Loading...
HomeMy WebLinkAboutAgenda CC 07.26.2016Notice of M eeting of the Governing B ody of the City of Georgetown, Texas J uly 26 , 20 16 The Ge orgetown City Council will meet on July 2 6, 2 016 at 6:00 PM at Council Chambers, 101 E. 7th St., Geo rge to wn, Texas The City o f Georgetown is committed to co mpliance with the Americans with Disabilities Act (ADA). If you re quire assistance in participating at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or ac c ommo datio ns will be provided upo n request. P lease contact the City Se c retary's Office, at least three (3 ) days prio r to the scheduled meeting date, at (512) 930- 3652 o r City Hall at 113 East 8th Street fo r additional information; TTY use rs ro ute through Relay Texas at 7 11. Re gular Se ssion (This Regular Sessio n may, at any time, be re cessed to convene an Executive Se ssio n for any purpose authorize d by the Open Meetings Act, Texas Go vernment Code 551.) A Cal l to Order Invocati o n P l e dg e of Al l egi ance Co mments from the Mayor - Re d P oppy Festival Awards from the Texas Festival & Events Asso c iation Ci ty Co unci l Regi onal Board Re po r ts Announcements - Summer Fan Drive - Music on the Square Summer Co nc e rts - Sunset Mo vie at Fire Station 5 - Founders P ark Open House Ac ti on fro m Executi ve Sessi on Statutory Conse nt Age nda The Statuto ry Co nsent Agenda includes no n-c ontroversial and routine items that may be acted upon with one single vote. An item may be pulled from the Consent Agenda in order that it be discussed and acted upon individually as part of the Regular Agenda. B Consideration and possible action to appro ve the mi nutes of the Wo rksho p and Regular Meeting held on Tuesday, July 12, 2016 and the Special Workshop Meeting held July 13 , 2016 -- Shelley No wling, City Secretary Page 1 of 247 C Consideration and possible action to appoi nt Counci l member Anna Eby to the Capi tal Area Co unci l of G overnments (CAP COG ) Cl ean Ai r Coal i ti on -- Mayo r Dale Ro ss D Consideration and possible action to authorize an application for a Capi tal Area Counci l of G o ve rnments (CAPCOG ) FY 20 16 /1 7 Reg i onal Ai r Qual i ty G rant for addi ti onal sol ar pow e red trash and recycl i ng compactors -- Mike Babin, Deputy General Manager, Utilities E Consideration and possible action to appro ve a Resolution authorizing the vacati on and abandonment of a 0.037-acre portio n of an existing 10-foot P ubl i c Uti l i ty Easement out of Lot 3 , B l ock A, Park Meadow Secti o n Tw o , a subdivision of reco rd in Cabinet F, Slide 387, Plat Reco rds of Williamson County, Te xas, and to authorize the Mayor to execute a quitclaim deed -- Travis Baird, Real Estate Services Co ordinator F F orw arded from G eorgetow n Uti l i ty Systems Advi sory B oard (G US): Consideration and possible action to appro ve a bid award to mul ti pl e bi dders fo r Water and Wastew ater Treatment Pl ant che mi cal s, at unit costs for a perio d of up to 5 years – Glenn W. Disho ng, Utility Director G F orw arded from G eorgetow n Uti l i ty Systems Advi sory B oard (G US): Consideration and possible action to appro ve a bid award to Sheri dan Envi ro nmental for sl udge and bi o-sol i ds transport and di spo sal servi ces, at unit costs for a pe rio d of up to 5 years - Gle nn W. Dishong, Utility Directo r H F orw arded from the G eorgetow n Transpo rtati on Advi sory Board (G TAB ): Consideration and possible action to award the annual bi d for G rade #4 and #5 chi p seal trap ro c k o rdered and delivered on an as needed basis to Vul can Constr ucti o n Materi al s LLC of San Antonio Tx. in the estimated amo unt o f $1 26,603.00 -- Edward G. P olasek, AICP, Transpo rtation Services Director Le gislative Re gular Age nda I Consideration and possible action to ado pt the proposed 2017 prope r ty tax rate on a future age nda and to set dates for tw o publ i c heari ngs -- Leigh Wallace , Finance Director J F orw arded from the Conventi o n & Vi si tors B ureau B oard Consideration and possible action to appro ve a contract for sponso r shi p o f The Daytri pper w i th Chet G arner, a Georgetown based business, in the amount of $60 ,00 0.0 0 -- Cari Miller, To urism Manager K P ubl i c Heari ng and Fi rst Readi ng of an Ordinance to rezone approximately 2.3 acres in the Lewis J. Dyches Survey, located at 4 Si erra Way Street, from the Agriculture (AG) District to the Industrial (IN) District -- Sofia Nelso n, CNU-A, P lanning Director (acti o n requi red) L Se c ond Readi ng of an Ordinance to rezo ne 6 7.864 acres of the William Addiso n Survey located at 8 01 Carl so n Cove from the Agriculture (AG) District to the Re side ntial Single-Family (RS) District -- So fia Nelson, CNU-A, P lanning Director (acti on requi red) M Se c ond Readi ng of an Ordinance to rezo ne approximately 13.788 ac r e s o f the Joseph Thompso n Survey located at 3300 F M 22 43 on the north side of FM 22 43 (Leander Road), between County Road 176 and Weir Ranch Ro ad from the Agriculture (AG) District to the Re sidential Estate (RE) District -- Sofia Nelso n, CNU-A, Planning Director (acti on requi red) N Se c ond Readi ng of an Ordinance to rezo ne approximately 13.24 acres in the Jo seph Fish Survey, lo cated at 4700 Wi l l i ams Dr i ve, from the Local Commercial (C-1 ) and Office (OF) Districts to 9 .99 acres of the High De nsity Multifamily (MF-2) District and 3 .25 6 acres of the Lo w Density Multifamily (MF-1) District -- Sofia Nelson, CNU-A, Planning Director (acti on requi red) Proje ct Update s O Pro ject updates and status reports regarding current and future transportatio n and traffic project; street, sidewalk, and other infrastructure projects; police, fire and othe r public safety projects; eco nomic development projects; city facility projects;downtown proje c ts including parking enhancements,city lease agreements, and possible direction to city staff -- David Morgan, City Manager Page 2 of 247 Blue Hole Response Public Wishing to Addre ss Council On a subje c t that is posted on this agenda: Ple ase fill out a speaker registratio n form which can be found on the table at the entrance to the Council Chamber. Clearly print your name and the letter of the item on whic h you wish to speak and present it to the City Secretary on the dais, preferably prior to the start of the me e ting. You will be called forward to speak when the Council conside rs that item. On a subje c t no t po sted on the agenda: P e rso ns may add an item to a future City Co uncil agenda by contac ting the City Secretary no later than noo n on the Wednesday prior to the Tuesday meeting, with the subje c t matter o f the topic they would like to address and their name. The City Secretary can be reache d at 51 2/93 0-3651. P - At the time of posting, no persons had signed up to address the City Council Exe cutive Se ssion In compliance with the Open Meetings Ac t, Chapter 551, Government Co de , Verno n's Texas Codes, Annotate d, the items listed below will be discussed in closed session and are subject to action in the regular se ssio n. Q Se c . 55 1.0 71 : Consul tati on wi th Atto rney - Advice fro m attorney about pending or co ntemplated litigation and o ther matters on which the attorney has a duty to advise the City Co uncil, including agenda items - Public Safety Operations and Training Facility - ADG Settlement Se c . 55 1.0 72 : Del i berati on Regardi ng Real Property - City Lease Agreements Se c . 55 1.0 74 : Personnel Matter s - City Manager, City Attorney, City Se c retary and Municipal Judge: Consideration of the appointment, employment, evaluatio n, reassignment, duties, discipline, o r dismissal - City Manager Evaluation Adjournme nt Ce rtificate of Posting I, Shelley No wling, City S ecretary for the C ity of Geo rgeto wn, Texas , do hereby c ertify that this Notic e o f Meeting was posted at City Hall, 113 E. 8th Street, a p lac e read ily acc es s ib le to the general pub lic at all times , o n the _____ day of _________________, 2016, at __________, and remained so p o s ted for at leas t 72 c o ntinuo us ho urs p receding the s cheduled time of s aid meeting. __________________________________ Shelley No wling, City S ecretary Page 3 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Cal l to Order Invocati on Pl edge of Al l e gi anc e Comments fro m the Mayo r - Red Poppy Fe stival Awards from the Texas Festival & Events Association Ci ty Counci l Re gi o nal Bo ard Reports Announcements - Summer Fan Drive - Music on the Square Summer Concerts - Sunset Movie at Fire Statio n 5 - Founders Park Open Ho use Acti on from Executi ve Sessi on ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Page 4 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Consideration and possible action to approve the mi nutes o f the Workshop and Re gular Meeting held on Tuesday, July 12, 2016 and the Spe cial Workshop Meeting held July 13 , 20 16 -- Shelley Nowling, City Secretary ITEM SUMMARY: FINANCIAL IMPACT: NA SUBMITTED BY: ATTACHMENT S: Description Regular Meeting Minutes 7.12.2016 Works hop Meeting Minutes 7.12.2016 S p ecial Meeting Works hop Minutes 7.13.2016 Page 5 of 247 The Georgetown City Council will meet on Tuesday, July 12, 2016 at 6:00 PM at the Council Chambers at 101 E. 7th St., Georgetown, Texas The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require assistance in participating at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City Secretary’s Office, at least four (4) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 113 East 8th Street for additional information; TTY users route through Relay Texas at 711. Mayor Ross called the meeting to order at 6:00 PM. All Councilmembers were present. Regular Session (This Regular session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order Invocation Pledge of Allegiance Comments from the Mayor - National Parks and Recreation Month Proclamation - National Breastfeeding Month Proclamation City Council Regional Board Reports Announcements - Summer Fan Drive - Music on the Square Summer Concerts - Sunset Movie at Fire Station 5 Action from Executive Session Motion by Fought, second by Hesser to authorize the proposed settlement of Stephanie Hoskins Brown v. City of Georgetown, Texas et al, Cause No. 13-1178-C277 on the terms discussed in Executive Session and to authorize the Mayor to sign a Settlement Agreement consistent with those terms. Approved: 7-0 Statutory Consent Agenda The Statutory Consent Agenda includes non-controversial and routine items that may be acted upon with one single vote. An item may be pulled from the Consent Agenda in order that it be discussed and acted upon individually as part of the Regular Agenda. B. Consideration and possible action to approve the minutes of the Workshop and Regular Meeting held on Tuesday, June 28, 2016 -- Shelley Nowling, City Secretary C. Forwarded from the Georgetown Village Public Improvement District Advisory Board: Consideration and possible action to approve landscaping services in the roundabout areas of Georgetown Village to Integrated Environment for a total of $88,622.44 -- Jim Briggs, General Manager of Utilities D. Forwarded from the General Government and Finance Advisory Board (GGAF): Consideration and possible action to approve the contract renewal for licensed electrician services to Mercury Electric Company of Liberty Hill, TX for an estimated annual amount of $150,000.00 -- Trish Long, Facilities Superintendent E. Forwarded from the General Government and Finance Advisory Board (GGAF): Minutes of a Meeting of the Governing Body of the City of Georgetown, Texas Tuesday, July 12, 2016 Page 6 of 247 Consideration and possible action to approve the purchase and installation of artificial turf from Paragon Sports Constructors (PCS) in an amount not to exceed $137,500.00 to be installed at the Public Safety Operations & Training Center -- Wayne F. Nero, Chief of Police F. Forwarded from the General Government and Finance Advisory Board (GGAF): Consideration and possible action to approve a Resolution giving Michel Sorrell, Controller, the approval to conduct business with various banking institutions and to appoint her as a “Representative of the Depositor” -- Leigh Wallace, Finance Director G. Forwarded from the General Government and Finance Advisory Board (GGAF): Consideration and possible action to approve a contract with Environmental Systems Research Institute (ESRI) to provide geographic information systems (GIS) software to the City of Georgetown for a total of $115,111.50 over three years -- Greg Berglund, Assistant IT Director H. Forwarded from the General Government and Finance Advisory Board (GGAF): Consideration and possible action to approve the Design/Build contract (cost of the work plus design-builder’s fee) with a guaranteed maximum price agreement with G. Creek Construction of Austin, Texas for the Restoration of Grace Heritage Center -- Eric Johnson, CIP Manager Motion by Brainard, second by Hesser to approve the Statutory Consent Agenda in its entirety. Approved: 7-0 Legislative Regular Agenda I. Consideration and possible action to support Faith in Action's Application and authorize Mayor Dale Ross to sign a letter of support for Federal Transit Administration (FTA) 5310 Grant Funding for FY17 to the Capital Area Metropolitan Planning Organization (CAMPO) -- Nat W aggoner, Transportation Analyst, AICP, PMP Nat Waggoner, the City’s Transportation Analyst, provided information to the Council regarding the application from Faith in Action for Federal Transit Administration (FTA) 5310 Grant Funding. He explained their need for a letter of support from the City to the Capital Area Metropolitan Planning Organization (CAMPO). Vicki Orcutt, the Director of Faith in Action, joined the discussion. She further explained the Letter of Support. She said that this type of funding for organizations like Faith in Action exceeds what can done as a City. Faith is Action will be seeking monies for further grant funds. Orcutt explained how cities need to partner with non-profits in these type of credits. She clarified that local municipalities can request these funds and that through the City support, Faith in Action could secure over $100,000 in additional funding. Orcutt said 5,500 rides were provided to seniors in Georgetown in 2015. She explained that the need is there and Faith in Action would like to expand hours of operation with this funding. Orcutt said they would be able to have full time operations instead of the current part time operations. Faith in Action has provided rides in Georgetown for over 15 years. Waggoner read the caption. Motion by Fought, second by Hesser to approve Item I. Fought thanked Orcutt and Waggoner and said this is exactly the type of thing the City should be supporting. He added that it fits the needs of the seniors in the City perfectly and is a proven success. Jonrowe thanked Orcutt and asked her to clarify what is meant by 508 clients and how that would change with this funding. Orcutt said Faith in Action would be able to continue to enroll clients and continue to seek volunteers. Jonrowe asked about the process. Orcutt said that the client is given a brief screening. The client must be 65 or older and reside in Georgetown or the ETJ. She explained the criteria regarding individuals needing to reside in their own home. Individuals in assisted or independent living facilities would have access to the transportation provided by those facilities. Faith in Action fills the gap of those who need transportation. Orcutt said clients are also screened for mobility. She explained that mobility is an issue to ensure safety and so it is required that the Individual can get in and out of a vehicle. Jonrowe asked how many drivers work with Faith in Action. Orcutt said there are currently 50 drivers. She explained that drivers fill out an application and are subjected to a background and criminal record check. Drivers are screened for their driving records and are required to provide character witnesses. Approved: 7-0 J. Public Hearing and First Reading of an Ordinance to Rezone 67.864 acres of the William Addison Survey, located at 801 Carlson Cove, from the Agriculture (AG) District to the Residential Single-Family (RS) District -- Sofia Nelson, CNU-A, Planning Director (action required) Page 7 of 247 Sofia Nelson, the City’s Planning Director spoke on the rezoning request. She provided a map and described the property. Nelson showed and described two access points and said the developer is working on getting a third access point. Nelson showed the zoning map and the future land use map. Nelson explained Residential Single Family Zoning (RS) • Intended for medium density residential single family with minimum lot size of 5,500 square feet • Development Standards include a minimum lot size of 5,500 sq. ft., minimum lot width 45 ft., maximum height 35 ft., front setback 20 ft., side setback 5, rear setback 10 and maximum IC 45% Nelson discussed the criteria for rezoning and said all criteria were consistent with policy for this project. Nelson said that both the Planning & Zoning Commission and staff recommend approval. She then read the caption. Mayor Ross opened the public hearing at 6.27 pm. Ercel Brashear spoke representing the property owners. He explained that the owners no longer wished to farm and will be selling a portion of their property. Brashear said that the owners had selected a good quality developer and are pleased with the staff recommendation. Mayor Ross closed the Public Hearing at 6.30 PM Motion by Gonzalez, second by Hesser to approve Item J. Approved: 7-0 K. Public Hearing and First Reading of an Ordinance Rezoning 13.788 acres of the Joseph Thompson Survey located at 3300 FM 2243 on the north side of FM 2243 (Leander Road), between County Road 176 and Weir Ranch Road from the Agriculture (AG) District to the Residential Estate (RE) District -- Sofia Nelson, CNU-A, Planning Director (action required) Sofia Nelson, the City’s Planning Director, spoke on the rezoning request. She showed the location map and described the property. She explained that the property is near the western boundary of the City, some of the property within the City, but most of the property is in the ETJ. Nelson said the portion inside City limits is approximately 13 acres. Nelson explained the Residential Estate zoning (RE). • Intended for low density single family residential • Development Standards include a minimum lot size of 1 acre, minimum lot width 100 ft., maximum height 35 ft., front setback 25 ft., side setback 10, rear setback 20 and maximum IC 40% Nelson discussed the criteria for rezoning and all criteria were consistent with policy. Nelson said that both the Planning & Zoning Commission and staff recommend approval. She then read the caption. Mayor Ross opened the Public Hearing at 6.31 PM. No persons were signed up to speak on the item and the Public Hearing was closed at 6.31 PM. Nelson read the caption. Motion by Brainard, second by Gipson to approve Item K. Approved: 7-0 L. Forwarded from the Housing Advisory Board: Consideration and possible action to approve a Resolution of Support for 4% Housing Tax Credits and a Two Times Resolution for the renovation of the Oaks at Georgetown Apartments, located at 550 22nd Street -- Jennifer C. Bills, AICP, LEED AP, Housing Coordinator Jennifer Bills, the City’s Housing Coordinator, spoke on the request for support for 4% housing tax credits and a two times resolution for the renovation of the already existing apartments, the Oaks at Georgetown, located at 550 22nd Street. Bills provided a brief presentation. She explained that this was a non-competitive process. Bills explained that the applicant is required to obtain the 2x resolution for support and will need this in order to provide the renovations. Bills said that this has no impact on the City Budget. Bills spoke on the property background. The property was built in 1997 with housing tax credits and was the first HTC new construction project in Georgetown. The original builder and owner, Highridge Costa Housing Partners, will continue to own and manage the property after the renovations. Bills provided Site Information and Site Pictures • 10,532 acres • 192 total units – 48 one bed/one bath, 64 two bed/two bath and 80 three bed/two bath Page 8 of 247 • Onsite management Bills said the improvements planned would include appliances, water heaters and new heating and air conditioning. She then showed the Scope of the Work: • $15,000 per unit • New energy efficient appliance • Energy-star hot water heaters • Energy-star insulation products and windows • Water-efficient irrigation • Bicycle parking for residents • American with Disabilities site improvements Mayor Ross called on Mr. Walt Doering, who had signed up to speak on Item L. Doering asked the Council for their support in preserving a deserving rental property. He spoke on the quality of life for the residents of the property. Councilmember Fought said the City must support this request. He said the Housing already exists and must be maintained. Motion by Jonrowe, second by Gipson to approve Item L. Approved: 7-0 M. Second Reading of an Ordinance for a Special Use Permit to allow a multifamily development in the Local Commercial (C-1) District on a 7.366 acre site being Lot 2 of Wesleyan at Estrella subdivision, located at 4121 Williams Drive -- Sofia Nelson, CNU-A, Planning Director (action required) Councilmember Gipson recused himself from Item M and filed a Conflict of Interest form with the City Secretary. Sofia Nelson, the City’s Planning Director, spoke on the request for a Special Use Permit in the Wesleyan at Estrella subdivision. She provided a location map, zoning map and future land use map for the property. She also provided a conceptual site layout. Nelson said the Special Use permit request was to build 108 multifamily units on a platted 7 acre property. Nelson displayed the Special Use Permit Approval Criteria: Page 9 of 247 Nelson next displayed the Residential Use Limitations in C-1: Nelson said that the Planning and Zoning Commission recommends approval and read the caption. Motion by Jonrowe, second by Eby to approve Item M. Fought proposed a motion to delay the item for further staff clarification. Motion died for lack of a second. Approved: 5-1 (Fought opposed, Gipson recused) N. Consideration and possible action to approve a Resolution supporting the Williamson County and Cities Health District in processing requests for a variance from the Texas Food Establishment Rules pertaining to live animals in food establishments to give food establishment owners the option to allow dogs in outdoor dining areas -- Andreina Dávila-Quintero, Project Coordinator Andreina Davila-Quintero, a Project Coordinator for the City, spoke on a request for a variance from the Williamson County and Cities Health District to allow the City of Georgetown food establishment owners to have the option to allow dogs in their outdoor dining areas. She explained that the Council had directed staff to draft the resolution. Davila-Quintero said the variance is initiated by food establishment owners and reviewed and monitored by the Health District. She described the restrictions and prohibited uses and then read the caption. Motion by Brainard, second by Eby to approve Item N. Brainard said this is not about dogs, but about freedom for restaurant owners and freedom of customers to eat or not eat at a restaurant of their choice. Mayor Ross called on Mr. Jeff Barrett, who had signed up to speak on Item N. Mr. Barrett encouraged Council to approve. He explained that there is a potential revenue loss because of the lack of dog friendly restaurants in Georgetown. Barrett said there is an increasing amount of dogs in Georgetown at festivals and events. Barrett said it is about choice and restaurant owners and customers should have a choice. Page 10 of 247 Gipson said he is struggling with this. He explained that he is a dog lover but does not want a dog next to him at a restaurant. He agrees with the freedom of choice, but pointed out the many great parks in Georgetown open to animals. Fought said he agrees and does not want to be blindsided by dog at a restaurant. Fought said it is not safe and clean. Fought added that restaurant owners would feel that they would need to comply. Hesser said he agrees and, although he loves dogs, he does not think you should push your dog on others. Brainard said it would not happen that someone would be blindsided by a dog. He explained that there would be signage and each person would have the choice to choose a restaurant for dining. Failed: 3-4 (Hesser, Fought, Gipson, Gonzalez opposed) O. Discussion and possible action to address recent crowd-related issues at Blue Hole Park -- Rachael Jonrowe, Councilmember District 6 Councilmember Jonrowe spoke on traffic issues at Blue Hole Park and provided images of the congestion. She showed pictures she had taken of the Blue Hole parking and crowding. She explained that very large crowds started last summer after the record rainfall. She said she has observed trash everywhere, including dirty diapers, cigarette butts and broken bottles. Jonrowe expressed concern for fires with people grilling food beneath trees. She said there is a problem with tents, floating coolers and crowded sidewalks and walkways. Motion by Jonrowe, second by Eby to ask staff to address the overcrowding at Blue Hole, including but not limited to, working with county representatives and staff to plan and implement parking signage, as soon as possible, to encourage off-hours use of the county parking garage; explore the feasibility of possible No Parking Areas along Scenic Drive and enforcing no parking areas already in existence in order to address visibility issues; to approve the creation of at least two, highly visible signs at either end of Blue Hole Park, which clearly states Park Rules; to approve funding for more permanent trash cans; to consider implementing Park Rules related to glass containers, alcohol, smoking, grilling on person grills, the erection of personal tents and shelters, dogs on leashes at all times and any other rules that might be suggested; to instruct staff to work on an education and enforcement campaign to ensure compliance with any existing or new rules. Persons signed up to speak on Item O included J.J. Parker, Steve Koran, Kim Volk and Paulette Taylor. Comments and Concerns voiced included: Blue Hole is a gem of the City For those who work and play in Georgetown, this is wonderful Need for increased trash collection and signage People should be able to use tents Should encourage shade structures People get along and have a great time at Blue Hole Place getting trashed out Cars parked illegally No tents or barbeques should be allowed on the sidewalk Should not allow cigarettes Should have more of a police presence Heartwarming watching people enjoy Blue Hole Should be more trash receptacles Dogs should be allowed to be free without leashes Need to be more lenient Blue Hole was the only swimming hole for blacks in the 1960s Nice to see a lot of people Crowd impact is hard on Sunday church People cannot get out of driveway because of trash or barbecues Parking solutions have not been followed Permits for people residing in homes Fourth Street is a particular problem Justice Building jurors cannot find parking Justice Building needs more signage. Need to be considerate of neighborhood Mayor Ross suggested that the City Manager, David Morgan, should take this issue as an operations matter to be handled and resolved by staff. Morgan said this is a good problem to have. Blue Hole is a great spot in Georgetown. Georgetown is happy to be a Destination location. Morgan said that a number of nuisance issues have been identified and are being worked on. Morgan said the police presence will increase with both visible police as well as undercover officers. Morgan explained that staff is working on the resolution of the proper number of trash receptacles. Morgan Page 11 of 247 agrees that there can and should be more improvement. He said he has spoken to Williamson County Commissioner Covey regarding better signage to the parking garage. Morgan said he will instruct staff to look at making unique rules. He said tents and barbeques will be a challenge and staff will need Council direction in these matters. Motion by Fought, second by Hesser, to postpone the original motion and second by Jonrowe and Eby, respectively, and allow City Manager, Morgan and staff the opportunity to improve on the mentioned issues with Blue Hole Park and come back with recommendations to the City Council. Approved: 7-0 Project Updates P. Project updates and status reports regarding current and future transportation and traffic project; street, sidewalk, and other infrastructure projects; police, fire and other public safety projects; economic development projects; city facility projects; and downtown projects including parking enhancements and possible direction to city staff -- David Morgan, City Manager Mayor Ross asked City Manager, David Morgan, if he had any project updates to share. Morgan answered that he did not at this time. Public Wishing to Address Council On a subject that is posted on this agenda: Please fill out a speaker registration form which can be found on the table at the entrance to the Council Chamber. Clearly print your name and the letter of the item on which you wish to speak and present it to the City Secretary on the dais, preferably prior to the start of the meeting. You will be called forward to speak when the Council considers that item. On a subject not posted on the agenda: Persons may add an item to a future City Council agenda by contacting the City Secretary no later than noon on the Wednesday prior to the Tuesday meeting, with the subject matter of the topic they would like to address and their name. The City Secretary can be reached at 512/930-3651. Q. - At the time of posting, no persons had signed up to address the City Council Executive Session In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon’s Texas Codes, Annotated, the items listed below will be discussed in closed session and are subject to action in the regular session. R. Sec. 551.071: Consultation with Attorney - Advice from attorney about pending or contemplated litigation and other matters on which the attorney has a duty to advise the City Council, including agenda items - Hoskins/Brown Update and Possible Action Sec. 551.074: Personnel Matters - City Manager, City Attorney, City Secretary and Municipal Judge: Consideration of the appointment, employment, evaluation, reassignment, duties, discipline, or dismissal Sec. 551.086: Competitive Matters - Solar RFP Adjournment Motion by Hesser, second by Fought to adjourn the meeting. Mayor Ross adjourned the meeting at 7.05 PM. ____________________________________________________________________________________________________ Approved by the Georgetown City Council on _____________________________ Date ____________________________ __________________________ Dale Ross, Mayor Attest: City Secretary Page 12 of 247 Minutes of a Meeting of the Governing Body of the City of Georgetown, Texas Tuesday, July 12, 2016 The Georgetown City Council will meet on Tuesday, July 12, 2016 at 2:00 PM at the Council Chambers, at 101 E. 7th St., Georgetown, Texas The city of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require assistance in participating at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City Secretary’s Office, at least four (4) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 113 East 8th Street for additional information; TTY users route through Relay Texas at 711. Mayor Ross called the meeting to order at 2:00 PM. All Councilmembers were in attendance with the exception of Anna Eby, Councilmember District 1 and Ty Gipson, Councilmember, District 5. Eby arrived at 2:05 PM and Gipson arrived at 2.20 PM. Policy Development/Review Workshop – Call to order at 2:00 PM A. Workshop overview, discussion and possible action regarding the FY2017 City of Georgetown Budget and Tax Rate -- David Morgan, City Manager David Morgan began the budget overview. He explained the process in which the budget will be presented and showed a Power Point presentation starting with the General Fund. The budget workshop overview will be continued the following day from 2pm to 5 pm. Morgan said final adoption of the budget is planned for September 13, 2016. He said the budget presentation involved many staff members working as a team. Morgan said this year brought many fresh faces which bring new ideas and bright minds, as well as challenges because of unfamiliarity with the process. Morgan said he was very grateful for the outstanding budget process team and recognized staff members Leigh Wallace, Paul Diaz, Laurie Brewer, Jim Briggs, Nathan Parras, Jonathan Sandoval, Jacob Brachman, Michel Sorrel, Kara McSwiggin, Debbie Mitchell, Tristan Whitmire, LaMar Kemp, Kris Jolly, Jack Daly, Becky Huff, Shirley Rinn, Danella Elliott and Michael Weisner and Chris Foster from Utilities. Morgan explained that the presentation today would begin with the General Fund, followed by Special Revenue Funds. Morgan said the budget presentation would continue the following day. Mayor Ross said the workshop is the time for the Council to ask questions. He emphasized that the process does not work well if questions are asked much later. He explained that it is necessary to make a list of concerns that can be noted and dealt with along the way. Morgan agreed that it is important to get information from Council to staff as early as possible in order to make necessary adjustments. He added that staff is greatly appreciative of feedback. Morgan showed the budget process as described in the City Charter. Page 13 of 247 He next described the budget process to date: Morgan explained that the proposed budget is a work in progress. He said that staff continues to review revenue estimates and expenditure requests. He explained that it is important for the Council to see the elements that bring the budget together and that is why it is presented at this time through the workshop meetings. Morgan said a proposed budget is getting close to completion but cannot be finally proposed until the City receives the tax rolls from the Williamson County Appraisal District, expected to be received on July 20, 2016. Morgan displayed and explained Georgetown’s Budgeted Funds and the fund system of accounting. Page 14 of 247 Morgan Showed the Agenda for July 12, 2016 and July 13, 2016: He next showed and spoke on the Budget Theme Morgan said that much of the budget is a response to the issues of growth. Morgan said the growth rate is at 7.8% and is not anticipated to slow down anytime soon. He then showed the Development Pipeline Map. Page 15 of 247 Morgan spoke next on the Built Environment - Residential Morgan spoke on Development Requests from 2012 through 2015 Areas of Focus were presented by Morgan: • Assuring Quality Growth • Continued Increase in Maintenance of Existing Assets • Implement Voter Approved Bond Projects and Limit Tax Rate Impact • Award Winning Downtown and Parks – Maintain Quality of Life and Small Town Charm • Plan for Next Phases of Growth Morgan said it was important to be responsive to the established Council Goals when proposing the budget: Page 16 of 247 Morgan spoke next on the Proposed Budget Impact – Council Goals Page 17 of 247 Morgan spoke on the importance of continuing key initiatives. Page 18 of 247 Morgan began the presentation of the General Fund. He started with the General Fund FY2016 Projections. Sales Tax Revenue was shown next. Morgan displayed and discussed the Year End 2016 General Fund. Page 19 of 247 Morgan spoke on where the money comes from and goes to in a general fund. He said that one can look back over a 5 year period of time. He explained that 2/3 of Georgetown’s sales tax is related to consumption. Property Tax Revenue for FY 2017 was shown next by Morgan. Page 20 of 247 A graph of Sales Tax Revenue was shown by Morgan. Morgan explained that accurate figures are not yet available because $387 million dollars in property value is still under protest. He said that the City is projecting being able to come in with the same or a lower tax rate. Sales tax revenues are projected to be in a positive light said Morgan, adding that the over trend the City is seeing is part of the growth