at all times, as well as all operating
equipment.
6. Barricades and warning signs and flagmen when necessary shall be provided by
the contractor or owner.
7. One half of the traveled portion of the road must be open to traffic at all
times.