process. Morgan next displayed and spoke on the Utility Return on Investment (ROI) and Other Revenue. Operating Budget Highlights were shown next. Page 21 of 247 Morgan explained that they are requesting a reorganization of management and departments. He displayed an updated organization chart and showed departments and responsibilities under each of the Assistant City Managers: Jim Briggs, Wayne Reed and Laurie Brewer. Page 22 of 247 Page 23 of 247 Page 24 of 247 Morgan explained that he would now go back to the Operating Budget Highlights and speak on hitting the possible question marks in the budget. He said Lone Star Rail has been put into the budget as a placeholder, even without Council making the decision to continue as members. He explained that it needed to be considered when forming a budget, but a check would not be written until Council has reviewed and approved it. Morgan also discussed Transit funding. He said staff had received Council direction to move forward with fixed route systems and that Council had directed staff to also move forward looking at voucher systems. Morgan said the City needs to budget for the possibilities even though decisions have not been made yet. He explained that there will be additional discussion during the August 9, 2016 meetings. Morgan provided a General Fund Chart of Proposed New Personnel. Page 25 of 247 Morgan provided a list of One Time Study Requests. A List of the Council Discretionary Fund was shown next. Page 26 of 247 General Capital Projects were displayed next. Page 27 of 247 Debt discussion followed. Spring 2017 Debt Issue was displayed. Page 28 of 247 Special Revenue Funds was the next topic presented by Morgan. Operating SRFs were shown. The Convention & Visitors Bureau Fund was displayed and explained by Morgan. The Main Street Fund was shown and explained next. Page 29 of 247 Morgan said that the Paramedic Fund would be discussed later in the presentation and went on to display and discuss the Electric Fund FY 2017. Morgan spoke on the Key Initiatives of the Electric Fund. He explained that Georgetown is doing well in that more power is being generated than used. Page 30 of 247 Water Services Funds for FY 2016 and FY 2017 were shown next. Page 31 of 247 Page 32 of 247 Airport Fund was next. Diaz said it was good news in that the fund had a positive ending and plans put into place for airport fund improvement have been working. Page 33 of 247 The Stormwater fund was displayed next. Internal Service Funds were next in the presentation. Page 34 of 247 Morgan spoke on the Self Insurance fund and explained how lucky the City of Georgetown is to be positioned so well. It is highly unusual. Page 35 of 247 Morgan displayed the Budget Schedule and the Public Outreach and Education that is planned. City Manager, David Morgan, announced that the General Fund would be presented. Laurie Brewer, Assistant City Manager, started the presentation. She described sections of the budget workbooks that had been delivered to the Councilmembers and spoke on additions that had been given to them at this meeting. Brewer spoke on Truth in Taxation, Employee Compensation, Long Term Liability and the City’s proposed new positions. She spoke on narrative information in the workbooks and described the page on multi-year summaries. Brewer said a reorganization of departments is being proposed. She explained that some departments have been consolidated or renamed. Brewer explained that Downtown Service would now be named Administrative Services, for example. She touched on the reorganization of duties and departments under each of the Assistant City Managers. Brewer said the FY2016 is projected to end up 1% higher than projected, while 2016 expenditures are projected to be 1% below budget. She said that this would leave a fund balance of $1.5 million for one time uses and the Council discretionary fund. Paul Diaz, the City’s Budget Manager, provided a General Fund Overview. He explained that there are four areas of revenue – Property Tax Revenue, Sales Tax Revenue, ROI Revenue and All Other Revenue. Diaz provided a 5 year trend graph of property tax revenue. Page 36 of 247 Diaz explained that Property Tax Revenue is 22% of all revenue. He said that the City would receive the final figure of valuation on July 20, 2016 Councilmember Hesser asked Diaz, after protest, how much money is retained. Diaz said usually a 60% estimate is used as retention. Morgan said the figure is actual to whatever is negotiated. Morgan said there is a significant increase in protests this year - $1.5 billion dollars in protest. Hesser said he is concerned about possible bubbles in values. Morgan said anyone should protest if they do not feel the value is correct. Gonzalez said most are below the actual value. Diaz went on to provide an image of the Sales Tax Revenue. He said it accounts for 23% of the revenue funds and is also the most volatile. Diaz said that Georgetown seems to be insulated and immune to the crash other cities have been feeling. He explained that the City of Georgetown conservative estimate of 2.5% was indeed conservative. The City is now predicting an estimate of 4.4%, tied to growth. Diaz said all trends have been remarkably consistent over the past five years. Diaz next spoke on Return on Investment. Page 37 of 247 Other Revenues were shown next. Councilmember Brainard asked Diaz to let Council know the difference in rate for building materials. Diaz said the difference is 10% instead of 8% last year. Laurie Brewer, the Assistant City Manager, spoke next regarding expenditures. She explained the projections reflecting where the City would end up. She discussed recommendations for consideration by the Council. She spoke on the Planning Department update. Brewer also explained the change in methodology for Information Technology expense and how the expense would be allocated to the department of use. Brewer spoke regarding parks administration and library enhancements. She explained that the position at Garey Park would begin in July and there would be an additional $25,000.00 in mowing expense. Gonzalez asked Brewer about the FY2017 base changes and FY 2017 projections and where the change come in? Brewer said totals are totaling the line items. Brewer used the library section for explanation. Gonzalez said the numbers are not working for him. Morgan said they have included the 2% merit raises in the base. Brewer said the $50K change shown represent the new coordinator position. Brewer explained that “changes” is anything new and “base” is anything already loaded. Service level additions are under changes said Morgan. Ross asked about salary increases. He asked if they were effective September 1st. Brewer said they would be effective in February after the review process. Ross asked if any vacancy factors were used. Brewer said 1.5% was used. She said a total of $578,000.00 was used across the general fund for the vacancy factor. Brewer said this tracts consistently with other years. Brewer explained the overall steps of the Fire Department, the meet and confer amounts, the addition of three firefighters and the paramedic program. Brewer spoke on the Inspections Department. She explained the reorganization again in the Downtown Services and Management Services Departments, now to be named Administrative Services. She explained that there is a request of $100,000.00 for the organizational changes and transfers. Hesser asked about the Public Works position. Brewer explained the proposed position and change in the structure. She explained the salaries for City Manager, Assistant City managers and the City Secretary Page 38 of 247 Department request for $55K for records preservation of historic records. Brewer said there would be a slight decrease in the Communication Department because of the Webmaster moving to Information Technology. Brewer spoke on the $20K request for branding and identifying and establishing branding and guidelines. Brewer went on to speak on the Police Department budget. She said that Animal Services and Code Enforcement only have minor changes. Gonzalez asked why there was $730,000.00 in the base. Brewer explained that it is the reflection of the change in allocation of use of information technology. Police and Fire are very large users of information technology. Gonzalez asked if same amount continues forever and if it is actually studied. He said some years could perhaps be more, or perhaps be less. Brewer said it has been discussed at length with Department Heads and Directors. Morgan added that if there are savings at the end, they would be realized as savings instead of holding on for the next year. Mayor Ross asked if actual the difference in 2015 overtime and decreased overtime in 2016 was because of being better staffed and therefore eliminating some of the need for overtime. Mayor Ross asked if things have been titled differently. Chief Nero and Morgan said they are more staffed and trends have been addressed to manage overtime. Nero said there is no civilian overtime in the 2017 figures. Brewer went on to speak regarding transportation. She mentioned transit cost increases and said more Council discussion is necessary. Brewer spoke on the Public Works Director, a foreman position with a vehicle and an expense of $25,000.00 in right of way maintenance. Morgan spoke next regarding the budget. He told Council that they could look at the suggestions of what is funded and not funded in their workbooks. He asked Council to bring forward any questions or concerns that they may have. Gonzales would like to see a percentage in change displayed in future budget workbooks. Paul Diaz said he could accommodate the request by the following day’s workshop. Jonrowe asked about comparisons of revenues and expenses. She said she would like to see which are related to which and would like to know when numbers are related. Brewer said this was a great idea and staff could group them in the future. Brewer explained that the new financial system that the City is looking at will be able to easily establish the relationship. Brainard asked what authority staff has to move monies around from one account to another. Brewer monies could be moved within a fund and within a division, with the approval of the City Manager. She explained that all budget transfers must be approved by the City Manager. Brewer us an example of office supplies can be printing costs. If one goes over but is closely related to other, it would be permissible. Brainard said this was approving a lump sum budget with City Council approval. Brewer said moving streets money to parks would not be able to happen without Council approval. Mayor Ross added that anything over $50,000.00 would always come back to Council. Brainard asked about the TMRS fund going up or down. Wallace said it had increased by 12.6%. He then asked about the Williamson County Health District expense. Wallace said there is no increase proposed at this time. Gonzalez asked about unfunded liabilities and where it is found in this budget. He said he wants to know how each category is being addressed. Brewer said updates and amounts would be discussed. Wallace pointed out that the reference was at the back of the workbooks. The chart shows all unfunded liabilities. Jonrowe asked about the Downtown Tiers. Brewer said these would be discussed later, after the July 20th valuation figures. Jonrowe asked about a Bike Master Plan. Morgan said staff was managing studies as they can manage at the time. He explained that the Comprehensive Plan update and the Williams Drive Study will fall into how to supplement and plan. Jonrowe asked about reaching out to the citizens with a possible committee. Chief Sullivan spoke on emergency services. He explained that the Georgetown Fire Department provides service for the City and the ETJ, which is 134 square miles. Sullivan said the growth factors predict taking care of 100,000 people in the next 2 years. Sullivan provided an Overview Presentation. Page 39 of 247 Sullivan went on to explain and discuss the budget request of $238,000.00. Sullivan explained the 3 -24 hour shift. He said that one fire fighter is actually a request for 3, to cover all shifts. Sullivan explained the leave costs. He explained that this is a more cost effective way than paying overtime, which would be necessary if not funded. Sullivan said this would also improve moral. Sullivan than provided a Timeline and History chart of the GFD. Page 40 of 247 Call Activity was shown next. Sullivan provided the Call Demands of July 12, 2016, the day of this meeting. He said there has been an incredible increase in serious calls. Page 41 of 247 Sullivan provided an image of a Staffing Plan for Deployment, including 2011/2012 deployment, Traditional Deployment and Flexible Deployment and spoke on Strength of Force. Page 42 of 247 A chart showing response time and comparisons from 2011 through 2016 was shown next. Sullivan then provided the New Costs with the proposed Personnel. Page 43 of 247 Sullivan spoke on response time and improvement in response time, currently averaging 5 minutes and 30 seconds. He then spoke on the EMS billing service and said the City should expect $175,000.00 to be coming in monthly, which equals $450.00 per run. Sullivan showed Revenue Projections. He then showed EMS Collections and spoke on billing and Medicare. Page 44 of 247 Sullivan compared EMS incidents and Medicare Incidents. Sullivan next discussed patient age. Page 45 of 247 Sullivan said that patient age is an anomaly in Georgetown with the majority of transfers in the group of 70 and older. He said that Medicare represents 60% of the transports. Sullivan discussed expense projections and reimbursement models. Page 46 of 247 Sullivan gave examples of how the citizens need to feel that they are served with caring hearts. He shared moving examples of rescues and life-saving events. Sullivan showed the Budget Request for the Fire Department. Morgan said the plan would be to improve the delay from event to payment. He explained that, in this first year, they must close the books for the fiscal year. Morgan explained how this would only happen this first year of the program. Morgan said the Department would calculate and place adjustments for the delay in billing at the end of November. Morgan recommends two months so that this one time they can close the books. After this time, Gonzalez added, things would work into consistency. Sullivan mentioned the tangible values of this department, sitting on shelves, which are not just expended monies. Mayor Ross asked about the pattern of collections and if Chief sees any changes down the road. Sullivan said they could go higher but he wanted to remain conservative in projections. Morgan said they would be getting better because of improvements in efficiency. Ross said Public Safety is far more important than the monies. Jonrowe agreed and spoke on the transfers by ambulance. She said providing first responder services is about the service not the money. Morgan said they are proposing on demand. The proposal is to hire 3 paramedics, who will work a 40 hour work week and go through the academy to become a firefighter. Overtime will not need to be paid for peak demand, explained Morgan. Mayor Ross mentioned that if $175,000 is collected monthly, it would be $2.1 million a year. He said this would contribute to a positive cash flow soon. Page 47 of 247 Gonzalez pointed out that the Georgetown Fire Department would have needed to hire because of growth, even without the EMS. He said the cost would have been absorbed regardless. Fought said he is very pleased with how the program is going. Fought asked to make sure to emphasize one vehicle dispatched at a time without people’s lives at risk. Fought is concerned about staffing EMS. He is pleased that it is the City’s own decision and they do not have to check with or rely on others. Fought thanked Sullivan. Sullivan said the goal of the Georgetown Fire Department is to have Georgetown be the safest place in America to have a heart attack. He said they are happy to reunite families. Sullivan said he has the best job in the world. Sullivan thanked Council for their support. Eby asked about pro forma and what the 5% is based on. Diaz said it was based on overall growth projections and elderly care facilities going in. Diaz said it reflects transport forecasts from actual numbers. He said the accounting method is cash based but at 60 days instead of 120. Brewer said this is a similar accounting treatment to how the City figures sales tax. Eby asked about the overtime issue and if the City could use franchisees. Sullivan said the City does rely on franchise partners when running thin. Morgan said the presentation would move to street maintenance next. Jim Briggs said staff is working on a model that will challenge assumptions that have been made in the past. Briggs said he wants to take a step backward. He would like to bring in expertise in the matters, strategies and plans toward reliable street maintenance. Councilmember Fought said it is time for a relook. He said the City can do better. Morgan said the changes will be actively shown in the proposed budget on July 26th. Briggs said the budget would also connect to the capital improvement projects. Briggs spoke on current practices. He spoke on changes in management, policies and projects. He explained the results continue to be less than optimal. Briggs said methods, standards and goals need improvement. He explained that organizational changes are being worked on in the effort for improvement. Briggs spoke on the City’s maintenance assets. He spoke on the modified or depreciation approach. Briggs said the modified approach was selected 15 years ago and is performance based, which the depreciation approach would not allow. Briggs said the voters were asked for a quarter percent street maintenance fund. Briggs said this is providing $120,000.00 per year in revenue and $800,000.00 comes out of tax revenues. He explained that it is much more difficult to predict quality today. Briggs said materials and processes need to be revisited before moving forward. Fought said he applauds the effort and wants to separate the accounting standard and the maintenance standard. Morgan said the budget presentation would wrap up for the day with Capital Improvement Projects and Debt. Laurie Brewer, Assistant City Manager, spoke on the Energy Services Fund, Sidewalk Master Plan, Parks Department, Garey Park, San Gabriel Park, ADA, Facilities Projects, Downtown West (to be brought to Council soon), Fire Station 6, Phase 2 of Grace Heritage Center, Red Poppy Café Canopy, Lighting and Tree Mitigation, and a possible partnership with ESD. Brewer spoke next on the Proposed Debt, tax supported debt. She mentioned Garey Park and the 2 year plan, Phase 2 of San Gabriel Park and the Sidewalk Plan. Brewer noted the detailed debt schedules provided in the Council Workbooks. Brewer spoke on the self-supported debt project from the Georgetown Transportation Enhancement Corporation (GTEC). She said that the utility debt would be discussed in more detail at the meeting the following day. Jonrowe asked about the signature gateways. Brewer said discussion on this will take place in the Downtown Master Plan presentation and the discussion would include proposed funding through the TIRZ. The gateways would include entry point treatments. Jonrowe asked about sign maintenance. Morgan said it is in the plans. Morgan said enhanced promotion is also being looked at. Council has had discussions on gateways. Morgan said recommendations will be brought to Council soon and staff will appreciate the feedback. Jonrowe asked about the historic park funds. Brewer said this represents the HEB project on HWY 29. Brewer explained the agenda for the following day: Enterprise Fund Page 48 of 247 Electric Water Wastewater Airport Stormwater Mayor Ross recessed the Workshop Meeting to Executive Session under Section 551.071, Section 551.074 and Section 551.086 at 4.59 PM. Executive Session In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon’s Texas Codes, Annotated, the items listed below will be discussed in closed session and are subject to action in the regular session. B. Sec. 551.071: Consultation with Attorney - Advice from attorney about pending or contemplated litigation and other matters on which the attorney has a duty to advise the City Council, including agenda items - Hoskins Update and Possible Action Sec. 551.074: Personnel Matters - City Manager, City Attorney, City Secretary and Municipal Judge: Consideration of the appointment, employment, evaluation, reassignment, duties, discipline, or dismissal Sec. 551.086: Competitive Matters - Solar RFP Adjournment Mayor Ross adjourned the Workshop meeting to begin the Regular City Council Meeting at 6.00 PM. ____________________________________________________________________________________________________ Approved by the Georgetown City Council on _____________________________ Date ____________________________ __________________________ Dale Ross, Mayor Attest: City Secretary Page 49 of 247 Minutes of Meeting of the Governing Body of the City of Georgetown, Texas Wednesday, July 13, 2016 The Georgetown City Council will meet on Wednesday, July 13, 2016 at 2:00 PM at the Council Chambers at 101 E. 7th St., Georgetown, Texas The city of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require assistance in participating at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City Secretary’s Office, at least four (4) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 113 East 8th Street for additional information; TTY users route through Relay Texas at 711. Mayor Ross called the meeting to order at 2:29 PM. All Councilmembers were in attendance with the exception of Councilmember John Hesser, District 3, Councilmember Ty Gipson, District 5 and Councilmember Rachael Jonrowe, District 6. Councilmember Jonrowe joined the meeting at 2.45 PM Regular Session (This Regular session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order – A Special Meeting of the City Council Budget Workshop Continued from July 12th: Workshop overview, discussion and possible action regarding the FY2017 City of Georgetown Budget and Tax Rate -- David S. Morgan, City Manager City Manager, David Morgan, opened the continuation of the budget presentation from the previous day. He explained the discussion items of the day. Morgan said staff would be getting clarification to Council on building materials and providing detail of the funds with detailed expenses and revenues and their relationships. Brewer began the presentation. Mayor Ross asked the Council to remember that now is the time to ask questions or voice concerns regarding the budget. It is helpful to staff to hear the concerns as soon as possible to allow time for adjustments, he explained. Brewer began the presentation with Special Revenue Funds. She reminded the Council that the Paramedic Fund and Street Maintenance fund were presented the previous day. Brewer said special revenue funds represent funds restricted for specific purpose, based on state law or local designations. Brewer spoke on CVB revenues from the 7% local hotel occupancy tax for hotel stays. She said that FY 2016 will end up better than projected and staff is projecting a 31`% increase of revenues in FY2017 with the additions of the Hampton and the Sheraton. She spoke on the expenditures of $1.05 million related to enhanced advertising and conference recruiting funds and a fiscal impact study of the arts in Georgetown to provide information to continue to promote the arts. Brewer spoke on the expense of the CVB’s move to the current Council Chamber when City Hall moves to Downtown West. Brewer spoke on the Council Discretionary Fund. She explained that this comes from Council’s dedication of setting surplus aside, ending excess fund balances. Brewer said approximately $185,000.00 remains from FY2015. It is estimated that $750,000.00 will be able to be transferred in FY2017 for an ending balance of $935,000.00. Brewer spoke next on the Main Street Fund accounts for downtown façade and annual seed monies. She next spoke on the GEDCO and GTEC budgets and said that sales tax has been budgeted at a 4.5% increase for both. Brewer spoke on the expenditures planned. She said that the budget also accounts for any economic development agreements that are in play at this time. She said there is a responsibility to Tasus for $6,000 and Dispersol for $60,000.00. Morgan added that they are expecting a future request from TLCC and a placeholder of $100,000.00 has been added to the budget and is included in the GEDCO budget. Brewer said the GTEC figure is for roads and transportation projects that are related to economic development. Brewer spoke on TXDOT reimbursements, the Mays Street project and the Rivery extension. Page 50 of 247 Morgan said the Airport Road project is at Airport Road and Lakeway. He said there is a transportation need there, as well as the importance for economic development in that area. Morgan said the right of way would be ripe and ready to go for economic development expansion. He said the project was included in the FY2016 budget. Brewer spoke on the library and cemetery funds. She spoke on court funds for municipal court fines. Brewer explained that these must be spent for specific purposes. At this time, the funds are slotted to be used toward the benefit of new Council Chambers. Brainard asked about the Rivery Road project. Briggs said the right of way acquisition is coming to a close. Briggs said there have been some complexities with the purchase of individual properties. He also mentioned that GISD has a large piece of property within the project. Briggs said the right of ways should be completed within a couple of months and construction should start in one year to 14 months. Brainard asked if this was on schedule. Briggs confirmed. Mayor Ross reminded everyone that the Convention Center is opening this month. Brainard asked if the delay in the Rivery project was because of lack of resources. Briggs said the delay is more because of possession and condemnation of people’s properties. He explained that the City has to wait until the property is completely vacated in order to have access. Brainard asked if GISD is a condemnation property. Briggs said it should be a clear acquisition process with proper pay. Morgan said he is already working with GISD and explained how the needs of the school district and the City align. He explained that the City will make transportation improvements in an agreement for the property. Morgan said there will be several benefits for both the City and GISD. Mayor Ross asked about timelines. Briggs said construction would take another 2.5 to 3 years. Jonrowe asked about the Main Street Fund and the façade program. She said there seems to be a lot of volatility or fluctuation. Brewer said this is because it is based on actual grant requests from owners. Mayor Ross asked how much money was requested in façade grants in 2017. $150,000 will be available said Brewer. Brewer said the requirements are that the building is within the downtown overlay district and the improvements must be to the outside of the building. Brewer said up to $500 in sign grants are also available, restricted to commercial buildings. Jim Briggs, the City’s General Manager of Utilities began a presentation on Utilities. Briggs began with the electric fund. He provided a map of the 2016-17 Capital Improvement Projects for Electric and spoke on these projects. Briggs said the power supply costs have been 35 to 38 million for the last two years. He explained that as load increased, so did the power supply. Briggs said the City is now seeing an 8% growth in the utility each year, which is an abnormally high growth for a utility in Texas. He said the City must be able to meet the demand of the growth. Briggs spoke on several contracts for electricity and a contract for a gas project. He spoke on the wind farm contracts and a solar farm contact and its benefits to the City. Briggs explained that these contracts will allow the City to know what the price is and ensure that the cost stays relatively low as we continue to grow. Briggs went on to say that 60% of the electric service territory is a direct competition and the City must compete for customers. He added that in the last 15 to 20 years, the City has acquired 99% + of the customers in that area. He explained that reliability and service cost is important and retail can only take place within the City boundaries, other than at its own facilities. Briggs explained that the City serves both Scott & White and the Outlet Mall. He said that a Capital Improvement Project is looking for infrastructure for additional service. Briggs described the Shell Road growth and the energy needs there. He described the need for improvements and upgrades in the Serenada area. Briggs spoke on a number of projects with streets, transportation and the Downtown West project and the additional load. Briggs explained that some will convert from overhead to underground utilities. He went on to explain the need for a secondary circuit for the Scott & White hospital expansion. Briggs explained that the SW Bypass will allow for more extension of services. Jonrowe asked if the City was still participating in the pilot program for battery storage. Briggs confirmed and said the storage facility was constructed at Rabbit Hill. Briggs added that the City is looking at other options, possibly internally evaluating battery operation and how it might fit into the equation of renewable energy. Mayor Ross recognized Briggs and his staff for the 100% Green award they recently received in Dallas. Briggs spoke next on the water and wastewater fund and provided a slide and explanations. Page 51 of 247 Page 52 of 247 Jonrowe asked about the difference of residential water cost and commercial water cost. She said she noticed that other cities seem to have adopted the philosophy of charging less for commercial water. Mayor Ross explained said Council gave direction that commercial needs to pay more than residential. Briggs said the City does not currently have a demand rate for commercial. He said staff has been analyzing the data and working on recommendations. Briggs said there is a concern because commercial generally impacts restaurants and other small businesses. He explained that staff is looking into taking a look at increasing irrigation rates for commercial, but not the cost of doing business. Briggs said he will come back to Council with recommendations. This issue will be going to the Georgetown Utility Systems Advisory Board right after the budget and the process will be discussed prior to that, Briggs explained. Brainard asked why water costs are lower than other cities and asked if Georgetown was collecting enough. Briggs said yes because of the way the city maintains and manages its systems. Page 53 of 247 Briggs provided slides and spoke on Wastewater Services next. Briggs showed a map of the 2016-17 Capital Improvement Projects for Wastewater. He explained that the area will not optimally develop unless certain services are provided. Briggs said timing is important with the expansion of necessary facilities and putting off expansion of less helpful projects. He explained that it has a big impact. Page 54 of 247 Mayor Ross said it is important to point out that this utility fund is not part of the general fund and this $45 million project does not impact tax payers of Georgetown. Ross asked about the Berry Creek project. Briggs said it would start this year and take 2 years for completion. Briggs said the City has not increased rates since 2007. He said it was indicated last year that an increase would need to be looked at. Briggs explained that $1.50 is the proposed increase to handle the upcoming CIP expense. Jonrowe asked about possible rate increases. Briggs said at the conclusion of the presentation, there would be a discussion. A Public Works Presentation was provided next. Briggs explained how stormwater and streets were connected and discussed the creation of a new Public Works Department. • Public Works manages operations/planning, maintenance, and repairs City streets, sidewalks, drainage facilities, right of ways and airport functions. • Additional responsibilities include traffic control, emergency response, special events, regional planning and the Georgetown Transportation Enhancement Corporation (GTEC) • Funding for the street maintenance program comes from the General Fund and the Street Maintenance Sales Tax (reapproved in November 2014) • Funding for certain capital improvements comes from tax supported bonds (May 2015 ) Briggs spoke on the Public Works Street Rehabilitation Projects. • 6th Street and 7th Street – Between Walnut and Holly, Downtown Overlay District, $275,000.00 • 17th Street – Complete construction (Austin Ave. to Church St.); Point repair, regrading and overlay (Austin Ave. to Railroad Ave.); $75,000.00 design (FY17); $550,000.00 construction (FY18) • West 11th Street – Complete construction (Main St. to Rock St.); In conjunction with Sidewalk Bond Project; $416,000.00 • West 10th Street – Pavement rehab in conjunction with Sidewalk project on south side; $90,000.00. Briggs spoke on Street Maintenance. Page 55 of 247 • Sealant – On hold until completion of overall review of maintenance practices; $100,000.00; Subdivisions of Churchill Farms, The Meadows, Pinnacle, La Conterra and Riata Trail; Streets – Cooperative Way, Snead Drive, Rock, Bridge, Scenic, Gabriel View and County Club. • Hot-In Place Recycling – $819,000.00 – On hold until completion of overall review of maintenance practices; Cutler process; Single pass, hot in place asphalt recycler; Whispering Wind, Park Ln., Shannon Ln., Janis Dr., San Gabriel Overlook, Sunshine, Meadowbrook, Oakland Dr., Ridge Oak, Live Oak and Spanish Oak • Surface Sealer - $1,200,000.00 - On hold until completion of overall review of maintenance practices; Dan Mood Trail, Honey Suckle Cove, Sunflower, Night Hawk Way, Yucca Cove, Wild Rose Way, Hill Country Dr., Six Flags Dr., High Trail Dr., Blacksmith, Lone Star Way, Berry Creek (SH 195-Oak Tree), Airport Rd. (IH25-Cavu) • Point Repair and Overlay - $300,000.00; Thin overlay mix – 1” new asphalt; Inner Loop (south of SH 29); Rockride Ln. (south of SE 1) Briggs spoke on Sidewalks next, and showed a slide depicting the cost at $2,179,000.00. • Projects funded from the May 2015 Bond Election • Projects for FY17 include: Pedestrian signals and curb ramps at existing intersections- $500K – Williams Drive Corridor and Austin Ave.; Old Town Northeast (University-SH 29) - $960K; Austin Ave. (9th- University) - $178K; Austin Ave. (SH 29-FM2243) - $70K (design only); 8th Street (Rock-MKL) - $84K; 8th Street (Church-Myrtle) - $37K; 10th Street (Main-Rock) - $94K; 11th Street (Main-Rock) - $151K; Church Street (8th-9th) - $105K Briggs displayed and discussed Public Works Stormwater Services next. • Curb and Gutter Replacements: $500,000.00 annually; Replace deteriorating stand up curbs with new curb and gutter; Proposed for FY17 = Cottonwood, Willow, Parker, Judy, Golden Oaks, 16th & 17th Streets, Holly, 6th Street and Walnut • Infrastructure Improvements - $200,000.00: Rehab and repair above and beyond the normal maintenance. • Drainage Improvement Projects: 18th & Hutto - $100,000.00 design only, Identify potential solutions to flooding between 15th and 19th streets, west of Hutto Road, Construction FY18-19; 2nd & Rock Pond - $50,000.00 design only, Reconstruction poorly functioning water quality pond, Construction FY 18/19; Serenada Culvert - $50,000.00 design only, repair and upsize culverts at multiple crossing, construction FY 18-19; Village PID Inlet - $75,000.00 design and construction, alley and inlet repairs Briggs spoke regarding the Public Works Airport plans. He explained that the Airport Project has been pushed out until 2019 • Runway Rehab: FY19; $516,000.00; Main Runway (18/36); 4” overlay; 90 TxDOT/10 Airport • Wildlife Hazard Assessment and Mitigation Plan: $12,500.00, FAA Recommendation, 90 TxDOT/10 Airport Paul Diaz spoke on the airport fund. He explained how it is designed to be a self-supporting fund. Diaz said that, in past years, expenditures were more than revenues. Diaz said through the efforts of the Georgetown Transportation Advisory Board and City staff making necessary changes, the airport has now become more efficient. Leases and fuel charges were adjusted and collected in a more-timely manner. Diaz said many departments have worked together to accomplish the efficiency. He said, just two years ago, there was no system in place and best processes and practices were not being followed. Diaz spoke on how the budget also helped with airport funds. Other competitors in the market are now surveyed monthly. Diaz said the airport is now consistent with fuel. Diaz spoke on grant revenue through TXDOT. He again emphasized how the efforts and studies have resulted in positive changes. The airport is now market competitive in hangar rates. Fuel margins have increased in a positive way, explained Diaz. Diaz said all changes have been approached in a very public manner. Several meetings were held with airport tenants and interest groups and GTAB has been very present. Diaz went on to explain that the revenue project is 30% less than budget because of the price of oil and how this offsets both revenue and expenditure sides. He spoke on expenditures in 2016 and said that revenues will increase if oil prices increase. Diaz then spoke on expenditures in 2017. He said the cost of fuel is projected to increase by $600,000.00. Diaz said the anticipated fund will show $122,000.00 to a positive balance. He explained that this is two or three years ahead of projections. The Airport is building the fund balance. Brainard thanked the staff for the 180 degree turn around at the airport and thanked Russ Volk, the Airport Manager. Jonrowe asked for the level of confidence on the price of fuel going back. Diaz said it is a very volatile market, but the margin is a fixed portion – base charge and type of fuel. Page 56 of 247 Mayor Ross asked if there was any general fund support at the airport. Diaz confirmed. Gonzalez asked if there was a waiting list for leases. Diaz said there is not a waiting list, but they are 100% occupied. Gonzalez asked if future CIPs are in this budget. Diaz said not now because they are currently in a holding pattern. He explained that vacated leases will need rehabilitation in the future and funds will be requested in future budgets. The Internal Services Fund was discussed next. Leigh Wallace explained that these are funds that provide direct services to other departments in the City – Facilities, Fleet, Information Technology and a handful of administrative groups within the Joint Services Fund. Wallace spoke on the facilities maintenance fund and explained how it is lower, if the airport position is funded because facilities personnel will be needed less at the airport. Wallace explained the Facilities Fund expenditures and the inclusion of the replacement of HVAC at the Recreation Center. Wallace spoke next on the Fleet Fund. She explained the ongoing inventory of all vehicles and equipment. She explained how charges are distributed to the using departments. Wallace explained how there are replacement costs over time and spoke specifically regarding the replacement of police vehicles. Wallace said the new vehicles proposed to be purchased would include a vehicle for the fiber technician and the replacement of a VAC truck in the stormwater department. Ross asked if replacement is determined by mileage or age of a vehicle. Wallace said there are several factors. Stan Hohman, the Fleet Maintenance Supervisor, said both age and mileage are considered. He explained that many times, after a certain amount of years, manufacturers stop making parts, and vehicles become unrepairable. Hohman said, generally speaking, a vehicle is replaced at 12- 13 years old and/or 160,000 to 180,000 miles. Brainard asked if Crown Vics were police cars. Hohman confirmed and said they would be replacing 2008 and 2011 models. Morgan said these are shown in the Council Budget Workbooks under CIP Projects and under debt service on page 130. He explained how a $1.9 million short term debt sale in the spring would be used. Gonzalez asked if there is an expected return for replaced vehicles. Hohman said not likely, but that the City will be moving forward with less hold back vehicles. He said sometimes vehicles have been held too long, when they could be sold off at auction. Ross asked about the purchase of public safety vehicles. Morgan said other than the $1.9 million in short term debt, the rest of the purchase will be paid for with cash. Morgan said $3.39 million is the full replacement cost. Ross said that would leave $1.4 million to be cash funded. Gonzalez asked if sale funds go into the vehicle maintenance fund. Wallace said sale funds would go to the Vehicle Fleet ISF Fund. Information Technology was discussed next. Wallace said the Information Technology Department and the Finance Department have supported the change in methodology in charges and costs broken out to specific departments. She explained the advantage of recovering true costs. Wallace said the largest impact to the general service fund would be the Customer Care Department. Wallace reviewed the 3.5 positions requested for the Information Technology Department for Fire Support, Police Support and a Communications position. Wallace spoke on the Disaster Recovery Cloud Based Service requested. She explained that cloud based service will save a considerable amount of money for the City. Morgan said disaster recovery has been a discussion with the General Government and Finance Advisory Board (GGAF). Morgan said this would protect the City in the event of a disaster. He explained that the programs would be looked at on a pilot basis and then expanded if it works well. Wallace next explained the Joint Services Fund. She said it is a smattering of administrative services and recovers costs with allocation models. She explained that the fund has carried a significant balance from previous years. Wallace said this type of fund is not meant to build a balance. This year staff will apply a credit for 2016 and 2017, reducing fund balances since there is no need to accumulate. Wallace spoke on the highlights of budget requests in this area which included the request for tuition assistance, internal audits, inspection services supervisors, and the customer care increase coming from the Information Technology shift. Morgan explained the credit purpose and use. The City would then phase in the full impact of the new model over several years said Wallace – with a full recovery in 3 years. Ross asked who came up with the change in methodology. Wallace said many staff members have worked together through discussion but the largest part has been Paul Diaz, the City’s Budget Manager. Diaz said complexity was removed, leaving better efficiency, but staying consistent with the past. Page 57 of 247 Wallace went on to speak on the Self-insurance Fund. The City moved to this model of health insurance coverage in 2015, explained Wallace, with a goal to be a healthy fund in a few years. She said the fund has done much better and proceeded much faster than projected. Wallace explained that the claims and charges expected were lower. Morgan said the City is in a very rare position and there will be no need to increase City or employee contributions in 2017. He explained that the fund will continue to be watched very closely, as it could change drastically, quickly. It will be managed closely. Ross asked what is done with the money and where it is invested. Morgan said the investment policy is less than 1%. Laurie Brewer, the Assistant city Manager, said the best rates are in CDs right now. She said interest earnings might increase in the future. Morgan said the low interest rates do make amazing interest rates on bond sales. Morgan said the presentation was wrapping up and all funds had been discussed. He said staff will be working on follow-up and will provide answers to any requests from Council by the end of the week. Morgan said the official proposed budget would be presented at the workshop meeting on July 26th. He said the budget hearings would be on August 9th and August 16th. First and Second Readings will be August 23rd and September 13th. Morgan said he and staff will continue improving the budget process and thanked the many staff members that contributed. Jonrowe thanked Morgan for a successful process. Jonrowe asked what it would cost for closed captioning for council meetings. Morgan said this is being looked at through the ADA project and Council could make decisions regarding these matters. Adjournment Mayor Ross adjourned the meeting at 4.25 PM. ____________________________________________________________________________________________________ Approved by the Georgetown City Council on _____________________________ Date ____________________________ __________________________ Dale Ross, Mayor Attest: City Secretary Page 58 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Consideration and possible action to appoi nt Counci l member Anna Eby to the Capi tal Area Counci l of G overnments (CAPCOG ) Cl ean Ai r Coal i ti o n -- Mayo r Dale Ross ITEM SUMMARY: FINANCIAL IMPACT: NA SUBMITTED BY: Mayor Dale Ro ss - BH Page 59 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Consideration and possible action to authorize an application for a Capi tal Area Co unc i l of G overnments (CAP COG ) FY 2016/17 Reg i onal Ai r Qual i ty G rant for addi ti o nal sol ar pow ered trash and r e cycl i ng compactors -- Mike Babin, Deputy General Manager, Utilities ITEM SUMMARY: The purpose of this CAPCOG grant process is to suppo rt the goals of the regional Ozone Advance Program (OAP) Ac tion P lan. Funding for these grants is being pro vide d from the state’s “near-attainment grant” program to areas that have air pollution le vels that are attaining, but clo se to e xc eeding the National Ambient Air Quality Standards (NAAQS) for ground-level ozo ne . ITEM STATUS: Environmental Services’ go als for the FY 20 16 /1 7 continue to focus on the delivery of c onsistent, reliable, and safe collection of solid waste and recyclable materials while promoting the importanc e of a reduce, reuse, and re c yc le philosophy, and the benefits o f such practices. Grant mo ney, if awarde d, wo uld allow fo r the purchase and installation of multiple additio nal solar po wered Big Belly trash and recycling machines to be placed o n the three remaining corners of the Downtown Square as well as many of our City park facilities such as San Jose, Rivery, Blue Hole, and San Gabrie l P arks. Currently, there are seventeen Big Be lly receptacle s located throughout the City; the so lar powered trash co ntainers have a co mpac ting unit that enables 15 0 gallons o f garbage to be collected before having to be e mptied. Utilizing Big Belly machines allows for the co lle c tion of three time s the amo unt of volume of material as regular trash receptacles ave rage 50 gallons in size. The Big Belly recycling unit is also so lar po wered but non-compacting due to the voluminous nature of recyclables; the solar panel on the recycling receptacle powers the computer and senso rs which fe e d data to an online dashboard. Data is used to report o n collection efficiency as well as the volume of recycling and trash co llected. Through this grant we can reduce the amo unt of tail-pipe emissions pro duced from staff traveling to check trash can levels, as well as quantify the reductio n of methane and CO2 thro ugh the intro duction of recycling and the diversion of material from the landfill. This pro posal is backed by the City of Geo rge to wn Parks and Recreation De partment. The applic atio n fo r this program is available by CAPCOG now and closes August 19, 20 16 . The funds are being made available through the Capital Area Council of Governments under the direction of the Texas Commission of Environmental Quality. STAF F RECOMMENDATION : Direct staff to proceed and submit an application fo r CAP COG funds. FINANCIAL IMPACT: Financial impac t o nly o ccurs upon execution of any grant mo nies being awarded. City Co uncil will have the ability to either approve or deny the grant, as awarded, by e xe c ution o f the grant documents or refusal to do so. Although matc hing funds are not require d to receive funding, they are strongly considered when determining an applicant’s commitment to the program. SUBMITTED BY: Jordan Fengel, B.S., Environmental Services Coordinator/Mike Babin, Deputy General Manager, Utilities ATTACHMENT S: Description Regional Air Quality Grant Solic itatio n 7_8_2016 Page 60 of 247 PGA 582-16-60851-01, Amendment 1 Task 7.2, Deliverable 7.2.2 Page 1 of 12 CAPCOG Regional Air Quality Grants Request for Applications July 8 , 2016 PREPARED UNDER A GRANT FROM THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY The preparation of this document was financed through grants from the State of Texas through the Texas Commission on Environmental Quality. The content, findings, opinions, and conclusions are the work of the author(s) and do not necessarily represent findings, opinions, or concl usions of the TCEQ. Page 61 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 2 of 12 1. General The Capital Area Council of Governments (CAPCOG) is announcing the availability of regional air quality grant funding for 2016 and 2017. The purpose of this funding is to support the goals of the regional Ozone Advance Program (OAP) Action Plan. These goals are the following: 1. Remain in attainment of the 2015 8-hour ozone (O3) National Ambient Air Quality Standard (NAAQS) of 70 parts per billion (ppb); 2. Continue reducing the region’s 8-hour O3 design value to avoid being designated nonattainment for a new ozone NAAQS; 3. Put the region in the best possible position to bring the area into attainment of an O3 standard expeditiously if it does violate an ozone standard or gets designated nonattainment; 4. Reduce the exposure of vulnerable populations to air pollution when the region experiences high O3 levels; and 5. Minimize the costs to the region of any potential future nonattainment designation. There is $210,500 in funding available for 2016/2017 projects under the Regional Air Quality Grant. Funding for these grants is being provided from the state’s “near-nonattainment grant” program to areas that have air pollution levels that are attaining, but close to exceeding the National Ambient Air Quality Standards (NAAQS) for ground-level ozone. The funding was authorized under Rider 7 to the Texas Commission on Environmental Quality’s (TCEQ’s) appropriations for the 2016-2017 biennium, and are being provided by CAPCOG. Grant activities will take place between November 2016 and September 2017. 2. Timeline Projects funded under these grants would be expected to be implemented between November 1, 2016, and September 30, 2017. The following table shows the anticipated milestones for this grant program. Table 1. Regional Air Quality Grant Timeline Milestone Date(s) Request for Proposals Issued Early July, 2016 Grant Writing Workshop Tues., July 26, 2016 Proposals Due to CAPCOG Fri., August 19, 2016 Proposal Review Committee Meets September 1–21, 2016 Executive Committee Approval of Grants Wed., October 12, 2016 Target Date for Execution of Grant Agreements Mon., October 31, 2016 FY 2017 Q1 Report Due to CAPCOG from Recipients Wed., December 14, 2016 FY 2017 Q2 Report Due to CAPCOG from Recipients Tue., March 14, 2017 FY 2017 Q3 Report Due to CAPCOG from Recipients Wed., June 14, 2017 FY 2017 Q4 Report Due to CAPCOG from Recipients Thu., September 14, 2017 Final Report due to CAPCOG from Recipients Fri., October 13, 2017 Page 62 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 3 of 12 1st Post-Grant Report Due Tue., January 18, 2018 2nd Post-Grant Report Due Fri. April 13, 2018 3rd Post-Grant Report Due Fri. July 13, 2018 4th Post-Grant Report Due Fri. October 12, 2018 3. How to Apply Grant application forms are available from CAPCOG and can be obtained from the CAPCOG website, via email, or the CAPCOG offices. A separate application form must be submitted for each individual project proposed. In completing your application, read the instructions carefully. You will need to be concise, and provide a sufficient level of detail to facilitate informed consideration of your proposed project. Matthew Holderread, the grants coordinator at CAPCOG is available to assist interested parties during the application process and may be contacted from 8:00 am to 5:00 pm, Monday-Friday at mholderread@capcog.org or (512) 916-6185. Return your completed application to mholderread@capcog.org by 5:00 pm, August 19, 2016. 4. Eligible Recipients Except for state and federal agencies, any organization which is a member of the Central Texas Clean Air Coalition (CAC) may apply for a grant. Organizations can join the CAC as either a general, or supporting member depending on the type of organization, and the organizations level of commitment. All CAC members make a commitment to participate in the Ozone Advanced Program (OAP) Action Plan. CAC members may submit more than one application if they have multiple projects that support the goals of the OAP Action Plan. OAP participants as of June 30, 2016, include these organizations: 1. Bastrop County; 2. Caldwell County; 3. Hays County; 4. Travis County; 5. Williamson County; 6. City of Austin; 7. City of Bastrop; 8. City of Bee Caves; 9. City of Buda; 10. City of Cedar Park; 11. City of Elgin; 12. City of Georgetown; 13. City of Hutto; 14. City of Lakeway; 15. City of Leander; Page 63 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 4 of 12 16. City of Lockhart; 17. City of Luling; 18. City of Pflugerville; 19. City of Round Rock; 20. City of San Marcos; 21. City of Sunset Valley; 22. Capital Area Planning Organization (CAMPO); 23. Capital Area Metropolitan Transit Authority (CapMetro); 24. Central Texas Regional Mobility Authority (CTRMA); 25. CLEAN AIR Force of Central Texas (CAF); 26. Lone Star Clean Fuels Alliance (LSCFA); 27. Lower Colorado River Authority (LCRA); 28. Texas Lehigh Cement Company; and 29. Texas Nursery and Landscaping Association. If any organization is willing to make a formal commitment to join the CAC prior to the closing date for grant applications would also be considered eligible to apply. Any such organization would need to be approved to join at the August 10, 2016, CAC meeting in order to be eligible to apply directly , and would need to provide an official, signed resolution or letter to CAPCOG stating the organization’s desire to join the CAC no later than Monday, August 1, 2016, in order to be considered for approval at this meeting. Organizations that are not CAC general members or supporting members may partner with a CAC general member or supporting member to make a grant application. The CAC member must be the lead applicant and any organization partnering with the CAC member must have a formal subgrant agreement with the CAC member. The CAC member must identify its role in supervising the subgrant recipient’s activities as part of the grant application. 5. Geographic Restrictions Activities funded under this grant program should be based primarily within Bastrop, Caldwell, Hays, Travis, and Williamson Counties. 6. Eligible Activities Activities eligible to be funded under these grants will include: 1. Activities that reduce the O3-forming emissions of nitrogen oxides (NOX) or volatile organic compounds (VOC) in the Austin-Round Rock MSA; a. Example 1: solar panels, which reduce emissions from power plants; b. Example 2: financial incentives for employees to carpool/vanpool; c. Example 3: financial incentives for special events or construction firms to rent/use Tier 4 non-road equipment; Page 64 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 5 of 12 2. Activities that shift ozone-forming emissions to periods less likely to contribute to high O3 in the Austin-Round Rock Metropolitan Statistical Area (MSA); a. Example 1: energy storage systems that would reduce the need to dispatch high- emission peaker power plants in the middle of high O3 days; b. Example 2: financial incentives to construction and landscaping firms to reschedule work when TCEQ declares an O3 Action Day for the region; 3. Activities that assist in the tracking and reporting of activities that generate NOX or VOC or activities that reduce NOX or VOC emissions in the Austin-Round Rock MSA; a. Example 1: fleet management software that enables real-time tracking of engine idling, vehicle speeds, routes, etc.; b. Example 2: incentives to commuters to report/track their commuting patterns/habits; c. Example 3: “smart meters” or sub-metering systems that would enable more fine-scale data collection of electricity, natural gas, or water consumption; 4. Activities that assist in providing alerts or information to populations sensitive to O3 pollution; a. Example 1: giving personal ozone monitoring devices to schools, senior centers, hospitals, etc.; and b. Example 2: production of outreach and education materials targeted at sensitive populations helping them understand the air quality index (AQI). 7. Basis for Funding Funds will be distributed on a reimbursement basis and only costs incurred during the grant period will be eligible for reimbursement. Any grant funds awarded under this program that are not spent by September 30, 2017, will be returned to CAPCOG. While no match or in-kind contribution is required for a project to receive funding, a grant application’s commitment of its own resources will be considered in scoring the projects for selection. 8. Grant Proposal Selection Applications will be scored and ranked by a Review Committee consisting of members appointed by the CAC. The committee will hold a scoring meeting in September that will be open to the public. Each eligible applicant will be required to make a brief presentation on their application, and committee members will score the application immediately following the presentation. The highest and lowest scores for each application shall be thrown out and the average of the remaining scores will determine the application’s overall score. Committee members will not be able to score applications submitted by their own organization. Applications will be reviewed and scored based on the following criteria: 1. To what extent does the proposal reduce the exposure of sensitive populations in the Austin- Round Rock MSA to peak ozone levels? (50 points) a. Will this project change habits or the way people perceive air quality concerns? Page 65 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 6 of 12 b. Does the proposal reduce NOX emissions on high ozone days? If so, how much is the estimated reduction? c. Does the proposal reduce VOC emissions on high ozone days (VOC emissions reductions are about 30 times less effective at reducing ozone than NOX emissions reductions on a ppb/tpd basis)? If so, how much is the estimated reduction? d. Is the timing of NOX or VOC emissions changed so that the emissions are less likely to add to peak ozone concentrations? If so, how? e. Would the proposal help sensitive populations (children, seniors, adults with asthma) avoid exposure to high levels of air pollution when they do occur in the region? f. How likely would the organization be to move forward with the proposal if it does not receive any or all of the funding it requests? 2. Feasibility and Logistical Considerations (30 points) a. Is this project “scalable” (i.e., could the scope of the project be easily adjusted based on the availability of funds?) b. Are all of the major steps or tasks involved in the proposed project clearly presented and adequately described? c. Are responsible entities and personnel for accomplishing each step or task identified? d. Does the organization and personnel involved have a good track record for managing/carrying out similar types of work? e. How likely is it that the organization will successfully implement the proposal if awarded the grant? f. To what extent does the proposal create an administrative burden for CAPCOG in order to supervise the work? 3. Co-benefits of proposed project (20 points): a. To what extent has the applicant demonstrated an ability and intent to sustain the program beyond the term of the grant? b. To what extent does the project serve other regional goals (reduction in traffic congestion, energy conservation, water conservation, etc.)? c. To what extent does this project provide an innovative or unique solution or create conditions that can enable activities that will advance the goals of the OAP Action Plan? d. To what extent does this project provide a benefit for the whole region rather than just one jurisdiction or community? Final award of funds is subject to CAPCOG Executive Committee approval, scheduled for October 12, 2016. Each proposal’s score, ranking, and funding requested will be presented in rank order with the expectation that projects will be funded down the list until all monies have been obligated. Any remaining monies will be offered successively to the next ranked applicant until completely obligated. Page 66 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 7 of 12 9. Grant Agreements Grant recipients will be required to enter into standard legal Grant Agreements with CAPCOG, to ensure that the approved work program of the project is followed. Among other provisions, the Grant Agreements will include the following:  Grant funding will be provided on a reimbursement basis once a quarter, and all requests for reimbursement must be handled through CAPCOG.  Grant recipients must agree to complete the reporting and monitoring requirements described below, including allowing CAPCOG and TCEQ staff to perform on-site visits to monitor the progress of the project. 10.Reporting and Grant Monitoring During the grant period, each grant recipient will be required to submit a quarterly report to CAPCOG within 10 business days of the end of a state fiscal quarter. The relevant state fiscal quarters for these grants are the following:  State FY 2017 Q1: September 1, 2016 – November 30, 2016;  State FY 2017 Q2: December 1, 2016 – February 28, 2017;  State FY 2017 Q3: March 1, 2017 – May 31, 2017; and  State FY 2017 Q4: June 1, 2017 – August 31, 2017. The grant recipient will also be required to submit a final report within 10 business days of the end of the grant period (September 30, 2017). Grant recipients will need to continue providing reports once a quarter for a period of 1 year after the end of the grant program within 10 business days of the end of each of the following periods:  CAPCOG FY 2018 Q1: October 1, 2017 – December 31, 2017;  CAPCOG FY 2018 Q2: January 1, 2018 – March 31, 2018;  CAPCOG FY 2019 Q3: April 1, 2018 – June 30, 2018; and  CAPCOG FY 2018 Q4: July 1, 2018 – September 30, 2018. Reports will document the progress and completion of project tasks and provide data on the results of the project. The data to be reported will correspond to data required for the OAP Annual Report and with the expectation of each project to demonstrate that the project is achieving the goals described in the application. If the project includes equipment the grant recipient will be required to provide any data available on the equipment’s usage once installed. If equipment-specific data are not available, the grant recipient will be required to submit a record of electricity consumption or fuel usage for 12 months prior to installation at the meter associated with the equipment and will be required to submit this data for each reporting period after the installation of the equipment and provide an accounting for the relative share of electricity or fuel that the grant-funded equipment is estimated to account for the records submitted during the reporting period. Page 67 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 8 of 12 CAPCOG’s Grant Coordinator will conduct at least one site visit during the grant period to ensure that data is being collected and reported properly and that procedures and policies are being followed. If issues are identified during a monitoring visit, CAPCOG personnel will work with grant recipients to develop solutions and get the project back on the right track. If equipment is purchased, CAPCOG will verify installation through at least one site visit during the grant period. 11.Changes to Projects after Award Any changes to projects after grant award would need to be approved by the Review Committee and codified in an amended grant agreement with CAPCOG. Reimbursement amounts may be changed based on the changes and availability of funding. 12.Applicable Statutes and Regulations The conduct of projects funded under this program shall be in accordance with all applicable state and local statutes, rules, regulations, and guidelines. The main governing standards, include, but are not be limited to, the following:  Chapter 14 of the TCEQ Regulations (30 TAC Chapter 14);  The FY 2016-2017 near-nonattainment Grant Agreement between CAPCOG and TCEQ (582-16- 60181);  CAPCOG’s FY 2016-2017 near-nonattainment grant Proposal for Grant Activities (582-16-60851-01, Amendment 1);  Uniform Grant Management Standards, Comptroller of Public Account, adopted June, 2004 (“UGMS”). 13.Expense Categories Each grant application must include a budget with expense categories that correspond to those listed in UGMS: 1. Personnel/Salaries. Wages and salaries to pay for direct staff time required to perform under the grant. If the applicant proposed wage and salary expenses, it should identify applicable pay rates and the number of hours anticipated for this project. 2. Fringe Benefits. Fringe benefits for personnel directly performing work under this grant that are provided by the organization beyond wages and salaries required may be authorized in accordance with UGMS. 3. Travel. Travel expenses directly related to the conduct of the funded program may be authorized in accordance with UGMS and the terms of CAPCOG’s grant agreement with TCEQ. 4. Supplies. Expenses for supplies necessary for the conduct of the funded project include non- construction related costs for goods and materials having a unit acquisition cost (including freight) of less than $5,000. Such expenditures must generally relate to the routine purchase of office supplies (paper, pencils, and staplers) or other goods which are consumed in a relatively short period of time, in the regular performance of the general activities of the proposed project. Page 68 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 9 of 12 5. Equipment. Equipment necessary and appropriate for the proposed project may be authorized in accordance with UGMS and the terms of CAPCOG’s grant agreement with TCEQ. Expenses included under the Equipment expense category should be for non-construction related, tangible, personal property having a unit acquisition cost of $5,000 or more (including freight and set up costs) with an estimated useful life of over one year. Any equipment that will be used for other projects or activities, in addition to the funded project, may only be funded at an amount reflecting the appropriate percentage of time that the equipment will be directly used for the funded project. The special conditions and requirements set forth in the grant Contract (relating to Title to and Management of Equipment and Constructed Facilities), also apply to equipment purchased with pass-through grant funding. CAPCOG must explicitly approve the purchase of equipment prior to the grant recipient placing an order for the equipment under this grant in order to be reimbursed. 6. Construction. Appropriate construction costs may be authorized. Expenses budgeted under this category should be for costs related to the enhancement or building of permanent facilities. No construction costs may be incurred by a pass-through grant recipient unless the construction details are approved in advance by CAPCOG. Appropriate costs that may be included are:  The cost of planning the project;  The cost of materials and labor connected to the construction project;  The cost of equipment attached to the permanent structure; and  Any subcontracts, including contracts for services, performed as part of the construction. 7. Contractual Expenses. Professional services or appropriate tasks provided by a firm or individual who is not employed by the pass-through grant recipient for conducting the funded project may be authorized for subcontracting by the funds recipient. Applicable laws and regulations concerning bidding and contracting for services must be followed . 8. Other Expenses. Other expenses, not falling under the main expense categories may be included, if connected with the tasks and activities of the proposed project. The restrictions set f orth in the UGMS and the main Grant Agreement between CAPCOG and TCEQ apply. CAPCOG must ensure that expenses budgeted under this "Other" category are itemized by the grant recipient, and are fully considered and evaluated by CAPCOG. Some expenses that may be appropriate include:  Postage/delivery  Telephone/FAX  Utilities  Printing/reproduction  Advertising/public notices  Signs  Training  Office space  Basic office furnishings  Computer Hardware (under $5,000 and not listed under the Equipment category)  Computer Software 9. Indirect. Indirect costs may be funded, if applicable to the project, in accordance with the UGMS. If the project includes funding from any other source, that source and the share of each budget category that the applicant is seeking from this grant must be clearly identified in the application. Page 69 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 10 of 12 14.Types of Expenses That May Be Appropriate Both operational expenses and administrative expenses are allowable as direct costs. All direct costs to this grant must be identified specifically with the grant objective and directly related to at least one of the five goals of the OAP Action Plan. All expenses claimed for reimbursement under this grant must meet the terms of allowability in accordance with UGMS. Page 70 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 11 of 12 Table 2. Examples of Direct and Administration Expenses Goals Supported Examples of Direct Expenses Examples of Administration Expenses Stay in attainment (goal 1), continue reducing the region’s ozone design value (goal 2), put region in best position to come back into attainment (goal 3), Minimize costs of any future nonattainment designation (goal 5)  Transit passes  Financial incentives for carpooling/vanpooling  Payments for a parking cash- out program  A contract for an “emergency ride home” service for people who take alternative commutes;  Staff time (and associated fringe benefits) spent conducting outreach to encourage employees to use alternative means of commuting;  Equipment that will reduce emissions;  Equipment that enables improved activity monitoring;  Labor costs for installing the equipment;  Labor costs for operating/maintaining the equipment;  Any consumable supplies directly needed for the continued operation/maintenance of the equipment  Work involved in procuring goods or services;  Processing invoices;  Writing grant reports required as a part of this grant;  Supervision of personnel or contractors performing direct work on the project Reduce exposure of vulnerable populations (goal 4)  Personal/compact air quality monitoring devices  Outreach material designed to promote awareness of the Air Quality Index (AQI)  Salary and fringe benefits associated with staff time and mileage required to do presentations to groups that work with sensitive populations  Work involved in procuring goods or services;  Processing invoices;  Writing grant reports required as a part of this grant;  Supervision of personnel or contractors performing direct work on the project Page 71 of 247 CAPCOG Regional Air Quality Grant RFA, July 8, 2016 Page 12 of 12 15.Questions For any questions on this Request for Assistance, please direct them to CAPCOG’s Grants Coordinator Matthew Holderread at mholderread@capcog.org or (512) 916-6185. CAPCOG will maintain a “Response to Questions” document while this RFA is open and will post the responses online at www.capcog.org/airquality. Page 72 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Consideration and possible action to appro ve a Resolution authorizing the vacati on and abandonment of a 0.037-acre portion of an existing 1 0-foot P ubl i c Uti l i ty Easement out of Lot 3, B l ock A, P ark Meadow Secti on Tw o , a subdivision of reco rd in Cabinet F, Slide 387, P lat Reco rds of Williamson County, Te xas, and to authorize the Mayo r to execute a quitclaim deed -- Travis Baird, Real Estate Services Coordinator ITEM SUMMARY: The City has received a request for the abandonment of a 0.03 7-acre portio n of an existing 10’ P ublic Utility Easeme nt that bisects the subject property, which is lo cated at the west co rne r of Dawn Drive and P ark Me ado w Boulevard. The property is currently used as parking, but is propo sed for development for comme rc ial use. The easement is situated in such a way as to impede construction o f buildings on the property. There are no utilities curre ntly within the easeme nt area, and other Public Utility Easements e xist along the outer bounds o f the lot. The pro posed resolution will authorize the abandonme nt o f the Public Utility Easement. FINANCIAL IMPACT: N/A SUBMITTED BY: Travis Baird ATTACHMENT S: Description Res o lutio n P ac kage Page 73 of 247 Page 74 of 247 Page 75 of 247 Page 76 of 247 Page 77 of 247 Page 78 of 247 Page 79 of 247 Page 80 of 247 Page 81 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Forwarded fro m G eorg etow n Uti l i ty Systems Advi so ry B oard (G US): Consideration and possible action to approve a bid award to mul ti pl e bi dders for Water and Wastew ater Treatme nt Pl ant chemi cal s, at unit co sts for a period of up to 5 years – Glenn W. Dishong, Utility Directo r ITEM SUMMARY: The purpose of this bid is to provide water and waste water treatment chemicals as part of the plant operations insourc ing. Thirteen (13) bids were re c e ived. Lo west bid items were reviewed for compliance with the specifications and reference checks were perfo rmed. The term of contract: Fo r o ne (1 ) year and may be renewed for four (4) one-year periods upon review and approval by the City. STAF F RECOMMENDATIONS: Staff recommends award o f the bids to the low bidder fo r each item per attachment summary. B OARD RECOMMENDATION: This item was unanimo usly approved fo r reco mmendatio n to Co unc il by the GUS Board at their meeting held o n July 8, 2016. FINANCIAL IMPACT: The total annual cost is the projected cost of chemicals upon historical treatment process vo lume. Funds for this additional expe nditure are available in the water waste water treatment budget. Fund - Chemicals Annual Budge t 660-5-0529-51-1 49 $586,570.00 660-5-0531-51-1 49 $135,000.00 SUBMITTED BY: Glenn W. Dishong, Utility Director ATTACHMENT S: Description Recommendatio n Memo S o licitation Summary Breakout Bid Review S ummary Page 82 of 247 Page 1 of 2 Solicitation Award Recommendation To: David Thomison, Water Services Manager, GUS Mike Welch, Plant Operations Superintendent, GUS From: Deborah Knutson, CPPB – Senior Buyer, Purchasing Date: June 28, 2016 Re: Recommendation for Solicitation # 201638 – Water and Wastewater Treatment Chemicals SUMMARY: Due to the City’s Water Services Department resuming management of the water and wastewater treatment facilities, it was determined that a solicitation was needed to obtain bids for water and wastewater treatment chemicals. The solicitation was posted on the City’s Ion Wave bid system and 73 Vendors were invited to bid as well as three (3) HUB vendors from the State of Texas’ CMBL. Thirteen (13) bids were received. Lowest bid items were reviewed for compliance with the specifications and reference checks were performed. The term of contract: Initial term shall begin on date of award and remain in full force for one (1) year and may be renewed for four (4) one-year periods upon review and approval by the City. RECOMMENDATION: Upon review of bids it is recommended that the following be awarded:  Lake Georgetown Surface Water Treatment Plant: o Line Item # 1 (Sodium Hypochlorite 12.5%): FSTI, Inc. - Unit Price $ 0.51/gallon o Line Item # 2 (Aqualum 3004): Brenntag Southwest, Inc. - Unit Price $ 5.9066/gallon o Line Item # 3 (Aluminum Sulfate 48%): Brenntag Southwest, Inc. - Unit Price $ 0.5741/gallon o Line Item # 4 (Liquid Ammonia Sulfate 10%): Brenntag Southwest, Inc. - Unit Price $ 0.8583/gallon o Line Item # 5 (Sodium Permanganate 40%): Brenntag Southwest, Inc. - Unit Price $ 959.3321/drum o Line Item # 6 (CLARIFLOC C-9545): Polydyne, Inc. - Unit Price $ 400.95/drum  Park Water Treatment Plant o Line Item # 7 (Liquid Ammonia Sulfate 10%): Brenntag Southwest, Inc. - Unit Price $ 0.8583/gallon o Line Item # 8 (Sodium Hypochlorite 12.5%): FSTI, Inc. - Unit Price $ 0.51/gallon o Line Item # 9 (Aluminum Sulfate 48%): Brenntag Southwest, Inc. - Unit Price $ 0.5741/gallon  South Side Water Treatment Plant o Line Item # 10 (Liquid Ammonia Sulfate 10%): Brenntag Southwest, Inc. - Unit Price $ 0.8583/gallon o Line Item # 11 (Sodium Hypochlorite 12.5%): FSTI, Inc. - Unit Price $ 0.51/gallon Page 83 of 247 Page 2 of 2  Domel Ground Water Treatment Plant o Line Item # 12 (Chlorine Gas): Brenntag Southwest, Inc. - Unit Price $ 98.00/cylinder o Line Item # 13 (Liquid Ammonia Sulfate 10%): Brenntag Southwest, Inc. - Unit Price $ 1.9115/gallon  Dove Springs Wastewater Treatment Plant o Line Item # 14 (CLARIFLOC C-6266): Polydyne, Inc. - Unit Price $ 400.95/drum  Pecan Branch Wastewater Treatment Plant o Line Item # 15 (Sodium Hypochlorite 12.5%): Brenntag Southwest, Inc. – Unit Price $ 1.07/gallon o Line Item # 16 (Aluminum Sulfate 48%): Brenntag Southwest, Inc. - Unit Price $ 0.5741/gallon o Line Item # 17 (CLARIFLOC C-6286): Polydyne, Inc. - Unit Price $ 400.95/drum  San Gabriel Wastewater Treatment Plant o Line Item # 18 (Sodium Hypochlorite 12.5%): FSTI, Inc. - Unit Price $ 0.51/gallon o Line Item # 19 (Sodium Bisulfite): NAPCO Chemical Company - Unit Price $ 1.90/gallon  Cimarron Hills Wastewater Treatment Plant o Line Item # 20 (Sodium Hypochlorite 1.5%): Brenntag Southwest, Inc. - Unit Price $ 1.07/gallon  Berry Creek Wastewater Treatment Plant o Line Item # 21 (Sodium Hypochlorite 12.5%): Brenntag Southwest, Inc. - Unit Price $ 1.07/gallon  Stonewall Pump Station o Line Item # 22 (Chlorine Gas): Brenntag Southwest, Inc. - Unit Price $ 98.00/cylinder  Pastor Pump Station o Line Item # 23 (Chlorine Gas): Brenntag Southwest, Inc. - Unit Price $ 98.00/cylinder  Hoover Pump Station o Line Item # 24 (Chlorine Gas): Brenntag Southwest, Inc. - Unit Price $ 98.00/cylinder * Notes: Line Item # 2 – Low Bidder (Chameleon) did not supply enough information to show chemical bid is equivalent to chemical required in specifications; second lowest Bidder (Brenntag Southwest, Inc.) recommended. Line Item # 5 – Low Bidder (Univar) bid incorrect chemical; second lowest Bidder (Shannon Chemical) bid a FOB as Exton, PA, Leaving the City with liability of delivery; Third lowest Bidder (Brenntag Southwest, Inc.) recommended. Line Item # 13 – Low Bidder (Chemtrade) did not want to accept an award of only one line item; Second lowest Bidder (Chameleon) did not want to accept an award of only one line item; Third lowest Bidder (Brenntag Southwest, Inc.) recommended. Line Item # 15 – Low Bidder (NAPCO) did not want to accept an award of this line item; second lowest Bidder (Brenntag Southwest, Inc.) recommended. Page 84 of 247 ITB No./Name: 201638 - Water and Wastewater Treatment Chemicals Solicitation Summary - Breakout Lake Georgetown Surface WTP 1.Sodium Hypochlorite 12.5%214,615 $ 0.51 (FSTI) $ 109,453.65 $ 0.619 (Brenntag)132,846.69$ $ 0.7233 (DPC)155,231.03$ $ 0.76 (NAPCO) No Other Bids No Other Bids 2.Aqualum 3004 (Or approved equivalent) 7,000 $ 5.73 (Chameleon) (* See # 4 below) $ 40,110.00 $ 5.9066 (Brenntag)41,346.20$ No Other Bids -$ No Other Bids No Other Bids No Other Bids Equivalent Name:CI8840 Aqualum 3004 3.Aluminum Sulfate 48%152,736 $ 0.5741 (Brenntag) $ 87,685.74 $ 0.64 (Chameleon)97,751.04$ $ 0.6997 (Chemtrade)106,869.38$ No Other Bids No Other Bids No Other Bids 4.Liquid Ammonia Sulfate 10%32,829 $ 0.8583 (Brenntag) $ 28,177.13 $ 1.04 (Chameleon)34,142.16$ $ 1.207 (Chemtrade)39,624.60$ No Other Bids No Other Bids No Other Bids 5.Sodium Permanganate 40% 64 $ 666.875 (Univar) (* See # 2 below) $ 42,680.00 $ 957.43 (Shannon) (See # 3 below) 61,275.52$ $ 959.3321 (Brenntag)61,397.25$ $ 993.85 / 44.25 gal drum (DPC) $ 1,015.06 (Chemrite) No Other Bids 6.CLARIFLOC C-9545 (Or approved equivalent)12 $ 400.95 (Polydyne) $ 4,811.40 $ 572.04 (Sterling)6,864.48$ No Other Bids -$ No Other Bids No Other Bids No Other Bids Equivalent Name:Clarifloc C-9545 Zetag 8848FS Park WTP 7.Liquid Ammonia Sulfate 10%12,500 $ 0.8583 (Brenntag) $ 10,728.75 $ 1.04 (Chameleon)13,000.00$ $ 1.207 (Chemtrade)15,087.50$ No Other Bids No Other Bids No Other Bids 8.Sodium Hypochlorite 12.5%52,254 $ 0.51 (FSTI) $ 26,649.54 $ 0.619 (Brenntag)32,345.23$ $ 0.7233 (DPC)37,795.32$ $ 0.76 (NAPCO) No Other Bids No Other Bids 9.Aluminum Sulfate 48%4,811 $ 0.5741 (Brenntag) $ 2,762.00 $ 0.64 (Chameleon)3,079.04$ $ 0.6997 (Chemtrade)3,366.26$ No Other Bids No Other Bids No Other Bids South Side WTP 10.Liquid Ammonia Sulfate 10%23,308 $ 0.8583 (Brenntag) $ 20,005.26 $ 1.04 (Chameleon)24,240.32$ $ 1.207 (Chemtrade)28,132.76$ No Other Bids No Other Bids No Other Bids 11.Sodium Hypochlorite 12.5%28,401 $ 0.51 (FSTI) $ 14,484.51 $ 0.619 (Brenntag)17,580.22$ $ 0.7233 (DPC)20,542.44$ $ 0.76 (NAPCO) No Other Bids No Other Bids Domel Ground WTP 12.Chlorine Gas 168 $ 98 (Brenntag) $ 164.64 $ 115 (DPC)19,320.00$ No Other Bids -$ No Other Bids No Other Bids No Other Bids 13.Liquid Ammonia Sulfate 10% 6,000 $ 1.207 (Chemtrade) (See # 5 below) $ 7,242.00 $ 1.25 (Chameleon) (See # 4 below) 7,500.00$ $ 1.9115 (Brenntag)11,469.00$ No Other Bids No Other Bids No Other Bids Dove Springs WWTP Division: GUS - Water Services Opening Date: May 18, 2016 @ 2:00 Item #Description Est. Annual Qty Estimated Extended Price 2nd Lowest Price (Vendor) Estimated Extended Price 3rd Lowest Price (Vendor) Estimated Extended Price 4th Lowest (Vendor) Lowest Price (Vendor) 5th Lowest (Vendor) 6th Lowest (Vendor) 1 Page 85 of 247 ITB No./Name: 201638 - Water and Wastewater Treatment Chemicals Solicitation Summary - Breakout Division: GUS - Water Services Opening Date: May 18, 2016 @ 2:00 Item #Description Est. Annual Qty Estimated Extended Price 2nd Lowest Price (Vendor) Estimated Extended Price 3rd Lowest Price (Vendor) Estimated Extended Price 4th Lowest (Vendor) Lowest Price (Vendor) 5th Lowest (Vendor) 6th Lowest (Vendor) 14.CLARIFLOC C-6266 (Or approved equivalent)12 $ 400.95 (Polydyne) $ 4,811.40 $ 572.04 (Sterling)6,864.48$ No Other Bids -$ No Other Bids No Other Bids No Other Bids Equivalent Name:Clarifloc C-6266 Zetag 8848FS No Other Bids No Other Bids Pecan Branch WWTP 15.Sodium Hypochlorite 12.5%1,226 $ 0.76 (NAPCO) (See # 6 below) $ 931.76 $ 1.07 (Brenntag)1,311.82$ $ 1.27 (FSTI)1,557.02$ $ 1.44 (Commercial) $ 1.7 (Univar) $ 2.25 (DPC) 16.Aluminum Sulfate 48%37,407 $ 0.5741 (Brenntag) $ 21,475.36 $ 0.64 (Chameleon)23,940.48$ $ 0.6997 (Chemtrade)26,173.68$ No Other Bids No Other Bids No Other Bids 17.CLARIFLOC C-6286 (Or approved equivalent)24 $ 400.95 (Polydyne) $ 9,622.80 $ 572.04 (Sterling)13,728.96$ No Other Bids -$ No Other Bids No Other Bids No Other Bids Equivalent Name:Clarifloc C-6286 Zetag 8848FS San Gabriel WWTP 18.Sodium Hypochlorite 12.5%48,535 $ 0.51 (FSTI) $ 24,752.85 $ 0.619 (Brenntag)30,043.17$ $ 0.7233 (DPC)35,105.37$ $ 0.76 (NAPCO) No Other Bids No Other Bids 19.Sodium Bisulfite 6,450 $ 1.9 (NAPCO) $ 12,255.00 $ 2.09 (Commercial)13,480.50$ $ 2.59 (Univar)16,705.50$ $ 6 (PVS) No Other Bids No Other Bids Cimarron Hills WWTP 20.Sodium Hypochlorite 12.5%2,953 $ 1.07 (Brenntag) $ 3,159.71 $ 1.27 (FSTI)3,750.31$ $ 1.44 (Commercial)4,252.32$ $ 1.7 (Univar) $ 2.25 (DPC) No Other Bids Berry Creek WWTP 21.Sodium Hypochlorite 12.5%8,535 $ 1.07 (Brenntag) $ 9,132.45 $ 1.27 (FSTI)10,839.45$ $ 1.44 (Commercial)12,290.40$ $ 1.7 (Univar) $ 2.25 (DPC) No Other Bids Stonewall Pump Station 22.Chlorine Gas 60 $ 98 (Brenntag) $ 5,880.00 $ 115 (DPC)6,900.00$ No Other Bids -$ No Other Bids No Other Bids No Other Bids Pastor Pump Station 23.Chlorine Gas 60 $ 98 (Brenntag) $ 5,880.00 $ 115 (DPC)6,900.00$ No Other Bids -$ No Other Bids No Other Bids No Other Bids Hoover Pump Station 24.Chlorine Gas 48 $ 98 (Brenntag) $ 4,704.00 $ 115 (DPC)5,520.00$ No Other Bids -$ No Other Bids No Other Bids No Other Bids 2 Page 86 of 247 ITB No./Name: 201638 - Water and Wastewater Treatment Chemicals Solicitation Summary - Breakout Division: GUS - Water Services Opening Date: May 18, 2016 @ 2:00 Item #Description Est. Annual Qty Estimated Extended Price 2nd Lowest Price (Vendor) Estimated Extended Price 3rd Lowest Price (Vendor) Estimated Extended Price 4th Lowest (Vendor) Lowest Price (Vendor) 5th Lowest (Vendor) 6th Lowest (Vendor) Pmt. Terms:FOB:Responsive Delivery in days Emergency - delivery cost Net 30 Destination Yes 1 - 3 days $ - Net 30 Georgetown, TX Yes 2- 3 days $ - Net 30 Georgetown, TX Yes Not provided $ - Net 30 Destination Yes 3 days $ - Net 30 Destination Yes 2 days $ - Net 30 Destination Yes 2 - 4 days $ - Net 30 Delivered Yes 2 - 3 days $ 125.00 Net 30 Exton, PA Yes 7 - 10 days $ 500.00 Net 30 Destination Yes 2 - 10 days $ - Net 30 Destination Yes 2 days $ - Net 30 Destination Yes 2 - 3 days yes Net 30 Georgetown, TX Yes 7 - 10 days yes if before 2 days Net 30 Not provided Yes 3 - 5 days N/A BID NOTES: 1. Kemira Water - No bid 2. Univar USA - DISQUALIFIED - Chemical Bid does not meet specifications. 3. Shannon Chemical - DISQUALIIFED - Liability Issue (FOB: Exton, PA). 5. Chemtrade Chemicals - (Line item # 13) Did not accept award of only one line item. 6. NAPCO Chemical Company - (Line item # 15) Did not want to accept this line item, only Line # 20. 7. Invitations sent to 77 Vendors 8. 6.67% Georgetown vendors 9. Sent to three (3) HUB vendors 10. Initial term one (1) year starts on Date of Agreement. 11. Renewals - four (4) additional 1 year renewals 12. Chemicals were reviewed by: [David Thomison & Water Services Manager/Water Services] 13. Bid Reviews done by: [David Thomison, Water Services Manager, GUS-Water Services; Richard Vicera, CH2M] 14. Detailed notes on evaluation worksheets in file Chameleon Industries Vendor FSTI Brenntag Polydyne NAPCO Sterling Water PVS Mini Bulk 4. Chameleon - (Line item # 2) DISQUALIFIED - Did not provide sufficient information to show equivalent. / (Line item # 13) - Did not accept award of only one line item. Chemtrade Univar USA Shannon Chemical DPC Industries Commercial Chemical Chemrite 3 Page 87 of 247 ITB No./Name: 201638 - Water and Wastewater Treatment Chemicals Division: GUS - Water Services Opening Date: May 18, 2016 @ 2:00 Bid Review Summary Evaluation Category Description Max Pts.FSTI Brenntag Polydyne NAPCO Chameleon Industries Chemtrade Univar USA Shannon Chemical Pricing (See Summary)50 50 50 50 50 Business History and Experience as per Bid Information Form (Attachment B) 30 30 30 30 30 Business References as per Reference Sheet (Attachment C) 20 20 19.7 20 20 100 100 99.7 100 100 Bid Review Team Members: David Thomison Richard Vicera Reference Checks: Deborah Knutson Not Evaluated/Reviewed - (Low Bids reviewed first) DISQUALIFIED (Bid does not meet specs) DISQUALIFIED (Liability issue FOB: Exton, PA) DPC Industries Commercial Chemical Chemrite Sterling Water PVS Minibulk DISQUALIFIED - (Line item # 2 - not enough info. provided to show equivalent) / (Line Item # 13 - did not want to accept award of only one line item.) Vendor did not want to accept award of only one line item. Page 88 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Forwarded fro m G eorg etow n Uti l i ty Systems Advi so ry B oard (G US): Consideration and possible action to approve a bid award to Sheri dan Envi ronmental for sl udge and bi o-sol i ds transport and di sposal servi ces, at unit costs fo r a period o f up to 5 years - Glenn W. Disho ng, Utility Director ITEM SUMMARY: The purpose of this bid is to provide sludge and bio-solids transport for disposal as part of the water waste water plant operations insourc ing. The bid #201644 was reviewed June 21 , 2016 for compliance with the specifications and reference chec ks were performed. The term o f co ntract: For one (1) year and may be rene wed for four (4) one -ye ar periods upon review and approval by the City. B OARD RECOMMENDATION: This item was unanimo usly approved fo r reco mmendatio n to Co unc il by the GUS Board at their meeting held o n July 8, 2016. STAF F RECOMMENDATIONS: Upon review of bids it is recommended that the follo wing c ontract agreeme nt for sludge handling and dispo sal se rvic e s be awarded to: Sheri dan Envi ro nmental , LLC o Li ne Item # 1 (Li qui d Sl udge Transportati on) – Uni t Pri ce $ 280.00 per l oad o Li ne Item # 2 (B i o-sol i ds Transportati on and Di spo sal ) – Uni t P ri ce $ 30.50 per yard o Li ne Item # 3 (B i o-sol i ds Transportati on and Di spo sal ) – Uni t P ri ce $ 48.50 per yard o Li ne Item # 4 (Pro vi si o n of Bi o-sol i ds Storag e Contai ners) – Uni t Pri ce $ 0 .00 per mo nth FINANCIAL IMPACT: The total actual annual cost is the pro jected cost of sludge handling and disposal base d on historical treatment process volume. Cost o f the sludge transport and disposal will be funded from the water and wastewater plant operations budget. Name Fund Annual Budget Water Sludge Disposal 660-5-0529-5 1-6 10 $ 9 1, 500.00 Wastewater Sludge Disposal 660-5-0531-51-6 10 $5 51,000.00 Combined Total Budget $6 42 ,500.00 SUBMITTED BY: Glenn W. Dishong, Utility Director ATTACHMENT S: Description P ricing Bid Tab Evaluation Wo rks heet S o licitation Summary Referenc es Chec ks Recommendtio n Memo Page 89 of 247 ITB No.: 201644 ITB Name: Sludge Hauling Services Division: GUS - Water Services Opening Date: June 21, 2016 @ 2:00 PM (CST) Pricing Bid Tabulation 1. Liquid Sludge Transportation 618 280.00$ 173,040.00$ 2. Biosolids Transportation & Disposal (Price per Yard)10,380 30.50$ 316,590.00$ 3. Biolosids Transportation & Disposal (Price per Ton)2,715 48.50$ 131,677.50$ 4. Provision of Biosolids Storage Containers 10 -$ -$ TOTAL $ 621,307.50 ITEM# Annual Estimated Quantity Sheridan Environmental, LLC Unit Price Extended Price TERMS Net 30 FOB N/A Addendum 1  FOR REFERENCE ONLY - This document summarizes proposals received and some key pieces of information which may be located with a brief examination of the proposals, and is not intended to replace a complete detailed evaluation of each proposal.Page 90 of 247 ITB No.: 201644 ITB Name: Sludge Hauling Services Division: GUS - Water Services Opening Date: June 21, 2016 @ 2:00 PM (CST) Evaluation Worksheet Evaluation Category Description Max Pts.Vendor # 1 Pricing as per Bid Form (Attachment A) 50 Total Price:621,307.50$ Business History and Experience as per Bid Information Form (Attachment B) 30 30 Business References as per Reference Sheet (Attachment C) 20 20 100 100 Reviewed for compliance: David Thomison Reference Checks: Deborah Knutson Checklist Copy of Bid Document (page 1) Addendum No. 1 Acknowledgement  Completed Bid Form (Revised) Completed Bidder's Information Form  Completed Reference Sheet  1 original / 3 copies  Copy of Licenses/Certificates/permits  Copy of Spill Plan  Subcontractor info (if applicable) Co-Op Contract Info?N/A W-9, 1295, Ins. (Upon award)N/A HUB?No Georgetown Vendor?No 50 Page 91 of 247 ITB No.: 201644 ITB Name: Sludge Hauling Services Division: GUS - Water Services Opening Date: June 21, 2016 @ 2:00 PM (CST) Solicitation Summary ITEM#Sheridan Environmental, LLC TOTAL PRICE (per annual estimated quantities) 621,307.50$ TERMS Net 30 FOB N/A Addendum 1  Recommended Best Value: Sheridan Environmental, LLC Total Points 100 Rating 1 Bid Notes: BID NOTES: 1. Invitations sent to 247 Vendors 2. 3.64 % Georgetown vendors (9) 3. 17.81% HUB vendors (44) 4. Sent to zero (0) State of Texas CMBL HUB Vendors - None in Williamson County 5. Initial term - one (1) year starting on date of Agreement. 6. Renewals - four (4) additional one (1) year renewals 7. Bid reviewed by David Thomison, Water Services Manager, GUS-Water Services 8. Detailed notes on evaluation worksheets in file Page 92 of 247 ITB No.: 201644 ITB Name: Sludge Hauling Services Division: GUS - Water Services Opening Date: June 21, 2016 @ 2:00 PM (CST) Reference Checks Summary - Past Performances Reference Criteria Max Points Responsiveness to the City:4 Submitted references similar with similar scope/organizations Yes Yes Submitted correct # of references with all contact info.Yes Yes General:4 Number of years doing buisness with Vendor 5 yrs 5 yrs Vendor in Good Standing Yes Yes Quality of Product:4 Products in compliance with requirements Yes Yes Quality of Services 4 Ability to meet scheduled deadlines Yes Yes Accurate & Timely invoicing Yes Yes Customer Service 4 Proactive behavior with entity (followup & keeping customer informed)Yes Yes Flexibility (Were Emergency orders placed, and how handled) Flexible / No ER orders Flexible / No ER orders Total Points:20 Sheridan Environmental, LLC Sheridan's Subcontractor: Wastewater Transport Services, LLC 4 4 4 4 20 20 20 4 4 4 4 4 4 Page 93 of 247 Page 1 of 1 Solicitation Award Recommendation To: David Thomison, Water Services Manager, GUS Mike Welch, Plant Operations Superintendent, GUS From: Deborah Knutson, CPPB – Senior Buyer, Purchasing Date: June 23, 2016 Re: Recommendation for Solicitation # 201644 – Sludge Hauling Services SUMMARY: Due to the City’s Water Services Department resuming management of the water and wastewater treatment facilities, it was determined that a solicitation was needed to obtain bids for sludge and biosolids transport and disposal. The solicitation was posted on the City’s Ion Wave bid system and 247 Vendors were invited to bid. There were no HUB vendors from the State of Texas’ CMBL site for Williamson County. One (1) bid was received. The bid was reviewed for compliance with the specifications and reference checks were performed. The term of contract: Initial term shall begin on date of award and remain in full force for one (1) year and may be renewed for four (4) one-year periods upon review and approval by the City. RECOMMENDATION: Upon review of bids it is recommended that the following be awarded:  Sheridan Environmental, LLC o Line Item # 1 (Liquid Sludge Transportation) – Unit Price $ 280.00 per load o Line Item # 2 (Biosolids Transportation and Disposal) – Unit Price $ 30.50 per yard o Line Item # 3 (Biosolids Transportation and Disposal) – Unit Price $ 48.50 per yard o Line Item # 4 (Provision of Biosolids Storage Containers) – Unit Price $ 0.00 per month Page 94 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Forwarded fro m the G eo rgetown Transportati on Advi sory Board (G TAB): Consideration and possible action to award the annual bi d f o r G rade #4 and #5 chi p se al trap rock ordered and delivered o n an as needed basis to Vul can Constr ucti o n Materi al s LLC of San Antonio Tx. in the e stimated amount of $126,603.00 -- Edward G. P olasek, AICP, Transpo rtation Services Director ITEM SUMMARY: Bids were re c e ive d for bid ite m “201643 ” on June 7 th, 20 14 to provide the City with Grade #s 4 and 5 Type B per TxDOT specification 300 Surface Course trap rock. Numero us companies were notified of the bid with o ne business responding. Trap sto ne is only available in a few locations within the State. This aggre gate is used for in-house two co urse chip seals treatme nts identified in the annual Stre e t Maintenance Capital Improveme nt Pro gram. G TAB B OARD RECOMMENDATION: This item was unanimously recommended by the GTAB Board for Counc il approval at the July 08, 2016 GTAB Bo ard meeting. STAF F RECOMMENDATION: The aggregate per ton price is slightly lower than last year. Staff favors the re c ommendation. FINANCIAL IMPACT: Funds for this purchase will come from account number 10 0-5 -0846-52-806 “rehabilitation” SUBMITTED BY: Jana Kern on behalf o f Mark Miller ATTACHMENT S: Description street lo cations S treet Names Page 95 of 247 WA L N U T ST S M I T H B R A N C H B L V D T R AILSENDDR ASH S T O LI V E S T R A B B I T H O L L O W L N C A P R O C K P L E 1 8 T H S T R I F L E B E N D D R PLE A S A N T V A L L E Y D R P L A T E A U T R L E 1 9 T H S T L A U R E L ST E 16 T H S T EL M S T E 1 3 T H S T R A I N T R E E D R E 3 R D S T PI NE ST C A N D L E R I D G E T R L E 4 T H S T E 2 0 T H S T E 5 T H S T JAN L N V I N E S T PAIG E ST E 2 ND S T C AROLCT W IL B A R G E R P T P I R A T E C V E22 N DST W I N C H E S T ERDR L E E D S C A S T L E W A L K WILCOWAY C O T T O N T A I L L N E 8 T H S T PERKIN S P L M O T T E YSTA S H B E R R Y T R L M O U L I N S L N S M Y R T L E S T H A V E N L N K A T Y L N ER U T ER S V I L L E D R E17THST F M 1 4 6 0 E15T HST E 7 T H S T Q U AIL V A LLEY DR H U TTORD M A P L E S T H I G H T E C HDR T O W E R D R E 2 1 S T S T S C H U R C H S T S M I T H C R E E K R D SE INNER LOOP SAM HOUSTON AVE N E I N N E R L O O P S O U T H W E S T E R N B L V D 2016 Chip Seal Program !!I 0 1,000 2,0 00500Fe et Cit y of Geo rge tow n Leg en d 2016 Chip Seal Georgetown City Limit s Page 96 of 247 Page 97 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Consideration and possible action to adopt the pro po sed 20 17 property tax rate on a future agenda and to set dates fo r two publ i c heari ngs -- Leigh Wallace, Finance Director ITEM SUMMARY: State law requires that all taxing jurisdictions participate in the process of Truth-In-Taxatio n. When a proposed prope rty tax rate exceeds the lower of 100 percent of the e ffe c tive rate or the rollback rate, the Council must adopt a maximum proposed tax rate that it will consider. State law requires that the vote to adopt a pro pose d maximum rate must be a roll call vote, indicating any absences from the dais. Eve n tho ugh the Council votes to c onsider a proposed tax rate above the effective rate, the Council may, as a result of delibe ratio ns, adopt a tax rate at or below the rate stated in the published notices. The Effective Rate is $0.39364. The Rollback Rate is $0.42739. The proposed tax rate fo r FY20 17 of $0.42400 is greater than the Effe ctive Rate. Therefore, the City Council will publish notices and hold two public hearings. There are two mo tions belo w. The first is to set the maximum property tax rate and the date when the Council will vote on the adopted pro pe rty tax rate used in funding the City’s Annual Budget. The second mo tion below is to set two public hearing dates o n the property tax rate . The language inc luded in both motions is require d by State law. CITY MANAG ER’S P ROP OSED RATE: (1) Vote to set the maxi mum property tax r ate of $0.42400 cents per $10 0 val uati on, equal i ng $0.196 66 cents for Mai ntenance and Operati on and $0.2 27 34 cents for Debt Servi ce, and adopt the tax rate as an acti on i tem at the August 23, 2016 Counc i l meeti ng to be hel d at 6 p.m. at Ci ty Co unci l Chambers, at the northeast co rner o f Seventh and Mai n Streets, G eorgetow n, TX. AND (2) Set the date for 2 publ i c heari ngs on the property tax rate, as requi r e d by l aw, to be hel d on Tuesday, August 9 at 6 :00 p.m. and on Tuesday, Aug ust 16 at 6:00 p.m. at Ci ty Co unc i l Chambers, at the northeast corner o f Se venth and Mai n Streets, Ge org e tow n, TX. This is a record vo te, meaning the voting record fo r this item will be published with the required notices. This item only sets the item to be vo ted o n and does not commit Council to adopting the proposed rate . COMMENTS: The Williamson Ce ntral Appraisal District (WCAD) c ertified the tax roll on July 2 0, 2 01 6. FINANCIAL IMPACT: N/A SUBMITTED BY: Leigh Wallace, Finance Director - kj Page 98 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Forwarded fro m the Co nventi on & Vi si tors B ureau B oard Consideration and possible action to approve a contr act for sponsorshi p of The Daytri pper w i th Chet G arner, a Georgetown based business, in the amount of $60 ,00 0.0 0 -- Cari Miller, Tourism Manager ITEM SUMMARY: The Daytripper is a Texas travel show starring Chet Garner. The Daytripper has be e n a Geo rgetown based business since 2012 and is loc ate d in Do wntown Georgetown. P artnering with The Daytripper will further strengthen Georgetown’s image as a Texas to urist destination and compliments the CVB’s current advertising and public relations missio n to attrac t leisure and business travelers to Georgetown to experience and enjoy our history, c ulture, and attractions. Sponsorship of The Daytripper combines a far-re aching te levisio n presence, social media collaboration, online advertising, and personality into one package. This is o ne way to gain immediate brand recognition and goodwill ac ross numerous fronts. By sponsoring The Daytripper, Georgetown will re c e ive a prese nce in eve ry market in Te xas (and beyond). Sponsorship of The Daytripper is limited to six partners and Georgetown will be the exclusive Central Texas CVB sponsor. The Daytripper is broadcast on all 12 PBS stations in Texas and reaches 95 % o f Texas homes. The show is also broadc ast in 22 additional states. Below are the benefits Georgetown will receive by partnering with The Daytripper. Broadcast - Two 1 0-second spots built-in to all 1 3 episodes which will air and rerun multiple times. During 2 01 5 “The Daytripp er” aired a total of 3,264 time s (3,2 64 airings) x (2 spots per airing ) = 6,528 total spots. On-line & PBS App Spo ts - Two 10 seco nd spots in all 13 episodes with unlimited o n-demand viewing. Durin g 2015 “Th e Daytripp er” was streamed 76 ,39 1 times. The Daytripper Website – Georgetown Logo and Hyperlink to VisitGeorgetown.c om on e very page of The Daytrippe r website. During 2015, “The Da y trip per.co m”received 799,30 7 u niqu e pa geviews. The Daytripper Newsletter- Georgetown Logo and Hyperlink to VisitGeorgetown.com in The Daytripper Monthly Newslette r. 1 0,4 00 + subscribers, 33% op e n rate On-line Pro mo tion - Opportunities to promote visiting Georgetown on Daytripper blog, website, and social media. Three Appe arances and Hosting by Chet Garne r. Eight Daytripper t-shirts. This item was appro ved unanimously at Conventio n & Visito rs Bureau Board meeting on June 10 . FINANCIAL IMPACT: Funds are available in the CVB Operating Expense budget. SUBMITTED BY: Cari Miller, To urism Manager - BH ATTACHMENT S: Description Daytrip p er Contrac t Page 99 of 247 Underwriter Agreement – Season Eight “The Daytripper” 1 THE DAYTRIPPER SEASON 8 UNDERWRITING AGREEMENT This Underwriting Agreement dated, ______________, is made by and between: (a) Hogaboom Road, Inc. (“Hogaboom”), with offices located at 711 S. Main St., Georgetown, TX 78626 and (b) Georgetown Convention and Visitor’s Bureau of the City of Georgetown (“Underwriter”), with offices located at 103 W. 7th St., Georgetown, TX 78627. 1. Purpose: Hogaboom is currently producing Season Eight of “The Daytripper”, a Texas travel show to be aired on PBS stations and streamed online. Underwriter desires to underwrite the broadcast of Season Eight. 2. Season Eight: Season Eight of “The Daytripper” will consist of thirteen episodes. Each episode will be approximately 26 minutes and 46 seconds (26:46) in length and will be broadcast at a time to be determined by the stations and shall be rebroadcast at the stations’ discretion. 3. Underwriting Benefits: Underwriter will receive the following benefits: a. Promotional Spot: Underwriter will receive a 10-second underwriting credit (the “Credit”) appearing before and after each television broadcast and online stream of any episode from Season Eight of “The Daytripper” during the term of this Agreement. Underwriter’s Credit will appear in no particular order with the other underwriters. To produce the Credit, Underwriter shall provide to Hogaboom a high quality digital copy of Underwriter’s logo and/or high definition video footage along with its preferred language. Underwriter and Hogaboom will then mutually determine the content and form of the Credit, subject to PBS approval. b. Interactive: Underwriter will be receive: (1) logo and hyperlink on every page of The Daytripper’s website at “thedaytripper.com; (2) promotion of products and/or services on The Daytripper’s website in a mutually agreeable fashion; and (3) partnership promotion through social media channels (Facebook, Twitter, Instagram, and YouTube). c. Personal Appearances: Underwriter will receive three personal appearances from “The Daytripper” host Chet Garner at mutually agreeable dates and locations. Travel and expenses will be covered by and paid separately by Underwriter. d. Print and Press Materials: Underwriter will be recognized as a sponsor in all print materials and/or press materials relating to Season Eight, if any, distributed during the term of this Agreement. Page 100 of 247 Underwriter Agreement – Season Eight “The Daytripper” 2 e. T-shirt: Underwriter will receive logo placement on Season Eight T-shirt. f. Exclusivity: Underwriter shall be the exclusive underwriter for the broadcast of Season Eight of “The Daytripper” in the category of destination marketing organizations in Central Texas and the Texas Hill Country. 4. Payment: In consideration for the Underwriting Benefits, Underwriter shall pay Hogaboom a total of $60,000 (sixty thousand dollars) payable upon mutually agreeable terms. 5. Term: The "Term" of this Agreement shall be from the signing of this Agreement until September 30, 2017 with benefits for Underwriter commencing around October 1, 2016. Each party shall have the right to terminate earlier based on a material breach by the other party that is not cured appropriately under the circumstance. 6. Approval: Each party shall have prior approval over any use of its name and marks by the other party. Such prior approval does not extend to the use of Underwriter’s logo or credit on the internet due to the quickly changing nature of this medium. However, Underwriter will have the right the object to the use of its name and/or marks at any time and the parties’ will quickly resolve any issues. All aspects of Underwriter’s sponsorship of “The Daytripper”, including the Credit, shall be in accordance with PBS guidelines and policies and FCC rules and regulations in force at the time of broadcast. 7. Ownership: Hogaboom, and/or its affiliates, shall own all rights to “The Daytripper” program, trademarks, copyrights, and other intellectual property. Underwriter shall retain all rights to Underwriter’s trademarks and intellectual property used in connection with “The Daytripper” program. 8. Miscellaneous: Each party represents and warrants that any materials it furnishes for use by the other party do not infringe or violate the rights of any third party. To the extent allowed under State law, each party shall indemnify the other from any damages due to a third party claim arising out of a breach of this Agreement. All notices and requests for approval under this Agreement shall be sent to the other party via mail or email with an actual acknowledgement of receipt by the recipient. In the event that production or broadcast of the Program is delayed or canceled by reason of an act of God or other “force majeure” beyond Hogaboom's control, Hogaboom shall work with the stations to arrange for broadcast distribution as soon as practicable, but such shall not constitute a breach. The persons signing this Agreement warrant that they have the authority to do so and are voluntarily entering into this Agreement. This Agreement constitutes the entire agreement between the Parties and if a term is not in this document it is not part of the parties’ agreement. Changes to this Agreement may be made only in writing and signed by both parties. This Agreement shall be construed by Texas law. Page 101 of 247 Underwriter Agreement – Season Eight “The Daytripper” 3 (Continued from previous page) ACCEPTED AND AGREED Hogaboom Road, Inc. Signature:___________________________ Name:______________________________ Title:_______________________________ Date:_______________________________ City of Georgetown Signature:____________________________ Name:_______________________________ Title:________________________________ Date:________________________________ Page 102 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Publ i c Heari ng and Fi rst Readi ng of an Ordinanc e to rezone approximately 2.3 ac r e s in the Lewis J. Dyches Survey, located at 4 Si erra Way Street, from the Agriculture (AG) District to the Industrial (IN) District -- Sofia Nelson, CNU- A, Planning Dire c to r (acti on requi red) ITEM SUMMARY: B ackground: The applicant has re quested to rezone the developed 2 .3 ac re lot from Agriculture (AG) District, assigned at time of annexation in 2 00 8, to Industrial (IN) District in o rde r to make the existing use of the pro perty conforming. Publ i c Comment: To date, no written public co mments have been received. Staff Recommendati o n: Staff recommends appro val o f the request to rezo ne the 2 .3 acre lot to the IN Distric t. Pl anni ng and Zoni ng Commi ssi on Recommendati o n: At the ir July 5th, 2016 meeting, the Planning and Zoning Commissio n unanimously recommended to the City Council approval (4-0) to re zo ne the 2.3 acres to the IN distric t. Commissioners Pitts, Bargaine r and Rankin were absent. FINANCIAL IMPACT: No studies have be e n completed at this time. SUBMITTED BY: Carolyn Horne r, AICP, and So fia Nelson, CNU-A, P lanning Director ATTACHMENT S: Description S taff Report Attachment 1 - Lo catio n Map Attachment 2 - F uture Land Us e Map Attachment 3 - Zo ning Map Attachment 4 - IN Dis tric t Uses and Standard s Ordinanc e Exhib it A Exhib it B Page 103 of 247   Georgetown Planning Department Staff Report    REZ‐2016‐019 Hache Investments Building‐AG to IN Page 1 of 6  Report Date:  July 1, 2016  File No:   REZ‐2016‐019  Project Planner:       Carolyn Horner, AICP, Planner    Item Details  Project Name: Hache Investments Building   Location: 4 Sierra Way   Total Acreage: 2.3 acres  Legal Description: Georgetown Technology Park Lot  4  Existing Use: Manufacturing  Existing Zoning: Agriculture (AG)  Proposed Zoning: Industrial (IN)  Future Land Use: Community Commercial and  Employment Center      Overview of Applicant’s Request  The applicant has requested to rezone the subject property from the Agriculture (AG) District  to the Industrial (IN) District.  The property was annexed in 2008 and assigned the default AG  District. The requested rezoning would place the existing uses into the proper zoning district  and correct their legal non‐conforming status.  No new construction is proposed at this time.  Site Information  Location:    The subject property is located on the east side of the northbound IH‐35 frontage road  between Blue Springs Boulevard and Fox Drive.  See Exhibit 1.      Physical Characteristics:   The subject property, which is within the Georgetown Technology Park subdivision, is  generally flat with no physical features.  All lots currently gain access from Sierra Way, a cul‐ de‐sac from the interstate frontage road.      Inner Loop Sierra Way Page 104 of 247 Planning Department Staff Report  REZ‐2016‐019 Hache Investments Building‐AG to IN Page 2 of 6      Surrounding Properties:    The subject property is in the platted Georgetown Technology Park, otherwise known as an  ‘industrial or business park’, despite the various zoning designations within it.  Surrounding  this subdivision is largely undeveloped parcels awaiting development.  To the south is a mix  of vacant land and several higher‐intensity commercial type uses on the frontage road.  The  area to the east is comprised of very large properties in the City’s ETJ, and are vacant or used  as rural residential.  North of Sierra Way are two mobile/manufactured home sales businesses.     Location Zoning Future Land Use Existing Use  North  AG, Agriculture Community Commercial,  Employment Center Commercial Use  South  AG, Agriculture Community Commercial,  Employment Center Industrial Use  East  AG, Agriculture Employment Center Vacant/Industrial  West  AG, Agriculture /  IN, Industrial Community Commercial  Industrial Use  Page 105 of 247 Planning Department Staff Report  REZ‐2016‐019 Hache Investments Building‐AG to IN Page 3 of 6  Property History  The subject property is part of the Georgetown Technology Park Subdivision, platted in 1992.  The property was annexed into the City on December 9, 2008 (Annexation Ordinance 2008‐ 083) as part of a large involuntary annexation that totaled 69 acres out of the F.A. Hudson and  L.J. Dyches Surveys and portions of the B&T Subdivision and Georgetown Technology Park  Subdivision.    2030 Comprehensive Plan   The subject property is located within a future land use transition area of Employment Center  and Community Commercial.  The Community Commercial designation is intended for areas  that accommodate retail, professional offices, and service oriented business activities that  serve more than one residential neighborhood.  The Employment Center designation is for  tracts of undeveloped land located at strategic locations, which are designated for well  planned, large scale employment and business activities.  The existing development is much  more a “business” park than an “industrial” park, hosting mostly indoor and ‘clean’ industrial  type uses.  The subject property is developed with professional office uses.      The 2030 Plan Growth Tier Map designation is Tier 1A (Developed, Redeveloping), which is  the portion of the City where infrastructure systems are in place, or can be economically  provided, and where the bulk of the City’s growth should be guided over the near term.    Utilities  Electric, water and wastewater are served by the City of Georgetown.  It is anticipated that  Page 106 of 247 Planning Department Staff Report  REZ‐2016‐019 Hache Investments Building‐AG to IN Page 4 of 6  there is adequate capacity to serve this property either by existing capacity or developer  participation in upgrades to infrastructure.  Transportation  The subject property has 245 feet of street frontage on Sierra Way and approximately 345 feet  of frontage on Courtney Drive. Sierra Way is a cul‐de‐sac street only accessible from the  north‐bound IH‐35 frontage road, just south of the Exit 259 North‐bound ramp.  Courtney  Drive diverts off of Sierra Way to the south, and will likely connect to a large undeveloped  parcel to the south that is currently in the City’s ETJ.  A Traffic Impact Analysis (TIA) was not  deemed necessary for review of this rezoning, as the site is largely developed, and no new  development has been proposed following this rezoning.  Should any new development be  proposed in the future, and a site plan is submitted, trip generation will be reviewed at that  time, possibly triggering the need for a TIA.  Proposed Zoning District  The IN District is intended to provide a location for manufacturing and industrial activities  that may generate some nuisances.  Traffic generation often includes heavy vehicles, making  access to an arterial or freeway necessary.  Unless separated by a major roadway, the district is  not appropriate adjacent to any residential areas.  Typical uses would include contractor  services, manufacturing and warehousing operations, and materials and natural resource  processing. General (Professional) office uses are permitted by right in this district.  See  Exhibit 4 for a full list of uses.  Staff Analysis  Located within a future land use transition area, the properties located along Sierra Way most  closely reflect the goals of the Employment Center land use designation. Given the existing  type of development and the incongruity with the base Agriculture zoning, the proposed  district is appropriate and supportive of the City’s larger goals for job creation that these two  categories encompass.     Specifically, Goal 1, Policies and Actions 1.A, states “Encourage a balanced mix of residential,  commercial, and employment uses at varying densities and intensities, to reflect a gradual transition  from urban to suburban to rural development.” The rezoning will allow compatible uses  consistent with the development patterns in the area.                Page 107 of 247 Planning Department Staff Report  REZ‐2016‐019 Hache Investments Building‐AG to IN Page 5 of 6    UDC Section 3.06.030 establishes the following criteria for zoning changes:  The application is complete and the  information contained within the application is  sufficient  and correct enough to allow  adequate review and final action  An application must provide the necessary  information to review and make a knowledgeable  decision in order for staff to schedule an  application for consideration by P&Z and City  Council.  This application was reviewed by staff  and deemed to be complete.  The zoning change is consistent with the  Comprehensive Plan  The proposed zoning change is consistent with the  Future Land Use of the 2030 Comprehensive Plan.   The zoning change promotes the health, safety  or general welfare of the City and the safe  orderly, and healthful development of the City  The zoning change request promotes health, safety  and general welfare of the City because it supports  orderly development by placing zoning districts in  the appropriate location.    The zoning change is compatible with the  present zoning and conforming uses of nearby  property and with the character of the  neighborhood  The proposed rezoning is compatible with the  surrounding zoning districts, specifically those  located to the north and south of the site.  The property to be rezoned is suitable for uses  permitted by the District that would be applied  by the proposed amendment.  The uses allowed in the RS District are appropriate  at this location given the majority of the existing  land uses surrounding the property are single  family residential.       Findings:  Based on the information presented, staff has made the following findings:    1. The Industrial District is the appropriate non‐residential district for an existing  industrial/business park.  Most of the other lots on Sierra Way that have been annexed;  most  have been rezoned to the Industrial District, and therefore this rezoning request will  be consistent with the surrounding area in terms of the types of uses that will be  established.  2. The property is located on a cul‐de‐sac, with access from the northbound Interstate 35  frontage road. The surrounding uses are non‐residential, with limited traffic onto the  frontage road.  3. The subject property is developed with a building and uses that would be permissible in  the proposed district, alleviating legal non‐conforming status of the existing uses.  4. The rezoning request will help rectify incongruous zoning district situations as seen in this  subdivision.  Staff Recommendation  Staff recommends approval of the request rezoning based on the above‐mentioned findings.  Page 108 of 247 Planning Department Staff Report  REZ‐2016‐019 Hache Investments Building‐AG to IN Page 6 of 6  Public Comments  As required by the Unified Development Code, all property owners within a 200 foot radius  of the subject property and within City jurisdiction (6 notices mailed) were notified of the  rezoning application, a legal notice advertising the public hearing was placed in the Sun  Newspaper and a sign was posted on‐site.   To date, staff has received zero phone calls, and zero written or verbal comments in support  or against the applicant’s rezoning proposal.  Attachments  Attachment 1 – Location Map  Attachment 2 – Future Land Use   Attachment 3 – Zoning Map   Attachment 4 – Industrial District Standards & Uses  Page 109 of 247 §¨¦35 Leander R d W e s ti n g h o u s e R d S E I n n e r L o o p SamHoustonAve ")1460 Tera vi s t a X i n g Teravista C l u b D r W e s ti n g h o u s e R d R a b b it H I l l R d REZ-2016-019Exhibit #1 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1Mi Le ge ndSiteParcelsCity LimitsGeorgetown ETJ Page 110 of 247 \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \ \ \ \ \ \ \ \\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ S E I N N E R L O O P BLUE S P R I N G SBLVD §¨¦35 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Future Land Use / Overall Transportation Plan Exhibit #2 REZ-2016 -019 Legend Thoroughfare Future Land Use Institutional Regional Commercial Community Commercial Em ployment Center Low Density Residential Mining Mixed Use Community Mixed Use Neighborhood Center Moderate Density Residential Open Space Specialty Mixed Use Area Ag / Rural Residential Existing Collector Existing Freeway Existing Major Arterial Existing Minor Arterial Existing Ramp Proposed Collector Proposed Freeway Propsed Frontage Road Proposed Major Arterial Proposed Minor Arterial Proposed Railroad High Density Residential 0 ¼½¾Mi LegendSiteParcelsCity Lim itsGeorgetown ETJ Page 111 of 247 S E I N N E R L O O P BLUE S P R I N G SBLVD §¨¦35 Zoning InformationREZ-2016-019Exhibit #3 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only Le ge ndSiteParcelsCity LimitsGeorgetown ETJ ¯ 0 ¼½¾MiPage 112 of 247 Maximum Building Height = 45 feet Front Setback = 25 feet Bufferyard = 30 feet with a fence and  Side Setback = 10 feet     plantings adjacent to AG, RE, RL, Side Setback to Residential = 25 feet     RS, TF, MH, TH, MF‐1, or MF‐2 Rear Setback = 10 feet     districts Rear Setback to Residential = 35 feet Allowed by Right Subject to Limitations Special Use Permit (SUP) Required Emergency Services Station Business/Trade School Correctional Facility Government/Post Office Animal Shelter Hospital Naure Presreve/Community Garden Neighborhood Public Park Psychiatric Hospital Food Catering Services Kennel Substance Abuse Clinic Athletic Facility, Indoor/Outdoor Self‐Storage, Outdoor Cemetery, Columbaria, Mausoleum, Driving Range Heliport         or Memorial Park Medical Complex Wireless Transmission Facility (>40') Sexually Oriented Business General Office Seasonal Product Sales Major Event Entertainment Integrated Office Center Farmer's market, Temporary Indoor Firing Range Data Center Mobile/Outdoor Food Vendor Fuel Sales Artisan Studio/Gallery Business Offices, Temporary Car Wash Small Engine Repair Concrete Products, Temporary Airport Self‐Storage, Indoor Construction Field Office Wireless Transmission Facility (<41') Commercial Document Storage Construction Staging, Off‐site Resource Extraction Event Catering/Equipment Rental Parking Lot, Temporary Oil Refinery/Distribution Furniture Repair/Upholstery Waste Related Uses Heavy Equipment Sales/Repair Wrecking, Scrap, Salvage yard Pest Control/Janitorial Services Office/Showroom Wholesale Showrooms Stone/Dirt/Mulch Sales Yards Manufactured Housing Sales Car Sales/Rental/Leasing Facility Car Parts/Accessories Sales, Outdoor Car Repair/Service, Limited Bus Barn Parking Lot, Off‐site/Commercial Park‐n‐Ride Facility Private Transport Service      Dispatch Facility Rail or Transit Yard Allowed by Right con't Transit Passenger Terminal Utilities (Minor, Intermediate, Major) Truck Terminal Contractor Services, Limited/General Lumber Yard Movie Production Dry Cleaning/Laundry Plant Printing/Publishing Asphalt/Concrete Batch Plant Office/Warehouse Recycling Collection Center Manufacturing, Processing and Meat Market          Assembly, Limited/General Taxidermist Warehouse/Distribution, Limited/General INDUSTRIAL (IN) DISTRICT District Development Standards Specific Uses Allowed within the District Page 113 of 247 Ordinance Number: ___________________ Page 1 of 2 Description: Lot 4, Georgetown Technology Park, from AG to IN Case File Number: REZ-2016-019 Date Approved: __________________ Exhibits A-B Attached ORDINANCE NO. _____________________    An Ordinance of the City Council of the City of Georgetown, Texas,  amending part of the Official Zoning Map to rezone approximately 2.3 acres,  located in the Lewis J. Dyches Survey, platted as Lot 4 of the Georgetown  Technology Park subdivision, from the Agriculture (AG) District to the  Industrial (IN) District, also known as Hache Investments Building;  repealing conflicting ordinances and resolutions; including a severability  clause; and establishing an effective date.  Whereas, an application has been made to the City for the purpose of amending the  Official Zoning Map, adopted on the 12th day of June, 2012, for the specific Zoning District  classification of the following described real property (ʺThe Propertyʺ):  Lot 4 of the Georgetown Technology Park subdivision, as recorded in Document  Number 1992011352 of the Official Public Records of Williamson County, Texas,  hereinafter referred to as ʺThe Propertyʺ; and  Whereas, public notice of such hearing was accomplished in accordance with State Law  and the City’s Unified Development Code through newspaper publication, signs posted on the  Property, and mailed notice to nearby property owners; and   Whereas, the Planning and Zoning Commission, at a meeting on July 5, 2016, held the  required public hearing and submitted a recommendation of approval to the City Council for  the requested rezoning of the Property; and  Whereas, the City Council, at a meeting on July 26, 2016, held an additional public  hearing prior to taking action on the requested rezoning of the Property.  Now, therefore, be it ordained by the City Council of the City of Georgetown, Texas,  that:  Section 1.  The facts and recitations contained in the preamble of this Ordinance are  hereby found and declared to be true and correct, and are incorporated by reference herein and  expressly made a part hereof, as if copied verbatim.  The City Council hereby finds that this  Ordinance implements the vision, goals, and policies of the Georgetown 2030 Comprehensive  Plan and further finds that the enactment of this Ordinance is not inconsistent or in conflict with  any other policies or provisions of the 2030 Comprehensive Plan and the City’s Unified  Development Code.    Section 2.  The Official Zoning Map, as well as the Zoning District classification(s) for the  Property is hereby amended from the Agriculture District (AG) to the Industrial District (IN), in  accordance with the attached Exhibit A (Location Map) and Exhibit B (Legal Description) and  incorporated herein by reference.  Page 114 of 247 Ordinance Number: ___________________ Page 2 of 2 Description: Lot 4, Georgetown Technology Park, from AG to IN Case File Number: REZ-2016-019 Date Approved: __________________ Exhibits A-B Attached Section 3.  All ordinances and resolutions, or parts of ordinances and resolutions, in  conflict with this Ordinance are hereby repealed, and are no longer of any force and effect.  Section 4.  If any provision of this Ordinance or application thereof to any person or  circumstance shall be held invalid, such invalidity shall not affect the other provisions, or  application thereof, of this Ordinance which can be given effect without the invalid provision or  application, and to this end the provisions of this Ordinance are hereby declared to be  severable.  Section 5.  The Mayor is hereby authorized to sign this ordinance and the City Secretary  to attest.  This ordinance shall become effective in accordance with the provisions of state law  and the City Charter of the City of Georgetown.    APPROVED on First Reading on the 26th day of July, 2016.  APPROVED AND ADOPTED on Second Reading on the 9th day of August, 2016.    THE CITY OF GEORGETOWN:     ATTEST:      ______________________      _________________________  Dale Ross        Shelley Nowling  Mayor         City Secretary        APPROVED AS TO FORM:      ______________________  Charlie McNabb  City Attorney  Page 115 of 247 §¨¦35 Leander R d W e s ti n g h o u s e R d S E I n n e r L o o p SamHoustonAve ")1460 Tera vi s t a X i n g Teravista C l u b D r W e s ti n g h o u s e R d R a b b it H I l l R d REZ-2016-019Exhibit #1 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1Mi Le ge ndSiteParcelsCity LimitsGeorgetown ETJ Page 116 of 247 Page 117 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Second Readi ng of an Ordinance to rezone 67.8 64 acres o f the William Addison Surve y lo cated at 801 Carl son Cove from the Agriculture (AG) District to the Reside ntial Single-Family (RS) District -- So fia Nelson, CNU-A, Planning Director (acti on r e qui red) ITEM SUMMARY: B ackground: The applicant has requested to rezone the site from the Agric ulture (AG) District to the Residential Single -Family (RS) District. The requested rezoning would provide the property owners permitted uses allo wed by the RS District. Publ i c Comment: To date, staff has received a to tal of seven phone calls fro m ne ighbo ring property o wners and pro spective ho me buye rs requesting general informatio n about the rezo ning application. Staff received one e mail in support of the requested RS District. Staff has also received one email and one letter in oppositio n to rezoning the pro perty fo r reside ntial purpose s. Staff received an additional three le tters in oppositio n to the rezoning request after the last City Council meeting on July 12, 2016. Staff Recommendati o n: Staff recommends approval of the request to rezo ne the 6 7.8 64 acre tract to the RS District. Pl anni ng and Zoni ng Commi ssi on Recommendati o n: At their June 21 , 2016 meeting, the Planning and Zo ning Commission recommended to the City Council approval (4 -0) to rezone the 67 .86 4 acres to the RS District. Co mmissioners P itts, Bargainer, and Rankin were absent. Ci ty Counci l Fi rst Readi ng Acti on: At their July 12 , 20 16 meeting, the City Council voted unanimously (7-0) to appro ve the request to rezone the 67 .86 4 acres to the RS District. FINANCIAL IMPACT: No studies have be e n completed at this time. SUBMITTED BY: Juan Enriquez, Planner, and Sofia Nelson, CNU-A, Planning Director ATTACHMENT S: Description S taff Report Attachment 1 - Lo catio n Map Attachment 2 - F uture Land Us e Map Attachment 3 - Zo ning Map Attachment 4 - R S Dis trict Development Stand ard s and P ermitted Land Us es P ublic Co mment Letters Ordinanc e Exhib it A - Loc ation Map Exhib it B - Legal Des c rip tion Page 118 of 247 Georgetown Planning Department Staff Report Carlson Tract Rezoning Page 1 of 4 Report Date: June 16, 2016 File No: REZ-2016-017 Project Planner: Juan Enriquez, Planner Item Details Project Name: Carlson Tract REZ Project Address: 801 Carlson Cove Total Acreage: 67.864 acres Legal Description: 67.864 acres of the William Addison Survey Applicant: Peter Verdicchio, RLA, LEED AP, ASLA Property Owner(s): Durwood & Beverly Thompson Contact: Peter Verdicchio, RLA, LEED AP, ASLA Overview of Applicant’s Request The applicant has requested to rezone the site from the Agriculture (AG) District to the Residential Single-Family (RS) District. The requested rezoning would provide the property owners with permitted uses allowed by the RS District. Site Information Location: The subject site is located east of SE Inner Loop and west of SH 130, immediately south of Churchill Farms neighborhood at the terminus of Reinhardt Boulevard and Autumn Trail. Physical Characteristics: The subject site is 67.864 acres in size and is generally flat with no identifiable features on the tract. Currently, the site has access through Carlson Cove to Rockride Lane. There are no heritage trees located on-site. Surrounding Properties: Location Zoning Future Land Use Existing Use North RS Moderate Density Residential Single-Family Residences South RS Mixed Use Community Single-Family Residences East AG Mixed Use Community/Institutional Single-Family Residences/Undeveloped Land West PF Mixed Use Community Undeveloped Williamson County Land Property History The 67.864 acre property was annexed into the City on November 28, 2006 by Ordinance No. 2006-123. At the time of annexation into the City, the default AG District was assigned. The property is currently vacant and undeveloped. Page 119 of 247 Planning Department Staff Report Carlson Tract Rezoning Page 2 of 4 2030 Comprehensive Plan Future Land Use: The 2030 Future Land Use category for this subject site is Mixed Use Community. The Mixed Use Community category is described in the 2030 Comprehensive Plan as appropriate for larger scale, creatively planned communities, where a mix of residential types and densities are complemented by supporting retail and small to medium scale office development. This category also encourages more compact, sustainable development patterns that reduce auto trips, increase connectivity and encourage walking and use of transit. Growth Tier: The 2030 Plan Growth Tier Map designation is Tier 1B (Developing). Tier 1B areas are presently in the City limits in areas that are generally under-served by infrastructure and where such service and facilities will likely be needed to meet the growth needs of the City once Tier 1A approaches buildout over the next ten years. Transportation The site’s primary inbound and outbound access is currently through Carlson Cove (private drive) via Rockride Lane. Trip generation will be reviewed with the subdivision application, possibly triggering the need for a TIA at that time. Utilities Water and wastewater are served by the City of Georgetown. Electric service is provided by the City of Georgetown and ONCOR. It is anticipated that there is adequate capacity to serve this property either by existing capacity or developer participation in upgrades to infrastructure. Proposed Zoning District The applicant has requested Residential Single-Family (RS) zoning on this property. The RS District is intended for areas of medium density with a minimum lot size of 5,500 square feet. The RS District contains standards for development that maintain single-family neighborhood characteristics. Staff Analysis As part of the 2030 Comprehensive Plan adoption process, the land use element of the plan identified a number of land use goals, policies and actions. The following goals and action statements are the most relevant to this request: The subject property is located within the Future Land Use category of Mixed Use Community that encourages a mixture of uses. In this case, the proposal is to build single family residences which would function as an extension of the established Churchill Farms residential neighborhood to the north and Saddlecreek neighborhood to the south. The SE Inner Loop Page 120 of 247 Planning Department Staff Report Carlson Tract Rezoning Page 3 of 4 corridor is an area that includes employment centers and government related centers. The proposed rezone will contribute to the well balanced mix of uses in the area. • Goal 4: “Maintain and strengthen viable land uses and land use patterns (e.g. stable neighborhoods, economically sound commercial and employment areas). o The policies listed under this goal include “minimize impacts of encroachment by incompatible land uses.” The property will fill in an area anticipated to be developed for single-family uses and provide an extension of single-family residences located to the north, east and south of the site. The rezoning will also allow compatible uses consistent with the development patterns in the area. The proposed rezoning to RS, along with the associated development standards, directly helps to implement the above goals of providing compatible land uses. As development patterns continue to extend in the southeast portion of the City, the need for a balanced mix of uses is necessary in order to achieve a balanced and compatible community. UDC Section 3.06.030 establishes the following criteria for zoning changes: The application is complete and the information contained within the application is sufficient and correct enough to allow adequate review and final action An application must provide the necessary information to review and make a knowledgeable decision in order for staff to schedule an application for consideration by P&Z and City Council. This application was reviewed by staff and deemed to be complete. The zoning change is consistent with the Comprehensive Plan The proposed zoning change is consistent with the Future Land Use of the 2030 Comprehensive Plan The zoning change promotes the health, safety or general welfare of the City and the safe orderly, and healthful development of the City The zoning change request promotes health, safety and general welfare of the City because it supports orderly development by placing zoning districts in the appropriate location. The zoning change is compatible with the present zoning and conforming uses of nearby property and with the character of the neighborhood The proposed rezoning is compatible with the surrounding zoning districts, specifically those located to the north and south of the site. The property to be rezoned is suitable for uses permitted by the District that would be applied by the proposed amendment. The uses allowed in the RS District are appropriate at this location given the majority of the existing land uses surrounding the property are single family residential. Page 121 of 247 Planning Department Staff Report Carlson Tract Rezoning Page 4 of 4 Findings Based on all the information presented, staff has made the following findings: 1. The Future Land Use category of Mixed Use Community supports the RS District at this location since this category is intended for large tracts of undeveloped open land where residential uses will complement the future non-residential development anticipated along SE Inner Loop. 2. The requested zoning at this site meets the intent of the RS District as the property will provide moderate density single-family residences. The RS District contains standards for development that maintain single-family neighborhood characteristics similar to the Churchill Farms and planned Saddlecreek neighborhoods to the north and south. 3. The uses allowed in the RS District are appropriate at this location given the majority of the surrounding properties that are east of SE Inner Loop are single-family residences. 4. There is currently sufficient capacity within the City utilities to accommodate the potential development resulting from the proposed rezoning from the AG to RS District at this location. Staff Recommendation Staff recommends approval of the applicant’s request based on the above-mentioned findings. Public Comments As required by the Unified Development Code, all property owners within a 200 foot radius of the subject property that are located within City limits were notified of the rezoning application (62 notices mailed), a legal notice advertising the public hearing was placed in the Sun Newspaper (June 5, 2016) and signs were posted on-site. To date, staff has received a total of seven (7) phone calls from neighboring property owners and prospective home buyers requesting general information about the rezoning application. Staff received one email from an affected property owner in support of the requested RS District. Attachments Attachment 1 – Location Map Attachment 2 – Future Land Use Map Attachment 3 – Zoning Map Attachment 4 – RS District Development Standards and Permitted Land Uses Page 122 of 247 §¨¦35 §¨¦35 Willia msDr W University Ave E University Ave NAustinAve Southw este r n B l v d E U n i v e r s it y A v e NE I n n e r L o o p SE I n n e r L o o p NColleg e StRiveryBlvd N A u s t i n A v e W olfRanchPkw y S a m H o u s t o n Ave ¬«29¬«130 ¬«130 SE Inner Lo o p SamHoustonAve South w est e r n B l v d ")1460 S A u s t i n A v e R o c k r i d e L n ")971 EMorro w St N orth w estBlvd ")1460 R o c k r i d e L n §¨¦35 (R iver/Stream) REZ-2016-017 Attachment #1 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1 1.5Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 123 of 247 S O U THW E S T E R N B L V D E U N I V E R S I T Y A V E N E I N N E R L O O P SO U T H W E S T E R N B L V D ¬«130 SE I N N E R L O O P E UNIVERSITY A V E Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Future Land Use / Overall Transportation Plan Attachment #2 REZ-2016-017 Legend Thoroughfare Future Land Use Institutional Regional Commercial Community Commercial Employment Center Low Density Residential Mining Mixed Use Community Mixed Use Neighborhood Center Moderate Density Residential Open Space Specialty Mixed Use Area Ag / Rural Residential Existing Collector Existing Freeway Existing Major Arterial Existing Minor Arterial Existing Ramp Proposed Collector Proposed Freeway Propsed Frontage Road Proposed Major Arterial Proposed Minor Arterial Proposed Railroad High Density Residential 0 ¼½¾Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 124 of 247 S O U THW E S T E R N B L V D E U N I V E R S I T Y A V E N E I N N E R L O O P SO U T H W E S T E R N B L V D ¬«130 SE I N N E R L O O P E UNIVERSITY A V E Zoning InformationREZ-2016-017 Attachment #3 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only LegendSiteParcelsCity LimitsGeorgetown ETJ ¯ 0 ¼½¾MiPage 125 of 247 Minimum Lot Size = 5,500 square feet Front Setback = 20 feet Bufferyard = 10 feet with plantings Minimum Lot Width = 45 feet Side Setback = 6 feet     when non‐residential develops Maximum Building Height = 35 feet Rear Setback = 10 feet     adjacent to residential Allowed by Right Subject to Limitations Special Use Permit (SUP) Required Group Home (<7 residents)Church (with columbarium)Accessory Dwelling Unit Single‐family Detached Day Care (family home)Activity Center (youth/senior) Utilities (Minor)Golf Course Bed and Breakfast (with events) Home Based Business Cemetary/Columbaria/Mausoleum Nature Preserve/Community Garden Community Center Neighborhood Amenity Center Day Care (Group) Park (Neighborhood)Emergency Services Station School (Elementary)General Office Single‐family Attached Halfway House Utilities (Intermediate)Hospice Facility Wireless Transmission Facility (<41') Rooming/Boarding House School (Middle) Residential Single‐Family (RS) District District Development Standards Specific Uses Allowed within the District Attachment #4 Page 126 of 247 1 Juan Enriquez From:David Morse <dmorse2112@gmail.com> Sent:Monday, June 06, 2016 10:19 AM To:Juan Enriquez Subject:Re: Project Case # REZ-2016-017 OK, great, in that case: I am fully supportive of rezoning this land from agriculture to residential single-family. If this request is approved by the city council on July 12, do you have any idea how long it will take before homes will start to be built on this land? Thanks, David On Mon, Jun 6, 2016 at 10:12 AM, Juan Enriquez <Juan.Enriquez@georgetown.org> wrote: FYI – You can submit any comments back to me through email. You don’t have to send it through the mail if you don’t  want to.     From: David Morse [mailto:dmorse2112@gmail.com]   Sent: Monday, June 06, 2016 9:03 AM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Re: Project Case # REZ‐2016‐017 Thank you sir! On Mon, Jun 6, 2016 at 8:59 AM, Juan Enriquez <Juan.Enriquez@georgetown.org> wrote: Hello David,   As requested, attached is the notice of public hearing for the above‐mentioned rezoning case for your reference.     ‐Juan Enriquez   Page 127 of 247 2 From: David Morse [mailto:dmorse2112@gmail.com]   Sent: Monday, June 06, 2016 8:26 AM  To: WEB_Planning <planning@georgetown.org>; Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: RE: Project Case # REZ‐2016‐017 Planning department / Mr. Enriquez, I received the "CITY OF GEORGETOWN NOTICE OF PUBLIC HEARING" form regarding REZ-2016- 017 in the mail. Unfortunately, it has some water damage, so I was wondering if I could get another copy (Word or PDF preferably) of the "Comments from Neighboring Property Owners" form? It's page 3 from the mailed notice. Thanks, David Property Owner, 400 Belmont Dr, Georgetown TX Click here to report this email as spam. Page 128 of 247 Page 129 of 247 Page 130 of 247 Page 131 of 247 Page 132 of 247 Page 133 of 247 Ordinance Number: ___________________ Page 1 of 2 Description: Rezone 67.864 acres of the William Addison Survey Case File Number: REZ-2016-017 Date Approved: __________________ Exhibits A-B Attached ORDINANCE NO. _____________________ An Ordinance of the City Council of the City of Georgetown, Texas, amending part of the Official Zoning Map to rezone 67.864 acres out of the William Addison Survey from the AG (Agriculture) District to the RS (Residential Single-Family) District also known as Carlson Tract; repealing conflicting ordinances and resolutions; including a severability clause; and establishing an effective date. Whereas, an application has been made to the City for the purpose of amending the Official Zoning Map, adopted on the 12th day of June, 2012, for the specific Zoning District classification of the following described real property ("The Property"): 67.864 acres of the William Addison Survey, as recorded in Document Number 2016005382 of the Official Public Records of Williamson County, Texas, hereinafter referred to as "The Property"; and Whereas, public notice of such hearing was accomplished in accordance with State Law and the City’s Unified Development Code through newspaper publication, signs posted on the Property, and mailed notice to nearby property owners; and Whereas, the Planning and Zoning Commission, at a meeting on June 21, 2016, held the required public hearing and submitted a recommendation of approval to the City Council for the requested rezoning of the Property; and Whereas, the City Council, at a meeting on July 12, 2016, held an additional public hearing prior to taking action on the requested rezoning of the Property. Now, therefore, be it ordained by the City Council of the City of Georgetown, Texas, that: Section 1. The facts and recitations contained in the preamble of this Ordinance are hereby found and declared to be true and correct, and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this Ordinance implements the vision, goals, and policies of the Georgetown 2030 Comprehensive Plan and further finds that the enactment of this Ordinance is not inconsistent or in conflict with any other policies or provisions of the 2030 Comprehensive Plan and the City’s Unified Development Code. Section 2. The Official Zoning Map, as well as the Zoning District classification(s) for the Property is hereby amended from the AG District (Agriculture) to the RS District (Residential Single Family), in accordance with the attached Exhibit A (Location Map) and Exhibit B (Legal Description) and incorporated herein by reference. Section 3. All ordinances and resolutions, or parts of ordinances and resolutions, in conflict with this Ordinance are hereby repealed, and are no longer of any force and effect. Page 134 of 247 Ordinance Number: ___________________ Page 2 of 2 Description: Rezone 67.864 acres of the William Addison Survey Case File Number: REZ-2016-017 Date Approved: __________________ Exhibits A-B Attached Section 4. If any provision of this Ordinance or application thereof to any person or circumstance shall be held invalid, such invalidity shall not affect the other provisions, or application thereof, of this Ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this Ordinance are hereby declared to be severable. Section 5. The Mayor is hereby authorized to sign this ordinance and the City Secretary to attest. This ordinance shall become effective in accordance with the provisions of state law and the City Charter of the City of Georgetown. APPROVED on First Reading on the 12th day of July, 2016. APPROVED AND ADOPTED on Second Reading on the 26th day of July, 2016. THE CITY OF GEORGETOWN: ATTEST: ______________________ _________________________ Dale Ross Shelley Nowling Mayor City Secretary APPROVED AS TO FORM: ______________________ Charlie McNabb City Attorney Page 135 of 247 §¨¦35 §¨¦35 Willia msDr W University Ave E University Ave NAustinAve Southw este r n B l v d E U n i v e r s it y A v e NE I n n e r L o o p SE I n n e r L o o p NColleg e StRiveryBlvd N A u s t i n A v e W olfRanchPkw y S a m H o u s t o n Ave ¬«29¬«130 ¬«130 SE Inner Lo o p SamHoustonAve South w est e r n B l v d ")1460 S A u s t i n A v e R o c k r i d e L n ")971 EMorro w St N orth w estBlvd ")1460 R o c k r i d e L n §¨¦35 (R iver/Stream) REZ-2016-017 Exhibit A Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1 1.5Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 136 of 247 Exhibit B - Legal Description Page 137 of 247 Page 138 of 247 Page 139 of 247 Page 140 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Second Readi ng of an Ordinance to rezone approximately 13 .788 acres of the Jose ph Tho mpson Survey located at 3300 FM 2243 on the north side of FM 2243 (Le ander Road), between County Ro ad 1 76 and Weir Ranch Road fro m the Agriculture (AG) District to the Residential Estate (RE) District -- Sofia Nelson, CNU-A, P lanning Director (acti o n requi red) ITEM SUMMARY: B ackground: The applicant has re quested to rezone the 1 3.788 ac re site from the Agriculture (AG) District to the Residential Estate (RE) District. The total site is approximately 78 -acres in size but the majority of the property is located within the ETJ. The 64 acres in the ETJ are not being rezoned since there are no zoning regulations in that area. Ho wever, if the 13 .78 8 acres within the City limits are approved, the entire 7 8 acres will be platted with the same subdivision application. The requested rezoning would provide the property owners with permitted uses allowed by the RE Distric t similar in use to other residential pro perties in the surrounding are a. Publ i c Comment: To date, staff has no t received any written or verbal co mments in support or against the rezo ning request. Staff Recommendati o n: Staff recommends approval of the request to rezo ne the 1 3.7 88 acre tract to the RE District. Pl anni ng and Zoni ng Commi ssi on Recommendati o n: At their June 21 , 2016 meeting, the Planning and Zo ning Commission recommended to the City Council approval (4 -0) to rezone the 13 .78 8 acres to the RE District. Commissio ners Pitts, Bargainer, and Rankin were absent. Ci ty Counci l Fi rst Readi ng Acti on: At their July 12 , 20 16 meeting, the City Council voted unanimously (7-0) to appr o ve the request to rezone the 13 .78 8 acres to the RE District. FINANCIAL IMPACT: No studies have be e n completed at this time. SUBMITTED BY: Juan Enriquez, Planner, and Sofia Nelson, CNU-A, Planning Director ATTACHMENT S: Description S taff Report Attachment 1 - Lo catio n Map Attachment 2 - F uture Land Us e Map Attachment 3 - Zo ning Map Attachment 4 - R E Dis trict Development Stand ard s and P ermitted Land Us es Ordinanc e Exhib it A - Loc ation Map Exhib it B - Legal Des c rip tion Page 141 of 247 Georgetown Planning Department Staff Report Lost Quarry Subdivision Rezoning Page 1 of 4 Report Date: June 16, 2016 File No: REZ-2016-018 Project Planner: Juan Enriquez, Planner Item Details Project Name: Lost Quarry Subdivision REZ Project Address: 3300 FM 2243 (Leander Road) Total Acreage: 13.788 acres Legal Description: 13.788 acres of the Joseph Thompson Survey Applicant: Dan Jackson Property Owner: Vale Building Group, LLC Contact: Dan Jackson Overview of Applicant’s Request The applicant has requested to rezone the 13.788 acre site from the Agriculture (AG) District to the Residential Estate (RE) District. The total site is approximately 78-acres in size but the majority of the property is located within the ETJ. The 64 acres in the ETJ are not being rezoned since there are no zoning regulations in that area. However, if the 13.788 acres within the City limits are approved, the entire 78 acres will be platted with the same subdivision application. The requested rezoning would provide the property owners with permitted uses allowed by the RE District similar in use to other residential properties in the surrounding area. Site Information Location: The subject site is located on the north side of FM 2243 (Leander Road), between County Road 176 and Weir Ranch Road in the southwestern portion of the City. Physical Characteristics: The subject site is an irregularly shaped 13.788 portion of a larger tract totaling approximately 78 acres. The site is generally flat with trees and various shrubs throughout the tract. A tree survey will be required upon Preliminary Plat submittal to identify any protected or heritage trees. The Page 142 of 247 Planning Department Staff Report Lost Quarry Subdivision Rezoning Page 2 of 4 property has approximately 500 feet of street frontage with primary inbound and outbound access along Leander Road. Surrounding Properties: Location Zoning Future Land Use Existing Use North No zoning. ETJ. Low Density Residential Undeveloped Land South No zoning. ETJ. Mining Undeveloped Land East Agriculture Low Density Residential Undeveloped Land West Agriculture Low Density Residential Undeveloped Land Property History The 13.788 acre property was annexed into the City on December 23, 2005 by Ordinance No. 2005-101. At the time of annexation into the City, the default AG District was assigned. The property is currently vacant and undeveloped. 2030 Comprehensive Plan Future Land Use: The 2030 Future Land Use category for this site is Low Density Residential. The Low Density Residential category is described in the 2030 Comprehensive Plan as predominantly single-family neighborhoods than can be accommodated at a density between 1.1 and 3 dwelling units per gross acre. Growth Tier: The 2030 Plan Growth Tier Map designation is Tier 1B (Developing). Tier 1B areas are presently in the City limits in areas that are generally under-served by infrastructure and where such service and facilities will likely be needed to meet the growth needs of the City once Tier 1A approaches buildout over the next ten years. Transportation The site’s primary inbound and outbound access is on FM 2243 (Leander Road). Trip generation will be reviewed with the subdivision application, possibly triggering the need for a TIA at that time. Utilities Water is served by the City of Georgetown. Electric service is provided by PEC and sanitary sewer requirements will be handled by On-Site Septic Facilities (OSSF). It is anticipated that there is adequate water capacity at this time to serve this property either by existing capacity or developer participation in upgrades to infrastructure. Proposed Zoning District The applicant has requested Residential Estate (RE) zoning on this property. The RE District is intended for areas of very low density single-family residential uses. The District has a minimum Page 143 of 247 Planning Department Staff Report Lost Quarry Subdivision Rezoning Page 3 of 4 lot size of 1-acre in order to retain a rural character and is appropriate where topography or lack of public utilities and services may necessitate low density. Staff Analysis As part of the 2030 Comprehensive Plan adoption process, the land use element identified a number of land use goals, policies and actions. The following goals and action statements are the most relevant to this request: The subject property is located within the Future Land Use category of Low Density Residential that encourages single-family residences at 1.1 to 3 dwelling units per gross acre. In this case, the zoning district requested is the RE District, which allows minimum 1-acre lots. The proposed rezone will contribute to the rural character of the area and serve as a gradual transition from rural, to suburban and urban going eastbound toward the City center. • Goal 4: “Maintain and strengthen viable land uses and land use patterns (e.g. stable neighborhoods, economically sound commercial and employment areas). o The policies listed under this goal include “minimize impacts of encroachment by incompatible land uses.” The property will fill in an area anticipated to be developed for single-family uses and provide an extension of single-family development along FM 2243. The rezoning will also allow compatible uses consistent with the development patterns in the area. UDC Section 3.06.030 establishes the following criteria for zoning changes: The application is complete and the information contained within the application is sufficient and correct enough to allow adequate review and final action An application must provide the necessary information to review and make a knowledgeable decision in order for staff to schedule an application for consideration by P&Z and City Council. This application was reviewed by staff and deemed to be complete. The zoning change is consistent with the Comprehensive Plan The proposed zoning change is consistent with the Future Land Use of the 2030 Comprehensive Plan The zoning change promotes the health, safety or general welfare of the City and the safe orderly, and healthful development of the City The zoning change request promotes health, safety and general welfare of the City because it supports orderly development by placing zoning districts in the appropriate location. The zoning change is compatible with the present zoning and conforming uses of nearby property and with the character of the neighborhood The proposed rezoning is compatible with the surrounding zoning districts and rural single family development patterns. The property to be rezoned is suitable for uses permitted by the District that would be applied by the proposed amendment. The uses allowed in the RE District are appropriate at this location given the majority of the existing land uses surrounding the property are single family Page 144 of 247 Planning Department Staff Report Lost Quarry Subdivision Rezoning Page 4 of 4 homes on large rural residential lots. Findings Based on all the information presented, staff has made the following findings: 1. The Future Land Use category of Low Density Residential supports the RE District at this location since this category is intended to establish predominantly single family neighborhoods that can be accommodated at a density between 1.1 and 3 dwelling units per acre. The RE District has a minimum lot size of 1-acre, promotes rural character, and is appropriate where public utilities are limited such as this site. 2. The requested zoning at this site meets the intent of the RE District as the property will provide low density single-family residences. The intent of the RE District is to develop single family residences that will maintain rural single-family neighborhood characteristics similar to the surrounding development. 3. The uses and development standards of the RE District are appropriate at this location given the surrounding properties are primarily rural 1-acre and larger lots with single- family residences. 4. There is sufficient water capacity at this time to accommodate the proposed rezoning from AG to RE District at this location. Staff Recommendation Staff recommends approval of the applicant’s request based on the above-mentioned findings. Public Comments As required by the Unified Development Code, all property owners within a 200 foot radius of the subject property that are located within City limits were notified of the rezoning application (3 notices mailed), a legal notice advertising the public hearing was placed in the Sun Newspaper (June 5, 2016) and signs were posted on-site. To date, staff has not received any written or verbal comments in support or against the rezoning request. Attachments Attachment 1 – Location Map Attachment 2 – Future Land Use Map Attachment 3 – Zoning Map Attachment 4 – RE District Development Standards and Permitted Land Uses Page 145 of 247 W University A v e ¬«29 Leander Rd §¨¦35 §¨¦35 L e a n d e r R d Leander R d ¬«29¬«29 W University Ave W U n i v e r s i t y A v e Wa te r O akPkwy G a b r i e l F o r e s t C e d a r H o l l o w R d (R iv e r /Str e a m ) REZ-2016-018 Attachment #1 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1 1.5Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 146 of 247 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Future Land Use / Overall Transportation Plan Attachment #2 REZ-2016-018 Legend Thoroughfare Future Land Use Institutional Regional Commercial Community Commercial Employment Center Low Density Residential Mining Mixed Use Community Mixed Use Neighborhood Center Moderate Density Residential Open Space Specialty Mixed Use Area Ag / Rural Residential Existing Collector Existing Freeway Existing Major Arterial Existing Minor Arterial Existing Ramp Proposed Collector Proposed Freeway Propsed Frontage Road Proposed Major Arterial Proposed Minor Arterial Proposed Railroad High Density Residential 0 ¼½¾Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 147 of 247 RM 2243 C R 1 7 6 LEANDER RD W E I R R A N C H R D Zoning InformationREZ-2016-018 Attachment #3 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only LegendSiteParcelsCity LimitsGeorgetown ETJ ¯ 0 ¼½¾MiPage 148 of 247 District Size-min. acreage = 1 Side Setback = 10 feet Bufferyard = 10 feet with plantings Maximum Building Height = 35 feet Rear Setback = 20 feet when non-residential develops Accessory Building Height = 25 feet Front Setback = 25 feet adjacent to residential Lot width = 100 feet Allowed by Right Subject to Limitations Special Use Permit (SUP) Single-Family, Detached Home Based Business Accessory Dwelling Unit Group Home (6 residents or less)Elementary School Hospice Facility Minor Utility Services Family Home, Daycare Halfway House Religious Assembly Facilities Middle School Religious Assembly Facilities with Columbarium Group Daycare Nature Preserve or Community Garden Activity Center, Youth or Senior Neighborhood Amenity, Activity or Recreation Center Emergency Service Station Neighborhood Public Park Bed and Breakfast Golf Course Bed and Breakfast with Events Intermediate Utility Services Wireless Transmission Facility 40 feet or Less Residential Estate (RE) District District Development Standards Specific Uses Allowed within the District Page 149 of 247 Ordinance Number: ___________________ Page 1 of 2 Description: Rezone 13.788 acres of the Joseph Thompson Survey Case File Number: REZ-2016-018 Date Approved: __________________ Exhibits A-B Attached ORDINANCE NO. _____________________ An Ordinance of the City Council of the City of Georgetown, Texas, amending part of the Official Zoning Map to rezone 13.788 acres out of the Joseph Thompson Survey from the AG (Agriculture) District to the RE (Residential Estate) District also known as Lost Quarry Subdivision; repealing conflicting ordinances and resolutions; including a severability clause; and establishing an effective date. Whereas, an application has been made to the City for the purpose of amending the Official Zoning Map, adopted on the 12th day of June, 2012, for the specific Zoning District classification of the following described real property ("The Property"): 13.788 acres of the Joseph Thompson Survey, as recorded in Document Number 2008085977 of the Official Public Records of Williamson County, Texas, hereinafter referred to as "The Property"; and Whereas, public notice of such hearing was accomplished in accordance with State Law and the City’s Unified Development Code through newspaper publication, signs posted on the Property, and mailed notice to nearby property owners; and Whereas, the Planning and Zoning Commission, at a meeting on June 21, 2016, held the required public hearing and submitted a recommendation of approval to the City Council for the requested rezoning of the Property; and Whereas, the City Council, at a meeting on July 12, 2016, held an additional public hearing prior to taking action on the requested rezoning of the Property. Now, therefore, be it ordained by the City Council of the City of Georgetown, Texas, that: Section 1. The facts and recitations contained in the preamble of this Ordinance are hereby found and declared to be true and correct, and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this Ordinance implements the vision, goals, and policies of the Georgetown 2030 Comprehensive Plan and further finds that the enactment of this Ordinance is not inconsistent or in conflict with any other policies or provisions of the 2030 Comprehensive Plan and the City’s Unified Development Code. Section 2. The Official Zoning Map, as well as the Zoning District classification(s) for the Property is hereby amended from the AG District (Agriculture) to the RE District (Residential Estate), in accordance with the attached Exhibit A (Location Map) and Exhibit B (Legal Description) and incorporated herein by reference. Page 150 of 247 Ordinance Number: ___________________ Page 2 of 2 Description: Rezone 13.788 acres of the Joseph Thompson Survey Case File Number: REZ-2016-018 Date Approved: __________________ Exhibits A-B Attached Section 3. All ordinances and resolutions, or parts of ordinances and resolutions, in conflict with this Ordinance are hereby repealed, and are no longer of any force and effect. Section 4. If any provision of this Ordinance or application thereof to any person or circumstance shall be held invalid, such invalidity shall not affect the other provisions, or application thereof, of this Ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this Ordinance are hereby declared to be severable. Section 5. The Mayor is hereby authorized to sign this ordinance and the City Secretary to attest. This ordinance shall become effective in accordance with the provisions of state law and the City Charter of the City of Georgetown. APPROVED on First Reading on the 12th day of July, 2016. APPROVED AND ADOPTED on Second Reading on the 26th day of July, 2016. THE CITY OF GEORGETOWN: ATTEST: ______________________ _________________________ Dale Ross Shelley Nowling Mayor City Secretary APPROVED AS TO FORM: ______________________ Charlie McNabb City Attorney Page 151 of 247 W University A v e ¬«29 Leander Rd §¨¦35 §¨¦35 L e a n d e r Rd Leander R d ¬«29¬«29 W University Ave W U n i v e r s i t y A v e Wa te r O akPkwy G a b r i e l F o r e s t C e d a r H o l l o w R d (R iv e r /Str e a m ) REZ-2016-018 Exhibit A Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1 1.5Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 152 of 247 Exhibit B - Legal Description Page 153 of 247 Page 154 of 247 Page 155 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Second Readi ng of an Ordinance to rezone approximately 13 .24 acres in the Joseph Fish Survey, located at 4700 Wi l l i ams Dri ve , from the Local Commercial (C-1 ) and Office (OF) Districts to 9.9 9 acres o f the High Density Multifamily (MF-2 ) District and 3.256 acres of the Lo w Density Multifamily (MF-1 ) District -- Sofia Nelson, CNU-A, P lanning Director (acti o n requi red) ITEM SUMMARY: B ackground: The applicant has requeste d to rezone the subject property from the Office (OF) and Local Co mmercial (C-1 ) Districts to 3.256 acres o f the Lo w Density Multifamily (MF-1) District and 9.99 0 acres of the High Density Multifamily (MF-2) District. An approximately thre e-acre portion of the tract at the ‘hard corner ’ o f Woo dlake and Williams Drive is no t subject to this rezoning request and will remain zoned Lo cal Commercial District. Publ i c Comment: To date, thirty-four (34 ) written public comme nts have been received; 19 in oppo sition and 1 5 in favo r of the request. One ve rbal comment (pho ne) was received by staff, o pposed to the request. At the P&Z public hearing, three spoke in favor, while o ne spoke in opposition, citing concerns about increased traffic, the proper use of the subje ct property, and where multifamily uses should lo c ate. At the City Co uncil meeting, seve ral people spoke in favor of the rezoning, c iting the need for senior affordable ho using and the benefits o f a similar development built by the applicant; one person spoke in opposition, citing traffic and use concerns. Staff Recommendati o n: Staff recommends denial o f the requested rezoning. Pl anni ng and Zoni ng Commi ssi on Recommendati o n: At their June 7th, 20 16 meeting, the P lanning and Zoning Commissio n unanimously recommended appro val to the City Council (6-0) to rezone 13.24 acres fro m the Local Commercial (C-1) and Office (OF) Districts to 9.9 9 acres of the High Density Multifamily (MF-2) District and 3.25 6 acres o f the Low Density Multifamily (MF-1) District. Ci ty Counci l Fi rst Readi ng Acti on : At their June 28 th, 2 01 6 meeting, the City Council voted 4-2 to approve the re que st to rezone 13.24 acres from the Local Commercial (C-1) and Office (OF) Districts to 9.99 acres of the High Density Multifamily (MF-2) District and 3.256 acres of the Lo w Density Multifamily (MF-1 ) District. FINANCIAL IMPACT: None studied at this time. SUBMITTED BY: Mike Elabarger, Se nio r P lanner and Sofia Nelson, CNU-A, Planning Director ATTACHMENT S: Description S taff Report Attachment 1 - F uture Land Us e Attachment 2 - Exis ting Zo ning Attachment 3 - P ro p o s ed Zo ning Districts Attachment 4 - Offic e Dis tric t Standards/Us es Attachment 5 - Lo cal Commerc ial Dis tric t S tand ard s /Us es Attachment 6 - Lo w Dens ity Multifamily Dis tric t S tand ard s /Us es Page 156 of 247 Attachment 7 - High Density Multifamily Dis tric t Standards/Uses P ublic Co mment - P art 1 P ublic Co mment - P art 2 Ordinanc e - S ec ond Read ing Ordinanc e Exhibit A - Loc ation Map Ordinanc e Exhibit B - Legal Desc rip tion Page 157 of 247 Georgetown Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 1 of 8  Report Date:  June 1, 2016  File No:   REZ‐2016‐010  Project Planner: Mike Elabarger, Senior Planner   Item Details  Project Name: Merritt Heritage    Senior Village    Project Address: 4700 Williams Drive  Location: Southeast Corner of Woodlake  Drive and Williams Drive  Total Acreage: 13.24 acres  Legal Description: 13.24 acres out of the Joseph Fish  Survey   Applicant: Blake Rue  Property Owner: Andice Development Company  Contact:  Blake Rue   Existing Use: Undeveloped Land  Existing Zoning: Office (OF), 14.97 ac. / Local Commercial (C‐1), 19.20 ac.  (See Exhibits 4 & 5)  Proposed Zoning: Low Density Multifamily (MF‐1) District – 3.256 acres  (See Exhibit 6)     High Density Multifamily (MF‐2) District – 9.990 acres  (See Exhibit 7)  Future Land Use: Mixed Use Neighborhood Center (MUNC)  Growth Tier:  Tier 1A (Developed/Redeveloping Growth Area)  Overview of Applicant’s Request  The applicant has requested to rezone the subject property from the Office (OF) and Local  Commercial (C‐1) Districts to 3.256 acres of the Low Density Multifamily (MF‐1) District and  9.990 acres of the High Density Multifamily (MF‐2) District.  An approximately three‐acre  portion of the tract not subject to this rezoning request and will remain zoned Local Commercial  District.    Site Information  Location:   The property is located on the south side of Williams Drive, between Cedar Lake Boulevard and  Woodlake Drive, approximately one‐quarter mile west of the Shell/DB Woods intersection with  Williams Drive. The location is in front of the neighborhood known as Terraces of Woodlake  (subdivided as Woodlake, Phases 3 and 4), which contains about 160 homes.    Physical Characteristics:   The property has approximately 450 feet of frontage on Williams Drive, and is an “L”‐shaped  tract.  There is a stand of trees on the southern end that runs the width of the property, and  Page 158 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 2 of 8  several dumping mounds of rock and other refuse.  Nearest Williams Drive, the land is cleared.   A tree survey has not yet been submitted, and thus the number of Protected or Heritage trees is  unknown.  It is generally flat and devoid of any discernible natural features. The property is  bounded by three roadways, with Woodlake Drive and Cedar Lake Boulevard classified as  Residential Collectors, and Willliams Drive being a Major Arterial.        Surrounding Properties:    Location Zoning Districts Future Land Use Existing Use  North  Local Commercial (C‐1) and  Agriculture (AG)  Mixed Use Neighborhood  Center  Undeveloped, Office,  Commercial  South  Residential Single‐Family (RS) Low Density Residential Single‐family residential  East  Local Commercial (C‐1) and  Office (OF)  Mixed Use Neighborhood  Center Undeveloped land  West  Local Commercial (C‐1) Mixed Use Neighborhood  Center  Undeveloped land, day‐ care center  Property History  This property was formerly a part of a 34‐acre contiguous tract bounded by the Woodlake  residences and Wildwood, Woodlake, and Williams Drives.  Cedar Lake Boulevard was  extended in 2015 to Williams Drive, bisecting the tract into two halves, with this property the  western half.    A one‐thousand foot wide swath centered on Williams Drive (then FM 2338) was annexed by the  City in 1995, laying the foundation for the growth of the City westward.  That annexation  covered most, but not all, of this subject property.  The remainder, and all the property that  became the Woodlake subdivision, was subsequently annexed in 2001.    Page 159 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 3 of 8    The initial zoning of the property (post‐annexation) was completed in two parts, and included  the entire 34‐acre original tract.     Ordinance 2001‐78 rezoned a 7.431 ac portion – the area of this property nearest the  Terraces of Woodlake neighborhood (see Exhibit 3) ‐ from Agriculture (AG) to a district  known as Office and Service Uses (RM‐3).  With the adoption of the Unified Development  Code in 2003, RM‐3 became the Office (OF) District.     Ordinance 2002‐04 rezoned the remainder of this subject property from Agriculture (AG)  to Local Commercial (C‐1).      In 2013, the property was again rezoned, enlarging the Office (OF) District to 14.97 acres and  reducing the Local Commercial (C‐1) District to 19.20 acres.  Attachments 4 and 5 provide  information on the development standards and permitted uses within the existing Districts.  2030 Comprehensive Plan  Future Land Use:  The 2030 Future Land Use category for this site is Mixed Use Neighborhood Center (MUNC).  The  category extends along both sides of Williams Drive from Rivery Boulevard to just past this  property, a length of three and a half (3.5) miles.  The 2030 Plan describes the MUNC category as  applying to “smaller areas of mixed commercial use adjacent to or within existing and new residential  neighborhoods…”.  As with the other mixed use categories, the goal is to create a diversity of  integrated uses oriented in a pedestrian friendly manner that encrourages less vehicular trips.   These neighborhood‐serving mixed use areas abut roadway corridors or are often located at key  intersections that proivde limited retail goods and services to a local customer base.  Appropriate  uses in these areas might include small grocery or corner stores, coffee shops, personal services  such as beauty or barber shops, as well as small professional offices and upper‐story apartments.  Stand‐alone multifamily development may be considered appropriate within this category,  depending on the mix of adjacent uses and integration with the overall area.     The overall intent of the MUNC land use category is to identify certain areas of the City that  would support localized personal services and retail locations for neighborhood goods and  services, rather than large commercial development and high‐traffic generating uses, which are  more appropriate in nodes of the Community or Regional Commercial categories.  Just southeast  of this property is land designated for Community Commercial, one of three commercial  intersection nodes between this location and Interstate 35; See Attachement 1.    Growth Tier:  All areas of the City and ETJ are assigned a Growth Tier policy category that identifies where to  stage contiguous, compact, and incremental growth over a period of the next two decades or  more.  These Tiers dictate where the delivery of municipal services may be focused, and thus,  Page 160 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 4 of 8  where growth is desired to occur.  This property is Tier 1A, described as:     Tier 1A designates areas within the current city limits where some infrastructure systems are  in place, can be economically provided and/or will be proactively extended, and where  consolidation of the city’s development pattern is encouraged over the next 10 years through  the City’s Capital Improvement Program (CIP).  Transportation  The subject site is bound by two Residential Collector roadways, and a Major Arterial (Williams  Drive).  The Woodlake Drive intersection with Williams has been signalized for several years,  and is currently a three‐way intersection.  When Verde Vista (a Collector level roadway on the  City’s Overall Transportation Plan) is extended over to Williams Drive from it’s current  terminus, it will form the fourth leg of the intersection.      Cedar Lake Boulevard was recently extended from the Woodlake subdivision out to Williams  Drive, creating another access opportunity for the property.  Currently this is a full access  intersection, yet ultimately Williams Drive will contain a median division, thus limiting Cedar  Lake to right‐in/right‐out turning movements.      Development of the subject property will determine where driveways are located, through the  Site Development Plan review process.  Woodlake Drive and Cedar Lake Boulevard are spaced  approximately 1,150 feet apart, which could possibly allow for another driveway onto Williams  Drive that meets the current 425‐foot spacing for roadways with 50 mile‐per‐hour posted speed  limits.  The two adjacent Collector roadways would provide additional driveway access options.      A Traffic Impact Analysis may be required with the submittal of a Site Development Review  application to further analyze traffic impact, depending on the number of multifamily units that  are proposed.   Utilities  The developer will be responsible for studying the existing utility infrastructure that are below  Utility Master Plan sizes (12” lines or smaller”) prior to the next stages of the development  process (subdivision platting).  During the 2013 rezoning process, the then‐applicant received  positive information regarding the ability of the City to provide water and wastewater for a level  of development anticipated within Office and Local Commercial Districts.  Utility Evaluations  are snap‐shots in time, and are non‐binding.  That being said, it is anticipated that there is  adequate capacity to serve this property either by existing capacity or developer participation in  upgrades to infrastructure.    Proposed Zoning Districts  The Low‐Density (MF‐1) and High‐Density (MF‐2) Multifamily Districts accommodate  multifamily residential development; either detached (one or two units per structure) or attached  Page 161 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 5 of 8  (multiple units per structure).  MF‐1 allows both uses, while MF‐2 allows only attached dwelling  units.  The MF‐2 district allows for a density of up to 24 dwelling units per acre, while the MF‐1  district is limited to 14 units per acre.  Both districts may serve as transition districts between  residential neighborhoods and more intense uses and should have access to major thoroughfares  without routing traffic through lower density residential areas.  Below is an excerpt from  Attachment 3, which is the applicant’s proposed zoning districts.      The table below compares the major development standards for each proposed district under the  Unified Development Code.        Sections 6.03.080 and 6.03.090:   MF‐1 MF‐2  Maximum dwellings per Acre 14 24  Maximum dwelings per Structure 12 24  Maximum building height 35’ 45’  Minimum front/street building setback 20’ 25’  Minimum side building setback (to Residential District) 10’ (20’) 15’ (30’)  Minimum rear building setback (to Residential District) 10’ (20’) 15’ (30’)  Common Amenity and/or Recreation Areas Yes Yes  Parkland Dedication or fees‐in‐lieu Yes Yes  Bufferyards (adjacent AG, RE, RL, RS, TF, TH, MH Districts) Yes Yes  Gateway, streetyard, parking lot landscaping as applicable Yes Yes  Page 162 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 6 of 8  Staff Analysis  The subject property is located within the Mixed Use Neighborhood Center future land use  designation.  The proposed MF‐1 and MF‐2 districts are not inconsistent with the Comprehensive  Plan, specifically the future land use category, and therefore can be considered without a  Comprehensive Plan Amendment.  However, in full review of the 2030 Plan, including the goals  and policies, staff has determined the proposed zoning districts do not best implement the  community’s long‐range plans, as detailed in the Plan.     One of the overarching themes of the 2030 Plan is a reduction in automobile trips through  development that serves both residential and commercial uses.  Ideally, the Plan promotes  development that is compact with denser dwelling units intermixed with commercial retail and  services, and even employment where possible.  While true mixed use development cannot be  implemented at all locations across the city, the proximity of the services to residential uses is  key in promoting walkability and localizing personal services to reduce congestion along major  thoroughfares such as Williams Drive.      The 2030 Comprehensive Plan encourages a balanced mix of land uses through protection of  commercial properties:   Encourage a balanced mix of residential, commercial, and employment uses at varying densities  and intensities, to reflect a gradual transition from urban to suburban to rural development.   Reserve and rezone land ideally suited for long‐term commercial and employment uses and prevent  its use for residential subdivisions.    Residential development in the western part of the city and the ETJ continues to expand at a  rapid pace.  To date, non‐residential commercial and retail development that would provide  services to these residents has not yet filled in the gaps.  Over the last few years, developments  and land zoned for development in this in this quadrant of the city have largely been residential  in nature, including assisted living facilities and senior housing.  These developments serve a  need in the community, but do not further the goal of having sales‐tax and employment‐ generating investment in strategic locations. The City’s goal of bringing commercial  development to within proximity of residential will be realized by having available land for that  type of use.    Currently, retail and commercial zoning districts make up just over 9% of the land area of the  city limits.  The 2030 Future Land Use Plan aims for more like 17% of commercial and mixed‐use  area within the city limits.  As the surrounding area becomes more residential with the explosion  of Municipal Utility Districts (MUDs) and continued strong growth in the estate lot market (ETJ  one‐acre plus lots served by septic systems), prime locations for retail/service uses will become  more scarce and valuable.  To that end, the City Council has recently embarked on a major  review of retail opportunities within the community by hiring Catalyst Development out of  Dallas.  This study, paired with the Williams Drive Study currently underway, will help identify  Page 163 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 7 of 8  and create an action plan for remaining commercial development along this and other key  corridors in town.      The 2030 Plan supports multifamily development in various future land use categories,  particularly if multifamily is a component of mixed use development and/or develops as part of  a Planned Unit Development (PUD) project.  Although the specific category of ‘High Density  Residential’ is the most appropriate for the use, every category from Regional Commercial (most  intense) to Moderate Density Residential can potentially be appropriate for multifamily  development.  The driving factor is the appropriateness considering the site location, adjacent  land uses, and accommodation of infrastructure. General Findings:    Staff has reviewed the requested rezoning application and, based on the information presented,  staff offers the following findings:  1. The intent of the Mixed Use Neighborhood Center category in the 2030 Comprehensive  Plan is to provide neighborhood serving commercial uses, which may include stand alone  high density residential development as part of a mix of uses.  The proposed districts would  remove the possibility of this property serving the existing and future residents with  services and retail options as they would be an independent, stand alone residential project  with no commercial component.   2. The current zoning more than adequately fulfills the Mixed Use Neighborhood Center  category from a straight zoning district perspective.  City Council has twice approved  Office and Local Commercial zoning districts on this property, in concert with the Future  Land Use map and Comprehensive Plan.  The property, and the entire 34‐acre parent tract,  was purposefully set aside in front of a single‐family subdivision for non‐residential uses in  order to serve that neighborhood and other neighborhoods in the general vicinity.  The  subject property is suitable for this purpose due to its excellent access via two signalized  intersections with Williams Drive and connection to a future roadway that provides access  to Georgetown Village and Shell Road.  3. Rezoning this property from commercial and office to multifamily will not improve or take  steps to advance solutions to the challenge of transportation/ traffic problems along  Williams Drive, as acreage that could have provided services to residents in the area will  simply add more residents that will need to travel Williams Drive to seek retail services.  4. The siting of a multifamily development on a commercial corridor fronting a Major Arterial  does not appear to be harmonious with the stated intent of the Mixed Use Neighborhood  Center.  The proposed use of a stand‐alone multifamily development at this particular location,  removing the potential benefit of service and retail uses, builds upon an imbalance in the  overall land use mix of the corridor.    Page 164 of 247 Planning Department Staff Report Merritt Heritage Rezoning – C‐1/OF to MF‐1 and MF‐2 Page 8 of 8  5. Development under the existing zoning would make this property a destination point for  residents already within the Williams Drive corridor (and western Georgetown).  Rezoning  to enable a multifamily use would invert the traffic impacts, making the property the  beginning point of trips (to other destination points).  Staff Recommendation  Staff recommends denial of the applicant’s request based on the above‐mentioned findings.   Public Comments  As required by the Unified Development Code, all property owners within a 200‐foot radius of  the subject property and within City jurisdiction were notified of the rezoning application (34  notices mailed); a legal notice advertising the public hearing was placed in the Sun Newspaper  on May 22, 2016; and multiple signs were posted on the property.  To date, one verbal comment  against the applicant’s proposal has been received by staff.  Attachments  Attachment 1 – Future Land Use Map   Attachment 2 – Zoning Map  Attachment 3 – Proposed Zoning District Exhibit  Attachment 4 – Office District Standards & Uses  Attachment 5 – Local Commercial District Standards & Uses  Attachment 6 – High Density Multifamily District Standards & Uses  Attachment 7 – Low Density Multifamily District Standards & Uses  Page 165 of 247 WIL L I A M S D R SH E L L R D SH E L L R D DEL W E B B B L V D WIL L I A M S D R D B W O O D R D WI L L I A M S D R Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Future Land Use / Overall Transportation PlanA Attachment #1 REZ-2016-010 Legend Thoroughfare Future Land Use Institutional Regional Commercial Community Commercial Employment Center Low Density Residential Mining Mixed Use Community Mixed Use Neighborhood Center Moderate Density Residential Open Space Specialty Mixed Use Area Ag / Rural Residential Existing Collector Existing Freeway Existing Major Arterial Existing Minor Arterial Existing Ramp Proposed Collector Proposed Freeway Propsed Frontage Road Proposed Major Arterial Proposed Minor Arterial Proposed Railroad High Density Residential 0 ¼½¾Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 166 of 247 WIL L I A M S D R SH E L L R D SH E L L R D DEL W E B B B L V D WIL L I A M S D R D B W O O D R D WI L L I A M S D R Zoning InformationREZ-2016-010A Attachment #2 Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only LegendSiteParcelsCity LimitsGeorgetown ETJ ¯ 0 ¼½¾MiPage 167 of 247 Page 168 of 247 Page 169 of 247 Page 170 of 247 Page 171 of 247 Page 172 of 247 Maximum Building Height = 45 feet Front Setback = 25 feet Bufferyard = 15 feet with plantings       (0 feet for build‐to/downtown)    adjacent to AG, RE, RL, RS, TF, MH,  Side Setback = 10 feet     TH, MF‐1, or MF‐2 districts Side Setback to Residential = 15 feet Rear Setback = 10 feet Rear Setback to Residential = 25 feet Allowed by Right Subject to Limitations Special Use Permit (SUP) Required Diagnostic Center Restaurant, General Hotel, Boutique Home Health Care Services Data Center Medical Complex Medical Office/Clinic Upper‐story Residential Surgery Center Dental Office/Clinic Home‐Based Business Integrated Office Center General Office Business/Trade School Personal Services Day Care (Group/Commercial) Dry Cleaning Service, Drop‐off Only Church Printing/Mailing/Copy Services Church w/ Columbarium Banking/Financial Services Public Park, Neighborhood Commercial Document Storage Heliport Emergency Services Station Wireless Transmission Facility (<41') Government/Postal Office Seasonal Product Sales Library/Museum Farmer's Market, Temporary Social Service Facility Business Offices, Temporary Nature Preserve/Community Garden Concrete Products, Temporary Parking Lot, Off‐Site Construction Field Office Parking Lot, Commercial Construction Staging, Off‐site Park‐n‐Ride Facility Parking Lot, Temporary Utilities (Minor, Intermediate, Major) OFFICE (OF) DISTRICT District Development Standards Specific Uses Allowed within the District Page 173 of 247 Maximum Building Height = 35 feet Front Setback = 25 feet Bufferyard = 15 feet with plantings  Maximum Building Size = .5 FAR      (0 feet for build‐to/downtown)    adjacent to AG, RE, RL, RS, TF, MH,       (only applies to those uses Side Setback = 10 feet     MF‐1, or MF‐2 districts      marked with * below) Side Setback to Residential = 15 feet Rear Setback = 0 feet Rear Setback to Residential = 25 feet Allowed by Right Subject to Limitations Special Use Permit (SUP) Required Agricultural Sales* Activity Center (youth/senior) Event Facility Artisan Studio/Gallery* Bar/Tavern/Pub Meat Market Assisted Living Bed and Breakfast (with events) Multifamily Attached Automotive Parts Sales (indoor)* Business/Trade School Personal Services Restricted Banking/Financial Services* Car Wash Private Transport  Dispatch Facility Blood/Plasma Center* Church (with columbarium) Student Housing Consumer Repair* College/University Dry Cleaning Service* Commercial Recreation Emergency Services Station Community Center Farmer's Market* Dance Hall/Night Club Fitness Center* Day Care (group/commercial) Food Catering Services* Fuel Sales Funeral Home* Live Music/Entertainment General Retail* Micro Brewery/Winery General Office* Neighborhood Amenity Center Government/Postal Office Park (neighborhood/regional) Group Home (7+ residents) Pest Control/Janitorial Services Home Health Care Services* Self‐Storage (indoor only) Hospital School (Elementary, Middle, High) Hotel/Inn (excluding extended stay) Theater (movie/live) Integrated Office Center* Upper‐story Residential Landscape/Garden Sales* Wireless Transmission Facility (<41') Laundromat* Library/Museum Medical Diagnostic Center* Medical Office/Clinic/Complex* Membership Club/Lodge* Nature Preserve/Community Garden Nursing/Convalescent/Hospice Parking Lot (commercial/park‐n‐ride) Personal Services* Printing/Mailing/Copying Services* Restaurant (general/drive‐through)* Rooming/Boarding House Social Service Facility Surgery/Post Surgery Recovery* Urgent Care Facility* Utilities (Minor/Intermediate/Major) Veterinary Clinic (indoor only)* Local Commercial (C‐1) District District Development Standards Specific Uses Allowed within the District Page 174 of 247 Maximum Density = 14 units/acre Front Setback = 20 feet Bufferyard = 15 feet with plantings  Maximum Building Height = 35 feet Side Setback = 10 feet     adjacent to RE, RL, RS,TF, or MH Maximum Units per Building = 12 Side Setback to Residential = 20 feet     districts; 10 feet with plantings Rear Setback = 10 feet     adjacent to residences in AG Rear Setback to Residential = 20 feet Allowed by Right Subject to Limitations Special Use Permit (SUP) Required Group Home (7‐15 residents) Church (with columbarium) Activity Center (youth/senior) Multifamily Attached Day Care (family/group/commercial) Assisted Living Multifamily Detached Golf Course Bed and Breakfast (with events) Rooming/Boarding House Nature Preserve/Community Garden Emergency Services Station Utilities (Minor) Neighborhood Amenity Center Group Home (16+ residents) Park (Neighborhood) Halfway House School (Elementary) Nursing/Convalescent Home Utilities (Intermediate) Orphanage Wireless Transmission Facility (<41') School (Middle) Student Housing Specific Uses Allowed within the District Low Density Multifamily (MF‐1) District District Development Standards Page 175 of 247 Maximum Density = 24 units/acre Front Setback = 25 feet Bufferyard = 15 feet with plantings  Maximum Building Height = 45 feet Side Setback = 15 feet     adjacent to RE, RL, RS,TF, or MH Maximum Units per Building = 24 Side Setback to Residential = 30 feet     districts; 10 feet with plantings Rear Setback = 15 feet     adjacent to residences in AG Rear Setback to Residential = 30 feet Allowed by Right Subject to Limitations Special Use Permit (SUP) Required Assisted Living Church (with columbarium) Activity Center (youth/senior) Group Home (7‐15 residents) Day Care (family/group/commercial) Bed and Breakfast (with events) Multifamily Attached Golf Course Emergency Services Station Nursing/Convalescent Home Nature Preserve/Community Garden Group Home (16+ residents) Orphanage Neighborhood Amenity Center Halfway House Rooming/Boarding House Park (Neighborhood) School (Middle) Utilities (Minor) School (Elementary) Student Housing Utilities (Intermediate) Wireless Transmission Facility (<41') High Density Multifamily (MF‐2) District District Development Standards Specific Uses Allowed within the District Page 176 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 8:53 AM To:Mike Elabarger Subject:FW: NOTICE OF PUBLIC HEARING A little late - Karen From:TheHollands[mailto:txhollands@suddenlink.net] Sent:Monday,June27,20166:56AM To:WEB_Planning<planning@georgetown.org> Subject:NOTICEOFPUBLICHEARING Comments From Neighboring Property Owners You are being notified as a requirement of the City of Georgetown Code of Ordinances. You are invited to express your views or concerns regarding the – described petition by returning this comment form and/or by attending one or both of the scheduled public hearings on the matter. Project Name: 4700 Williams Dr.-Merritt Heritage Project Case Number: REZ-2016-010 P&Z Date: June 7, 2016 Case Manager: Mike Elabarger Name of Respondent: __Marie and Lawrence Holland_________________________ Please print name) Signature of Respondent: _Marie Holland Lawrence Holland___________________ (Signature required for protest) Address of Respondent: __107 Lynn Cove, Georgetown, TX 78633______________ (Address required for protest) I am in FAVOR: ______________________ I OBJECT: ______X_________________ Additional Comments: The City of Georgetown already has more of this type of housing compared to all the surrounding cities. We don’t need any more please. ________________________________________________________________________________ Page 177 of 247 2 ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ _____________________________________________________ Written comments may be sent to City of Georgetown Planning Department, P. O. Box 1458 Georgetown, Texas 78627. Emailed comments may be sent to planning@georgetown.org. Any such comments may be presented to the Commission. Click here to report this email as spam. Page 178 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 9:00 AM To:Mike Elabarger; Juan Enriquez Cc:Sofia Nelson Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals Shelley says we can send these to her and she will add to the Council email that they receive before the meeting. Karen From:don.bell68[mailto:don.bell68@verizon.net] Sent:Monday,June27,20168:44AM To:WEB_Planning<planning@georgetown.org> Subject:CommentsonLiveOakand/orMerrittHeritageProposals We seniors in Sun City worked hard and saved our money to move here. Why should you city council people choose to place affordable housing RIGHT ACROSS THE ROAD from our homes? Is this so you can feel better about yourselves? That is liberal think that prevails in Travis Co. Maybe you want to lower my property values or bring some crime into Sun City? Texas is a big place...these folks could be placed elsewhere. How about next door to where you live? Don G. Bell don.bell68@verizon.net Sent from my Verizon 4G LTE smartphone Click here to report this email as spam. Page 179 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 10:07 AM To:Shelley Nowling Cc:Mike Elabarger; Juan Enriquez; Sofia Nelson Subject:FW: Comments on Live Oak and/or Merritt Heritage LIHTC Proposals Shelley,itlookslikeCouncilmayalreadyhavethisone.  Karen   ͲͲͲͲͲOriginalMessageͲͲͲͲͲ From:JulKamen[mailto:jkamen3@suddenlink.net] Sent:Monday,June27,20169:47AM To:WEB_Planning<planning@georgetown.org> Cc:District4<district4@georgetown.org>;District2<district2@georgetown.org>;District7<district7@georgetown.org>; District5<district5@georgetown.org>;District3<district3@georgetown.org>;District1<district1@georgetown.org>; District6<district6@georgetown.org> Subject:CommentsonLiveOakand/orMerrittHeritageLIHTCProposals  IfGeorgetownalreadyhasalmost3Xthestateaverage,itisabundantlyclearwehavealreadyfulfilledourresponsibility toprovideaffordablehousing.  Butevenmoreimportantly,thisvoteonTuesdayrepresentstherighttoretaincontroloverourowncommunityandit's development,vs.invitinggovernmentcontrolandregulationintheformofTDHCA.Texaslawgivesusthatrightto choose.Let'schoosewisely.  JustgoogleGalveston,TXͲͲanislandintheGulfand1hr.fromthe4thlargestcityinthecountryͲͲwhichbyallaccounts shouldbethriving.Insteadtheysuccumbedtothelureoffederaldollars,withTDHCAandHUDstringsattached, providingLIHTChousingandallthepublichousinginthecounty.Thecitycannowbarelyretainit'spopulationdespite allthegovernmentsubsidies.  Iurgecounciltorejectall3affordablehousingdevelopmentsunderthesecircumstances.Donotinvitemore governmentcontrol,disguisedasassistance,intoourcity.  Thankyou, JuliaKamen ResidentofDistrict4  FormerresidentofGalveston,TX Page 180 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 11:16 AM To:Shelley Nowling Cc:Sofia Nelson; Juan Enriquez; Mike Elabarger; Jennifer Bills Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals     Karen      ‐‐‐‐‐Original Message‐‐‐‐‐  From: Peggy Holloway [mailto:peggybholloway@gmail.com]   Sent: Monday, June 27, 2016 11:16 AM  To: WEB_Planning <planning@georgetown.org>  Subject: Comments on Live Oak and/or Merritt Heritage Proposals    Folks, just want to relay my thoughts that Steve Fought has the correct and smart ideas for 3 types of housing: senior,  workforce, and low‐very low. The needs are all different and should be recognized and accepted. I sincerely hope you  understand this because it will cause trouble "down the road" if not implemented. I live in Sun City and am concerned  about these groups of people being treated fairly, and after 31/2 years here from Dallas, I believe that Georgetown  cares.    Peggy Holloway     Sent from my iPad  Page 181 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 11:40 AM To:Shelley Nowling Cc:Sofia Nelson; Mike Elabarger; Juan Enriquez Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals Karen From: Caren Walker [mailto:carenewalker@gmail.com]   Sent: Monday, June 27, 2016 11:40 AM  To: WEB_Planning <planning@georgetown.org>  Subject: Comments on Live Oak and/or Merritt Heritage Proposals  I am opposed to these two projects. Caren Walker 113 Old Blue Mountain Georgetown, TX 78633 Click here to report this email as spam. Page 182 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 2:31 PM To:Shelley Nowling Cc:Sofia Nelson; Mike Elabarger; Juan Enriquez Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals Karen From: Lee Schuch [mailto:lee.schuch@gmail.com]   Sent: Monday, June 27, 2016 2:17 PM  To: WEB_Planning <planning@georgetown.org>  Subject: Comments on Live Oak and/or Merritt Heritage Proposals  Gentlemen: I am writing to express my view that ALL of the proposed low rent housing projects be denied. Georgetown does not need any more of these projects as many communities around our city have far fewer such projects. What the city council has done to our formerly wonderful, nice community is a complete disgrace and takes no consideration into the myriad of issues that are being created. Traffic will continue to be a disaster, water will be a huge concern and the increasing crime rate (especially due to these low income projects) will be a black eye on our community. Enough is enough, vote against ALL of these proposed projects. -- With gratitude, Lee The choices we make show the true character of our nature. Click here to report this email as spam. Page 183 of 247 1 Mike Elabarger From:Karen Frost Sent:Monday, June 27, 2016 10:52 AM To:Shelley Nowling Cc:Sofia Nelson; Juan Enriquez; Mike Elabarger Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals MorecomingͲ  Karen   ͲͲͲͲͲOriginalMessageͲͲͲͲͲ From:wlsoula2[mailto:wlsoula2@aol.com] Sent:Monday,June27,201610:24AM To:WEB_Planning<planning@georgetown.org> Cc:District4<district4@georgetown.org> Subject:CommentsonLiveOakand/orMerrittHeritageProposals  InbothinstancestheexistingzoningontheparcelsisLocalCommercial(CͲ1).  Hasanythoughtorconsiderationbeengiventothelowerincometheseparcelswillgenerateifdevelopedas apartments?Iamsuretherealestatetaxeswillbelowerandtherewillalsobethelossofsalestax.Inacommunity growingasquicklyasGeorgetown,itishighlylikelythesepropertieswillbedevelopedcommerciallyinthenearfuture andwouldenhancethecity'sincome.Thisenhancementtothecity'sincomewouldassistincontrollingtherealestate taxburdenonthesinglefamilyhomeowner  Itisassumedthattheoriginalzoningwasdeterminedinconcertwithanoveralllanduseplan.Doestheoveralllanduse planincludesufficientexistingmultiͲfamilylocations?Willchangestotheoveralllanduseplanresultinnegative impactstotheplan?Isitnecessarytoentertainachangeorcouldthedeveloperhavesecuredaproperlyzonedparcel ofproperty?  Itseemsthatthereareconstantrequestforrezoningandspecialusepermits.Perhapsthecityneedstoreassessits overalllanduseplantobetterdetermineandcontrolitsgrowthpatterns.  BillSoula 103MustangIslandTrail Georgetown,TX.78633  Page 184 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 6:14 AM To:Shelley Nowling Cc:Sofia Nelson; Karen Frost Subject:FW: Making Georgetown livable FYI – Email in support for both tax credit projects going to City Council tonight.     From: Emily Northrop [mailto:northrop@southwestern.edu]   Sent: Monday, June 27, 2016 8:53 PM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Making Georgetown livable  Dear Mr. Enriquez, I am concerned about the availability of affordable housing in Georgetown. Please support the special use permit for Live Oak. People who work in Georgetown and contribute to our community deserve homes that they can afford. Also, please rezone the property for Merritt Heritage. Many seniors need housing that is affordable. Thank you, Emily Northrop Emily Northrop Southwestern University Economics, Anthropocene SHIFT happens! Click here to report this email as spam. Page 185 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 6:19 AM To:Mike Elabarger Subject:FW: Support for Live Oak and Merritt Heritage FYI    From: Larry J. Hilliard [mailto:lj_hilliard@juno.com]   Sent: Monday, June 27, 2016 8:59 PM  To: Sofia Nelson <Sofia.Nelson@georgetown.org>; Juan Enriquez <Juan.Enriquez@georgetown.org>  Cc: District1 <district1@georgetown.org>; District2 <district2@georgetown.org>; District3 <district3@georgetown.org>;  District4 <district4@georgetown.org>; District5 <district5@georgetown.org>; District6 <district6@georgetown.org>;  District7 <district7@georgetown.org>; Mayor <mayor@georgetown.org>  Subject: Support for Live Oak and Merritt Heritage  Dear Ms. Nelson and Mr. Enriquez: My wife and I are residents of Sun City and we support the proposals for affordable housing for employees, millennials and senior citizens in Georgetown. It is unthinkable that anyone, especially a city council person, would oppose providing affordable housing for those people who make Georgetown "tick" on a daily basis. People who work in Georgetown should be able to afford to live in Georgetown ~ and so should our young people and senior citizens. We ask you to support the special use permit for Live Oak. Many of our workers are cost-burdened, having to pay more than 40% or 50% of their income for housing costs and transportation. Without them, our businesses can not blossom, our city cannot maintain its quality of life and the prosperity of our local economy suffers. We ask you to rezone the property for Merritt Heritage. No other city in Texas has as huge a senior population as we ~ and it continues to grow at an unprecedented rate. With the addition of another 2,500 homes in Sun City, it will keep growing larger. Today, our senior population consists of many aged seniors. They find it difficult to live here as their retirement savings have shrunk due to loss of a spouse, or severe illness. Their fiscal resources are no longer sufficient to cover their housing costs, including maintenance. And they can't find affordable housing to remain here. These seniors pay taxes also ~ either directly or through their rents. Others contribute volunteer labor to sustain our quality of life. Now it's time for us to care about them. And that's true of our workers, too. Our elected officials seem to have no problem supporting luxury condos for senior citizens (Seven Strand Luxury Senior Living at the entrance to Sun City) but they don't want "those other people" to have decent housing that they can afford. This must not stand! Thank you for supporting decent housing for all citizens of Georgetown. Larry and Patricia Hilliard Sun City Texas Page 186 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 6:20 AM To:Mike Elabarger Subject:FW: Support for Live Oak and Merritt Heritage FYI    From: Mark Skrabacz [mailto:markskrabacz@hotmail.com]   Sent: Monday, June 27, 2016 10:28 PM  To: Sofia Nelson <Sofia.Nelson@georgetown.org>; Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Support for Live Oak and Merritt Heritage  Dear Sofia and Juan,    I imagine you are receiving a few CON emails about these worthy projects. Here's my PRO, and I represent  many from San Gabriel UU Fellowship.    I request that you support the Special Use Permit for Live Oak.  Many of our workers are cost‐burdened,  paying more than 40 or 50% for housing costs and transportation. Without them, our businesses cannot thrive  to ensure the prosperity of our local economy, and to maintain Georgetown's quality of life. We need to  support affordable housing for our workers!    Please rezone the property for Merritt Heritage.  No other city in Texas has as large a senior population as  Georgetown  With the addition of 2.429 homes in Sun City, it will keep growing.  Yet our senior population is  aging. They will find it difficult to continue to live here as their retirement savings shrink due to loss of a  spouse, a fragile economy, or severe illness. When their fiscal resources are no longer sufficient to cover their  housing costs, including maintenance, they'll need to find affordable housing to remain here.    These seniors stabilize our economy.  Many contribute volunteer labor to sustain our quality of life.  Now it's  time for us to care about them.      Please let me know how I can support you.    Gratefully,    Mark    Mark Skrabacz, Minister, San Gabriel UU Fellowship - A Welcoming Congregation, Phone 512-688-5069 Physical Address: 1322 E University Ave, Georgetown, TX 78626 Mailing Address: 4500 Williams Dr. Ste. 212 #245, Georgetown, TX 78633 Residence: 1215 Haven Lane #102, Georgetown, TX 78626 . land 512-819-1608 cell 830-928-3722  Page 187 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 6:20 AM To:Mike Elabarger Subject:FW: Support of affordable housing FYI    From: Marchelia Hart [mailto:cheehart@yahoo.com]   Sent: Monday, June 27, 2016 11:34 PM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Support of affordable housing  Dear Mr. Enriquez, I am writing this letter to ask you to support the Special Use Permit for Live Oak and the rezoning of property for Merritt Heritage. We must do everything in our power to support our community and I see this as a positive move forward. I live in the Woods of Fountainwood Subdivision off of Jim Hogg Road and I think affordable housing is greatly needed in our community of Georgetown. I am not troubled in the least that I will have new neighbors where I currently live. I am definitely for it! Thank you for reading and considering my request. Chee Hart 130 Roberts Circle Georgetown, TX 78633 512‐627‐9132 Peace & Blessings, Chee Click here to report this email as spam. Page 188 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 8:29 AM To:Shelley Nowling Cc:Sofia Nelson; Juan Enriquez; Mike Elabarger Subject:FW: Proposed Low Income developments Karen From: John Spahr [mailto:spahrvfw@yahoo.com]   Sent: Monday, June 27, 2016 7:36 PM  To: WEB_Planning <planning@georgetown.org>  Cc: District4 <district4@georgetown.org>  Subject: Proposed Low Income developments  I am strongly opposed to any development that will have an adverse effect on the traffic flow on Williams Drive. There are already several large developments under construction along Williams Dr. and adding more will simply make the problem greater. The increase in traffic on Williams Drive has already reached too high a level and yet the city seems bound and determined to add more developments and more traffic. While I don't know the reason for the rampant approval of developments (other than to increase the tax base at the expense of the people already here), I can only say, "Enough is Enough". Surely, there are other areas in the city that are far more suited for these developments if indeed we are being forced to take them. Sincerely John T. Spahr 116 Trail of the Flowers Georgetown, TX 78633 Click here to report this email as spam. Page 189 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 8:30 AM To:Shelley Nowling Cc:Sofia Nelson; Juan Enriquez; Mike Elabarger Subject:FW: City Council Meeting 6/28, agenda items M & N From: Edwin [mailto:edroark1@gmail.com]   Sent: Tuesday, June 28, 2016 12:05 AM  To: WEB_Planning <planning@georgetown.org>  Subject: City Council Meeting 6/28, agenda items M & N    Greetings to members of the Georgetown City Council,    I am opposed to the multi‐family developments being considered in agenda items M & N and petition the Council to  deny these request.    We live in the Serenada subdivision near these proposed developments firmly believe that these proposed  developments will have a negative impact for our neighborhood and area.      I believe there are locations within the County and City that can benefit from the construction of these facilities.  The  developer and City need to work together to find those areas.    Thanks for your consideration.    Edwin Roark    Roark Properties, Inc  Edwin Roark, President/Broker  512‐705‐5501    3910 Sequoia Trail West  Georgetown, TX 78628  OF 512‐363‐5249  FX 866‐323‐8968      Click here to report this email as spam. Page 190 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 8:33 AM To:Shelley Nowling Cc:Sofia Nelson; Juan Enriquez; Mike Elabarger Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals From: Russ Lanning [mailto:russ.lanning@suddenlink.net]   Sent: Tuesday, June 28, 2016 7:57 AM  To: WEB_Planning <planning@georgetown.org>  Cc: District4 <district4@georgetown.org>  Subject: Comments on Live Oak and/or Merritt Heritage Proposals  I wish for it to be known that I am totally opposed to any expansion of our low income housing in Georgetown. It is time for neighboring communities to bear their fair share of the burden in supporting this concept. I cannot understand how the city could possibly put low income housing along the growth corridor of Georgetown. Do you not realize that there are significant negatives associated with this plan? Increased crime, sight blight, and a drop in property values all around the area. Who would want to invest in a business, buy a home, or work in the vicinity of a low income project? The Williams Drive corridor has experienced an expansion of Senior Care and Assisted Care Housing over the past couple of years. Would it not make sense to continue this expansion with affordable senior housing to supplement the significant growth of the senior population in Georgetown. The afore mentioned negatives would not be associated with a project that provides affordable housing for seniors since there would not likely be increased crime or sight blight imposed upon the community. Sincerely, Russell and Karen Lanning 101 Briar Patch Cove Georgetown Click here to report this email as spam. Page 191 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 10:18 AM To:Mike Elabarger Subject:FW: Support for Live Oak and Merritt Heritage     From: Stephanie Blanck [mailto:sablanck@msn.com]   Sent: Tuesday, June 28, 2016 10:18 AM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>; Sofia Nelson <Sofia.Nelson@georgetown.org>  Cc: District5 <district5@georgetown.org>  Subject: Support for Live Oak and Merritt Heritage  Dear Sofia and Juan: I am writing in support of the Special Use Permit for Live Oak. Many of our workers are cost- burdened paying more than 40 or 50% for housing costs and transportation. Without them, our businesses cannot blossom, our City cannot maintain its quality of life nor ensure the prosperity of our local economy.  I also ask you to encourage the council to rezone the property for Merritt Heritage. No other city in Texas has as huge a senior population as we. With the addition of 2.429 homes in Sun City, it will keep growing larger. Today, our senior population consists of many aged seniors. They find it difficult to live here as their retirement savings have shrunk due to loss of a spouse, or severe illness.Their fiscal resources are no longer sufficient to cover their housing costs, including maintenance. And they can't find affordable housing to remain here.  These seniors stabilized our economy. Others contributed volunteer labor to sustain our quality of life. Now it's time for us to care about them. And that's true of our workers, too. This community has changed a lot since I moved here in 1980. We attracted the seniors to come live here, now let's support them. We need the service industry, teachers, public safety employees - now lets find them affordable housing so they can live where they work. Let's not become an elite community. Thank you for listening, Stephanie Blanck 206 Jaydee Terrace, 78628 Stephanie Blanck “You are what you do, not what you say you'll do.” Carl Jung       Click here to report this email as spam.  Page 192 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 10:06 AM To:Mike Elabarger Subject:FW: Support for Affordable Housing in Georgetown FYI    From: Rev. Ron Trimmer [mailto:pastor@hopegeorgetown.org]   Sent: Tuesday, June 28, 2016 9:57 AM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Support for Affordable Housing in Georgetown  Dear Juan Enriquez, Planner, Please accept this letter as support for the building of safe, decent, affordable housing in Georgetown. Specifically, we support the granting of special use building permits for Live Oak to build housing at 4121 Williams Dr. and Merritt Heritage to build at 4700 Williams Dr. Hope United is an open and affirming congregation in Georgetown, which offers the freedom to explore the questions of life, share the love of Christ, grow in faith, and work for peace and justice. We recognize that housing can play a vital role in that exploration, sharing, and growth and are supportive of efforts to provide working families with quality housing options, bringing them closer to the peace and justice we seek. Many of our workers are cost-burdened paying more than 40 or 50% for housing costs and transportation. Without them, our businesses can not blossom, our City maintain its quality of life nor ensure the prosperity of our local economy. Blessings and Peace, Rev. Ron Trimmer   ‐‐‐  Blessings and Peace,  Rev. Ron Trimmer    Hope United ‐ Georgetown, Texas  512.876.9097 pastor@HopeGeorgetown.org  www.HopeGeorgetown.org  Click here to report this email as spam. Page 193 of 247 Page 194 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 10:42 AM To:Shelley Nowling Cc:Sofia Nelson; Mike Elabarger; Juan Enriquez Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals Attachments:LowIncomeAffordableHousing.pdf From: Steven Ritzwoller [mailto:sritzcpa@yahoo.com]   Sent: Tuesday, June 28, 2016 10:31 AM  To: WEB_Planning <planning@georgetown.org>  Subject: Comments on Live Oak and/or Merritt Heritage Proposals  I am opposed to the affordable housing being discussed for Georgetown and have attached comments as a neighboring property owner. Steven Ritzwoller 512 591-7717 Click here to report this email as spam. Page 195 of 247 Page 196 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 11:52 AM To:Shelley Nowling Cc:Sofia Nelson; Mike Elabarger; Juan Enriquez Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals Shelley, this will be the last one I send to you to forward to Council due to the time of the day. After this I will just continue to send it to Sofia and the planners. Karen From:PattiCakeMun@aol.com[mailto:PattiCakeMun@aol.com] Sent:Tuesday,June28,201611:37AM To:WEB_Planning<planning@georgetown.org> Subject:CommentsonLiveOakand/orMerrittHeritageProposals IT APPEARS THAT THE THREE LOW INCOME HOUSING PROJECTS ARE ALL ON WILLIAMS DRIVE AND ALL WITHIN A FAIRLY NEAR DISTANCE TO EACH OTHER. IT ALSO APPEARS THAT GEORGETOWN ALREADY HAS MORE THAN THEIR FAIR SHARE OF THIS TYPE HOUSING. IT ALSO APPEARS THAT DUE TO THE ALREADY HEAVY TRAFFIC ON WILLIAMS DRIVE, THAT ONE OR MORE OF THE PROJECTS SHOULD BE SCATTERED TO THE EAST OR NORTH OF GEORGETOWN. PATTI MUNSON 140 CAMP DR. SUN CITY Click here to report this email as spam. Page 197 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 1:06 PM To:Mike Elabarger Subject:FW: Live Oak & Merritt Heritage Complexes     From: Maggie Castillo [mailto:maggiecast@hotmail.com]   Sent: Tuesday, June 28, 2016 8:35 AM  To: Sofia Nelson <Sofia.Nelson@georgetown.org>; Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Live Oak & Merritt Heritage Complexes  To Sofia Nelson & Juan Enriquez,    Please support the Special Use Permit for Live Oak Complex for affordable housing for  workers/millenials.  Our city benefits greatly from their services & skills, without them our city  cannot maintain its current quality of life.     Also, please support the rezoning of the Merritt Heritage for affordable housing for seniors  with diminished incomes.  As you know, Georgetown has a huge senior population which is on  fixed income, many of which are elderly widows.  Affordable housing is much needed for this  population.    Thank you, Maggie Castillo  Click here to report this email as spam. Page 198 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Tuesday, June 28, 2016 1:12 PM To:Mike Elabarger Subject:FW: Support for affordable housing possibilities in Georgetown     ‐‐‐‐‐Original Message‐‐‐‐‐  From: Susan Wukasch [mailto:sewtoo@verizon.net]   Sent: Tuesday, June 28, 2016 10:52 AM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Support for affordable housing possibilities in Georgetown    Mr. Enríquez,     I urge you to support the special Use permit for Live Oak apartments, 4121 Williams Drive, and the rezoning requesting  to enable the development of the Merritt Heritage complex at 4700 Williams Drive.     I attended the P & Z meeting a few weeks ago and heard the staff presentations recommending against these  developments, but I urge you to reconsider and support these developments as necessary to begin to correct the  terrible inadequacy of affordable housing in Georgetown. Hardly a day goes by without my hearing someone bemoan  the fact that housing is too expensive here for teachers, service workers, police, firemen, and people on fixed incomes in  Georgetown. Refusing to allow affordably priced housing to be integrated into areas in which the dollars these  individuals do have will contribute to the commercial life of the area, while providing close‐in housing for many of the  workers needed to service the large senior populations of Sun City and the many facilities that provide care for disabled  seniors in that very area, seems very short‐sighted to me. Please support the changes/exceptions needed by these  developers to make these small islands of affordable housing available to those of us who need less expensive housing.  It is the right thing to do.     Thank you,     Susan Wukasch     Page 199 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 2:21 PM To:Sofia Nelson; Mike Elabarger; Juan Enriquez Subject:FW: Affordable housing From: Suzanne H [mailto:shaselfeld@hotmail.com]   Sent: Tuesday, June 28, 2016 2:14 PM  To: WEB_Planning <planning@georgetown.org>  Subject: Affordable housing  I approve senior affordable housing, disapprove regular workforce affordable housing.  Click here to report this email as spam. Page 200 of 247 1 Mike Elabarger From:Karen Frost Sent:Tuesday, June 28, 2016 2:45 PM To:Sofia Nelson; Mike Elabarger; Juan Enriquez Subject:FW: AFFORDABLE HOUSING From: joe.scavella@suddenlink.net [mailto:joe.scavella@suddenlink.net]   Sent: Tuesday, June 28, 2016 2:44 PM  To: WEB_Planning <planning@georgetown.org>  Subject: AFFORDABLE HOUSING  DOROTHY: OUR FAMILY IS NOT AGREEABLE ABOUT HAVING AFFORDABLE HOUSING ON ANY PART OF  WILLIAMS DRIVE. WE OBJECT.     JOSEPH J. SCAVELLA  255 TRAIL OF THE FLOWERS  GEORGETOWN, TEXAS  Click here to report this email as spam. Page 201 of 247 1 Mike Elabarger From:Darlene Duncan <dduncan@veriteesolutions.com> Sent:Tuesday, June 28, 2016 3:27 PM To:Mike Elabarger Subject:Re: The Need for Senior Housing in Georgetown. Merritt Heritage!     Darlene Duncan  San Gabriel Senior Village  Operation Manager  2101 Railroad St.   Georgetown, Texas 78626  512-864-9475p / 512-864-9498f  dduncan@veriteesolutions.com    From: Mike Elabarger <mike.elabarger@georgetown.org>  Sent: Tuesday, June 28, 2016 2:51 PM  To: Darlene Duncan  Cc: Juan Enriquez  Subject: RE: The Need for Senior Housing in Georgetown.      Thank you.  Staff is tabulating the many public comments we have received today and yesterday on 2 applications being  presented to City Council this evening.  Can you please clarify which application, or both, you wish to register your  comment to:    SUP‐2016‐002 – known as Live Oak  REZ‐2016‐010 – known as Merritt Heritage   Thank you, your comment will be routed to the appropriate City staff to be conveyed to City Council, as well as the  applicant for the particular application.   Mike       From: Darlene Duncan [mailto:dduncan@veriteesolutions.com]   Sent: Tuesday, June 28, 2016 2:36 PM  To: Mike Elabarger <mike.elabarger@georgetown.org>  Subject: The Need for Senior Housing in Georgetown. I manage SGSV here in Georgetown. One of the hard's thing I have to do daily is tell seniors and their families  that I can only place them on a wait list. An those that their income a 50% or 30% I cant even help due to I  have no 50% set aside here and the 30% wait list is closed. I am very passionate about my seniors and when  Page 202 of 247 2 they try and refer their friends, we can on add to the list. The desperation I here in their families voices and  then they as me what can I suggest. Event the Housing Authority wait list is closed currently. Senior Living is  much needed in Georgetown Texas! Please and Thank you,      Darlene Duncan  San Gabriel Senior Village  Operation Manager  2101 Railroad St.   Georgetown, Texas 78626  512-864-9475p / 512-864-9498f  dduncan@veriteesolutions.com  Click here to report this email as spam.  Page 203 of 247 1 Mike Elabarger From:Cheryl Dorothy <cjdotusa@yahoo.com> Sent:Tuesday, June 28, 2016 4:21 PM To:Mike Elabarger Subject:Affordable Housing Dear Sir, I am a resident of San Gabriel Senior Village for the last 8 years and I truly believe that the need for Affordable Housing especially in the 55 and over category is really needed here in Georgetown. When I moved to Texas 8 yrs ago there was only 2 apartment complexes in Georgetown for senior citizens and right now there are STILL only 2 apartment complexes. I believe there is a greater need now, than there was then. I realize that Sun City is expanding, however, there are a lot of seniors who can't afford, nor do they want all the responsibilities of home ownership. Since Georgetown is the number one spot for retirees in the nation, I think it is the responsibility of the City Council to help grow places to live and prosper for seniors. I understand that Merritt properties is asking to build another apartment complex in Georgetown. If it is as good as ours, I think we not only need it but should welcome it. Thank you for your support. Cheryl Dorothy Senior Citizen of Georgetown Texas. Click here to report this email as spam. Page 204 of 247 1 Mike Elabarger From:Carroll <mycalexa@gmail.com> Sent:Tuesday, June 28, 2016 5:42 PM To:Mike Elabarger Subject:Re: Affordable housing for seniors!! Merritt Heritage first choice. Or both applications, generally. Need is there regardless of the builder. But I support the builder/owner of San Gabriel Senior Village in Georgetown as well as his other properties. I viewed the one he owns in Buda, Texas, south of Austin. Thank you. “We work in the dark to save the light.” Ezio Auditore – (Assassin’s Creed - the movie) ~~~~~ “In this dark, when we all talk at once, some of us must learn to whistle.” ~ Walt Kelly (Pogo) On Tue, Jun 28, 2016 at 4:46 PM, Mike Elabarger <mike.elabarger@georgetown.org> wrote: Thank you.  Staff is tabulating the many public comments we have received today and yesterday on 2 applications  being presented to City Council this evening.  Can you please clarify which application, or both, you wish to register  your comment to:    SUP‐2016‐002 – known as Live Oak  REZ‐2016‐010 – known as Merritt Heritage   Thank you, your comment will be routed to the appropriate City staff to be conveyed to City Council, as well as the  applicant for the particular application.   Mike     Page 205 of 247 2 From: Carroll [mailto:mycalexa@gmail.com]   Sent: Tuesday, June 28, 2016 3:43 PM  To: Mike Elabarger <mike.elabarger@georgetown.org>  Subject: Affordable housing for seniors!! With restrictions and red tape in Austin government, it seems to be up to the surrounding communities to offer affordable housing for seniors. Not everyone arrives at this last leg in their life well prepared for the crimping that's been done as federal government continues to tweak the formulas and shuffle the monies meant to assist in retirement. I was born in 1943, a forerunner in the mass of baby boomers coming after me. We all know the huge issue of national debt and unresolved financial issues in this country, plus uncertainty of polarized leadership. Since neither Congress nor the administration has seen fit to deal directly with the issues of retirement - or the huge demand looming in the near future - the cry for affordable housing is already reaching epic volume. Circumstances unforeseen brought me to this affordable place in Georgetown as I all be fled the high flying expense of Austin living. I am beginning my third year here. Manageable, affordable expense of day-to-day living is a God-send to me and my neighbors. I make my nest here in comfort and safety, and in agreeable surroundings and community. Who knew 20 years ago I would have such a safety net when times have become so unpredictable with a future that is no longer certain. As we look to changing circumstances and lessening value of our contributions, I see my group growing substantially over time. It is an asset to smaller communities to provide affordability and reap the financial and social reward of this contributing group of retired citizens who shop, participate, vote and value places such as Georgetown. The need is great and will not let up. Today is the time to build and plan because the future in this country may become as uncertain as what seniors face today. We don't have to look far to see what a lack of planning in lieu of endless Page 206 of 247 3 discussion can do in the long run. Being aware is a step toward resolving what is surely coming throughout our country. Best for everyone, government and citizens, to be ahead of the wave, in my opinion. Thank you for your time. Respectfully, Carroll Alexander (San Gabriel Senior Village - Georgetown) “We work in the dark to save the light.” Ezio Auditore – (Assassin’s Creed - the movie) ~~~~~ “In this dark, when we all talk at once, some of us must learn to whistle.” ~ Walt Kelly (Pogo) Click here to report this email as spam. Page 207 of 247 1 Mike Elabarger From:Cheryl Dorothy <cjdotusa@yahoo.com> Sent:Tuesday, June 28, 2016 4:26 PM To:Mike Elabarger Subject:Affordable Housing Dear Sir, I am a resident of San Gabriel Senior Village for the last 3 years and I truly believe that the need for Affordable Housing especially in the 55 and over category is really needed here in Georgetown. When I moved to Texas 3 yrs ago there was only 2 apartment complexes in Georgetown for senior citizens and right now there are STILL only 2 apartment complexes. I believe there is a greater need now, than there was then. I realize that Sun City is expanding, however, there are a lot of seniors who can't afford, nor do they want all the responsibilities of home ownership. Since Georgetown is the number one spot for retirees in the nation, I think it is the responsibility of the City Council to help grow places to live and prosper for seniors. I understand that Merritt properties is asking to build another apartment complex in Georgetown. If it is as good as ours, I think we not only need it but should welcome it. Thank you for your support. Ramona Forfia Senior Citizen of Georgetown Texas. Click here to report this email as spam. Page 208 of 247 1 Mike Elabarger From:Sharon Crockett <scrockett60@yahoo.com> Sent:Tuesday, June 28, 2016 6:15 PM To:Mike Elabarger Subject:Re: Affordable Housing Merritt Heritage    Sent from my iPad    > On Jun 28, 2016, at 4:43 PM, Mike Elabarger <mike.elabarger@georgetown.org> wrote:  >   > Thank you.  Staff is tabulating the many public comments we have received today and yesterday on 2 applications  being presented to City Council this evening.  Can you please clarify which application, or both, you wish to register your  comment to:  >   > *    SUP‐2016‐002 ‐ known as Live Oak  > *    REZ‐2016‐010 ‐ known as Merritt Heritage  >   > Thank you, your comment will be routed to the appropriate City staff to be conveyed to City Council, as well as the  applicant for the particular application.  >   > Mike  >   > ‐‐‐‐‐Original Message‐‐‐‐‐  > From: Sharon Crockett [mailto:scrockett60@yahoo.com]   > Sent: Tuesday, June 28, 2016 3:08 PM  > To: Mike Elabarger <mike.elabarger@georgetown.org>  > Subject: Affordable Housing  >   > This is to let you know that more affordable housing is needed in Georgetown.  I live at San Gabriel Senior Village and I  know that there is a long waiting list.  I have checked other properties and the samething there  >   > Sent from my iPad    Page 209 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Wednesday, June 29, 2016 7:35 AM To:Mike Elabarger Subject:FW: support for Special Use Permit for Live Oak FYIͲTheykeepcoming.  From:EdHillis[mailto:edhillis@gmail.com] Sent:Tuesday,June28,20165:56PM To:SofiaNelson<Sofia.Nelson@georgetown.org>;JuanEnriquez<Juan.Enriquez@georgetown.org> Subject:supportforSpecialUsePermitforLiveOak Georgetown friends, Please support the Special Use Permit for Live Oak. Many of our workers are cost-burdened paying more than 40 or 50% for housing costs and transportation. Without them, our businesses can not blossom, our City maintain its quality of life nor ensure the prosperity of our local economy. Please rezone the property for Merritt Heritage. No other city in Texas has as huge a senior population as we. With the addition of 2.429 homes in Sun City, it will keep growing larger. Today, our senior population consists of many aged seniors. They find it difficult to live here as their retirement savings have shrunk due to loss of a spouse, or severe illness. Their fiscal resources are no longer sufficient to cover their housing costs, including maintenance. And they can't find affordable housing to remain here. These seniors stabilized our economy. Others contributed volunteer labor to sustain our quality of life. Now it's time for us to care about them. And that's true of our workers, too. I am mostly quoting Walt Doering here, but I hope you will read my message as sincere as I agree deeply with his sentiments. Thank you, Ed Ed Hillis Country Club Road Click here to report this email as spam. Page 210 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Wednesday, June 29, 2016 7:42 AM To:Mike Elabarger Subject:FW: Housing in Georgetown FYI    From: Peggy Ogden‐Howe [mailto:peggy.ogdenhowe@gmail.com]   Sent: Tuesday, June 28, 2016 8:05 PM  To: Juan Enriquez <Juan.Enriquez@georgetown.org>  Subject: Housing in Georgetown  My husband and I moved here ;more than 4 years ago. I urge you to support the Special Use Permit for Live Oak. Georgetown needs to provide housing for a range of financial situations for families who work here. It would be unjust to expect those who have jobs here to drive distances to Georgetown, at considerable cost to them and loss of discretionary income after paying for their transportation. In addition, I urge you to support the rezoning of the property for Merritt Heritage. As a senior citizen who is living in our last single-family dwelling, I want options in my latter years. Senior citizens have added arts, culture, and service to Georgetown to make it a great and attractive community. We must not turn our backs on them when they need a different place to call home. Thank you. May you be blessed with joyous peace! Peggy Ogden-Howe Click here to report this email as spam. Page 211 of 247 1 Mike Elabarger From:Juan Enriquez Sent:Wednesday, June 29, 2016 12:46 PM To:Mike Elabarger Subject:FW: Housing for Seniors FYI–Theykeepcomingeventhoughtheygotapprovedlastnight.  From:ArthurCannon[mailto:arthur.cannon@gmail.com] Sent:Wednesday,June29,201610:05AM To:SofiaNelson<Sofia.Nelson@georgetown.org>;JuanEnriquez<Juan.Enriquez@georgetown.org> Subject:HousingforSeniors I am very much for the housing proposed for both Live Oaks low-income apartments and Merritt HeritageseniorhousingfortheelderlywithlowͲincome. IlivenearWilliamsDriveinHeritageOaks.Iknowthesetwoprojectswouldhelpthosepeople withthemostneeds. Art Cannon Tel:512 591-7736 Mobile: 617 840-2513 Click here to report this email as spam. Page 212 of 247 1 Mike Elabarger From:Karen Frost Sent:Thursday, June 30, 2016 8:45 AM To:Mike Elabarger; Juan Enriquez Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals From: Don Bowen [mailto:donbowen@suddenlink.net]   Sent: Wednesday, June 29, 2016 9:29 PM  To: WEB_Planning <planning@georgetown.org>  Subject: Comments on Live Oak and/or Merritt Heritage Proposals    I have carefully reviewed the material provided by Steve Fought concerning proposed low-income housing on Williams Drive, (Thank you, Mr. Fought). I note that Merritt Heritage is designated low income senior housing and the other two projects are apparently not yet designated. I have absolutely no issue with the provision of low income senior housing along that stretch of Williams Drive. Indeed I believe it is a good location, considering the concentration of existing senior facilities close by. The nearby locations of medical emergency personnel on D.B. Wood and Sun City Boulevard also support this location. I am also fine with low income workforce housing, especially if it is indeed oriented toward city workers and their families. The people that serve the community deserve our support. I am much less enthusiastic about locating general low-income housing along this section of Williams Drive. I am painfully aware of the tendency of subsidized low income housing to drift toward tenements and slums, and, unfortunately, the all-too-common increase in crime around such locations. I question if this section of Williams Drive is an appropriate location, given its current concentration of senior facilities and single-family homes. I fear an erosion of the currently low level of property crime, especially within Sun City and other senior facilities. Perhaps it would be better for assisted low-income housing to be placed in an area that already has a lower income working population. Thank you for your time and consideration. Don Bowen 106 Monument Hill Trail Sun City Click here to report this email as spam. Page 213 of 247 1 Mike Elabarger From:Karen Frost Sent:Wednesday, June 29, 2016 4:56 PM To:Juan Enriquez; Mike Elabarger Cc:Sofia Nelson Subject:FW: Comments on Live Oak and/or Merritt Heritage Proposals I think you have to start another pile of these. I will forward all the emails I receive, but I know that I am not getting them all. Karen From:WJEDJE1@aol.com[mailto:WJEDJE1@aol.com] Sent:Wednesday,June29,20164:47PM To:WEB_Planning<planning@georgetown.org> Subject:CommentsonLiveOakand/orMerrittHeritageProposals Dear Sirs, I Georgetown has two to three times some of our near by cities, Why in the World would Georgetown be selected to build these low income projects. There are over 13 to 14000 people living in Sun City, and it is already very congested on Williams Drive. Isn't it a bit insane to build more here, and make the traffic even worse? Walter Emmert 143 Old Chisholm Trail Georgetown Texas Click here to report this email as spam. Page 214 of 247 Page 215 of 247 Ordinance Number: ___________________ Page 1 of 2 Description: 13.24 ac. J. Fish Srvy – OF/C-1 to MF-1/MF-2 Case File Number: __REZ-2016-010__ Date Approved: __________________ Exhibits A&B Attached ORDINANCE NO. _____________________ An Ordinance of the City Council of the City of Georgetown, Texas, amending part of the Official Zoning Map to rezone 13.24 acres in the Joseph Fish Survey from the Office (OF) District and Local Commercial (C-1) District to 9.99 acres of the High Density Multifamily (MF-2) District and 3.256 acres of the Low Density Multifamily (MF-1) District, to be known as Merritt Heritage; repealing conflicting ordinances and resolutions; including a severability clause; and establishing an effective date. Whereas, an application has been made to the City for the purpose of amending the Official Zoning Map, adopted on the 12th day of June, 2012, for the specific Zoning District classification of the following described real property ("The Property"): 13.24 acres of the Joseph Fish Survey(s), being a portion of 118.34 acres recorded in Document Number 1996036558 of the Official Public Records of Williamson County, Texas, hereinafter referred to as "The Property"; and Whereas, public notice of such hearing was accomplished in accordance with State Law and the City’s Unified Development Code through newspaper publication, signs posted on the Property, and mailed notice to nearby property owners; and Whereas, the Planning and Zoning Commission, at a meeting on June 7, 2016, held the required public hearing and submitted a recommendation of approval to the City Council for the requested rezoning of the Property; and Whereas, the City Council, at a meeting on June 28, 2016, held an additional public hearing prior to taking action on the requested rezoning of the Property. Now, therefore, be it ordained by the City Council of the City of Georgetown, Texas, that: Section 1. The facts and recitations contained in the preamble of this Ordinance are hereby found and declared to be true and correct, and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this Ordinance implements the vision, goals, and policies of the Georgetown 2030 Comprehensive Plan and further finds that the enactment of this Ordinance is not inconsistent or in conflict with any other policies or provisions of the 2030 Comprehensive Plan and the City’s Unified Development Code. Section 2. The Official Zoning Map, as well as the Zoning District classification(s) for the Property is hereby amended from the Office District (OF) and Local Commercial District (C-1) to 9.99 acres of the High Density Multifamily District (MF-2) and 3.256 acres of the Low Density Multifamily District (MF-1), in accordance with the attached Exhibit A (Location Map) and Exhibit B (Legal Description) and incorporated herein by reference. Page 216 of 247 Ordinance Number: ___________________ Page 2 of 2 Description: 13.24 ac. J. Fish Srvy – OF/C-1 to MF-1/MF-2 Case File Number: __REZ-2016-010__ Date Approved: __________________ Exhibits A&B Attached Section 3. All ordinances and resolutions, or parts of ordinances and resolutions, in conflict with this Ordinance are hereby repealed, and are no longer of any force and effect. Section 4. If any provision of this Ordinance or application thereof to any person or circumstance shall be held invalid, such invalidity shall not affect the other provisions, or application thereof, of this Ordinance which can be given effect without the invalid provision or application, and to this end the provisions of this Ordinance are hereby declared to be severable. Section 5. The Mayor is hereby authorized to sign this ordinance and the City Secretary to attest. This ordinance shall become effective in accordance with the provisions of state law and the City Charter of the City of Georgetown. APPROVED on First Reading on the 28th day of June, 2016. APPROVED AND ADOPTED on Second Reading on the 26th day of July, 2016. THE CITY OF GEORGETOWN: ATTEST: ______________________ _________________________ Dale Ross Shelley Nowling Mayor City Secretary APPROVED AS TO FORM: ______________________ Charlie McNabb City Attorney Page 217 of 247 D e l W e b b Blv d WilliamsDr WilliamsDr Lake w ay Dr D B W o o d R d Booty'sCrossingRd Shell Rd ShellRd Jim H o g g R d Seren a da Dr Lake w ay Dr N L a k e w o o d s D r S e d r o T rl ")2338 REZ-2016-010Exhibit A Coordinate System: Texas State Plane/Central Zone/NAD 83/US FeetCartographic Data For General Planning Purposes Only ¯ Location Map 0 0.5 1Mi LegendSiteParcelsCity LimitsGeorgetown ETJ Page 218 of 247 Page 219 of 247 Page 220 of 247 Page 221 of 247 Page 222 of 247 Page 223 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: P roject updates and status reports regarding current and future transportation and traffic project; street, sidewalk, and other infrastructure pro jects; police, fire and other public safety pro jects; econo mic development projects; city facility projects;downtown projects including parking enhanceme nts,c ity lease agreements, and possible direction to city staff -- David Morgan, City Manager Blue Ho le Re spo nse ITEM SUMMARY: The City Council has requested regular updates regarding the status of projects, as well as the ability to discuss the se projects as a collective. FINANCIAL IMPACT: This is an Council Update Item. SUBMITTED BY: Shirley J. Rinn o n be half of David S. Morgan, City Manager ATTACHMENT S: Description GEDCO Projec t Update GTEC Projec t Up d ate GTEC Projec t P ro gres s Status GTAB Pro jec t Updates Page 224 of 247 Name Description Approved by Council Funded Monitoring Compliance Citigroup $1.3 Million Grant for wastewater infrastructure disbursed in April 2008. 12/12/2006 Funded April 2008 Yes, Final compliance date is Dec. 2018 Radix BioSolutions, Ltd. Provided grant to assist with the work and future plans of Radix BioSolutions at the TLCC. Agreement approved by GEDCO on February 9, 2010 and Council approved the Agreement at its March 9, 2010 Meeting. Radix paid back $47K on 3/15/15. Radix paid back $50K 3/10/16.3/9/2010 Funded May 13, 2010 Yes, Final compliance date is March 2018 Lone Star Circle of Care Provided a grant not to exceed $387,000 for Qualified Expenditures for future site improvements at 205 East University Avenue, Georgetown, Texas. Loan Agreement and Promissory Note have not been executed. Agreement approved by GEDCO on June 23, 2011 and Council approved the Agreement at its June 28, 2011 Meeting. 6/28/2011 Funded November and December 2011 Yes, Final Compliance Date is July 28, 2016 Grape Creek Provide a grant not to exceed $447,000 for Qualified Expenditures for the lease/purchase and future site improvements at 101 E. 7th Street and 614 Main Street for the operation of a winery on the Downtown Square in Georgetown Agreement approved by GEDCO on July 25, 2011 and Council approved the Agreement at its August 23, 2011 Meeting. Fourth Amended Performance Agreement, Lease Agreement, and Promissory Note was approved by GEDCO on August 20, 2012 and by the City Council on August 28, 2012. TIRZ Agreement for $60,000 approved by City Council on 9-11-12. 8/23/2011 Funded Yes, Final Compliance is March 2018. Georgetown Winery Provide a grant not to exceed $70,000 for Qualified Expenditures described as equipment for wine production and an agreement to maintain and operate the existing winery in Georgetown. Agreement approved by GEDCO on July 25, 2011 and Council approved the Agreement at its August 23, 2011 Meeting. 8/23/2011 Funded Yes, Final Compliance Date is June 30, 2016 DiFusion Technologies (2) Provide an extension of time for Difusion to retain unlimited access to the ICP Spectrometor (equipment) under a lease agreement with the TLCC for a year. At the end of the Agreement, Difusion will purchase the Spectometor from GEDCO for $112,000.00. Agreement Approved by GEDCO on December 21, 2015 and Council on January 12, 2016.1/12/2016 No funding involved Yes, Final Compliance September 30, 2017 GEDCO PERFORMANCE AGREEMENTS STATUS REPORT May 16, 2016 Page 225 of 247 Name Description Approved by Council Funded Monitoring Compliance GEDCO PERFORMANCE AGREEMENTS STATUS REPORT May 16, 2016 Georgetown Indpendent School District Provided a grant not to exceed $200,560 for the purchase of qualified expenditures related to the equipment for the Engineering Program and Laboratories at Georgetown and East View High Schools. GISD will offer the MSSC Certifications, implement a Job Placement Program, provide and annual report and annual tour of the facilities to the GEDCO Board. Agreement was approved by GEDCO on September 17, 2012 and the City Council on September 25, 2012. The GEDCO Board approved the GISD request to amend the Performance Agreement to allow the purchase different equipment than outlined in the original agreement on November 18, 2013. 9/25/2012 Partially Funded. Yes. Final Compliance based on funding available. Texas Life Sciences Collaboration Center (4) Provide a grant of $100,000 for the maintenance of the TLCC. Performance Agreement approved by GEDCO on 12/21/15. New one-year agreement.1/12/2016 Funded February 2016 Yes. Final Compliance October 31, 2016 The Rivery at Summit Conference Center Provide a grant not to exceed $4.5 Million for Public Infrastructure Improvements. Approved by the GEDCO Board on November 18, 2013. Approved by the City Council on December 10, 2013. 12/10/2013 Not Funded Yes.Construction Deadline is June 30, 2016. TASUS Texas Corporation Provide a grant of $67,500 for job creation related to expansion of manufacturing facilities. Approved by the City Council on February 25, 2014 and approved by the GEDCO Board on February 17, 2014 2/25/2014 Not Funded Yes. Final Compliance May 31, 2017 Radiation Detection Corporation Provide a grant of $320,000 for job creation related to the relocation of the corporate offices to Georgetown. Approved by City Council and GEDCO on July 23, 2013. 7/23/2013 Funded Yes. Final Compliance December 31, 2021 DisperSol Provide a grant of $250,000 for job creation related to expansion of manufacturing facilities. Approved by the GEDCO Board on August 18, 2014. Company earned $50K (= 10 eligible positions at $10/job). Check delivered 4/17/15 to company. Company earned $20K for creation of 4 net new jobs @ $5K/job incentive. Check delivered 5/9/16 10/16/2014 Partially Funded Yes. Final Compliance February 15, 2019 Page 226 of 247 Closed No No No. No No No Page 227 of 247 Closed No No. No. No. No No. Page 228 of 247 Current Capital Improvement Projects TIP No. Project No. Update On Schedule/ Or Behind Project Budget Project Cost Available Current Year Projected Current Year Cost Current Year Available Lakeway Drive Overpass #10 5QL Project Complete. Complete 2,500,000 2,500,000 0 0 0 Southeast Arterial 1 (Sam Houston Avenue)#12 5QG Project Complete. Complete 12,995,625 10,478,499 2,517,126 0 0 Wolf Ranch Parkway Extension (SW Bypass to DB Wood Road) #14A 5QW Project Complete. Complete 1,330,000 1,111,233 218,767 283,350 0 283,350 Southwest Bypass (SH29 to RR2243)#14B 5QC Project Complete. Complete 7,756,432 3,225,132 4,531,300 4,539,107 5,787 4,533,320 Northwest Blvd Overpass #QQ 5QX Engineer is coordinating design with the design for Rivery Boulevard in moving towards construction PS&E for both projects to minimize overlap work between these two projects. Engineer is developing alternatives for storm water outfall. Construction tentatively scheduled to begin mid-FY 2019. In-process Unchanged 1,136,178 1,099,076 37,102 571,178 479,588 91,590 NB Frontage Road (SS 158 to Lakeway)#QQ 5QY We have been informed by TxDOT that it will be doing the Schematic, Environmental, etc., and PS&E for the NB Frontage Road as part of its proposed Williams Drive Bridge project. The City project is on indefinite hold but we will be coordinating with TxDOT on its design project. Indefinite Hold Unchabged 613,822 613,822 0 382,822 382,822 0 ROW - 1460 #EEa #EEb #EEc 5RB Under Construction. Tentatively scheduled to be complete Spring 2018 (TxDOT is administering construction) Utility relocations - ongoing. Two Utility companies (Atmos Energy and Seminole Pipeline) have subnitted invoices for completed relocations for reimbursement. As of October 16th, the City has obtained PUAs or have closings completed or planned for all the remaining FM 1460 parcels. Remaining parcel – pending closing documents. Under Construction Unchanged 11,788,230 5,348,470 6,439,760 6,727,539 2,315,896 4,411,643 TCS/RR Easement 5RD Project Complete. Complete 1,500,000 1,503,148 -3,148 0 0 FM 971 / Washam 5RE Project Complete. Complete 100,000 0 100,000 0 0 Rivery Road 5RF Project Complete. Complete 779,000 29,000 750,000 750,000 0 750,000 Rivery Boulevard 5RM Engineer has submitted 75% plans for City review. Appraisals complete. Offers have been made to all 22 parcels. Closed on 6 parcels; 3 pending contract execution or final closing preparation. Construction tentatively scheduled to begin mid FY 2018. On Schedule Unchanged GTEC PROJECT UPDATE AND STATUS REPORT July 2016 Project to Date Current Year Budget (13/14) L:\Global\CIP Budgetary Worksheets\GTEC Status Report\2016\GTEC - Project Status - 2016-07.xlsx Page 1 of 2 7/13/2016Page 229 of 247 Current Capital Improvement Projects TIP No. Project No. Update On Schedule/ Or Behind Project Budget Project Cost Available Current Year Projected Current Year Cost Current Year Available GTEC PROJECT UPDATE AND STATUS REPORT July 2016 Project to Date Current Year Budget (13/14) Snead Drive 5QZ Project is Substantially Complete (roadway is fully open to traffic; contractor working on punch‐list and final clean up.) Final WalkThru scheduled 7/28/16, awaiting grass to be established. Substantially Complete 825,100 87,000 738,100 825,100 87,000 738,100 Mays Street Extension 5RI Design is Complete ROW acquisition on‐going (3 of 6 parcels acquired) Project advertised June 12th and 19th; Bids to be opened June 30th; GTEC – July 20th; Council – August 9th; Anticipated NTP – Late‐August Anticipated completion Summer 2017 In Process 196,000 196,000 0 196,000 196,000 0 IH 35/ Hwy 29 Intersection 5RJ TBD 650,000 0 650,000 650,000 0 650,000 Current Economic Development Projects Project Type Project No. Update On Schedule/ Or Behind Project Budget Project Cost Available Current Year Budget Current Year Cost Current Year Available 100 S. Austin Ave Eco Devo Project 5RA In-process 507,000 507,000 0 0 Williams Drive Gateway 5RC Engineer working on schematic design alternatives and preliminary cost estimates. On Schedule 65,000 61720 3,280 0 0 Economic Development Projects 1,137,500 1,137,500 1,137,500 0 1,137,500 16,062,596 3,467,093 12,595,503 Project to Date Current Year Budget (13/14) L:\Global\CIP Budgetary Worksheets\GTEC Status Report\2016\GTEC - Project Status - 2016-07.xlsx Page 2 of 2 7/13/2016Page 230 of 247 FM 1460  (Quail Valley Drive to University Drive)  Project No. 5RB     TIP No. BO & CD  Rights‐of‐Way Acquisition and Utility Relocation  July 2016  Unchanged  Project Description Acquisition of ROW and relocation of utilities for the FM 1460 Project (Quail Valley  Drive to University Drive).  Purpose To have all ROWs cleared and utilities prior to TxDOT letting the project for  construction.  Project Managers Ed Polasek, AICP, and Bill Dryden, P.E.  Engineer Brown and Gay Engineers, Inc.      Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way    One (1) remaining parcel – pending closing  documents.  Section:  North South  Acquired:  35 8  Pending:  1 ‐  Condemnation:  0 ‐  Total:  36 8  Utility Relocations Ongoing   Two Utility companies have submitted invoices for reimbursement – Atmos Energy  and Seminole Pipeline  Construction Under Construction.  Tentatively scheduled to be complete Spring 2018.  Other Issues Engineer preparing Change Orders for construction contract.    Page 231 of 247 Mays Street Extension  (Teravista Parkway in Round Rock to the intersection with Westinghouse Road)  Project No. 5RI     TIP No. CK  July 2016  Project Description Extend Mays Street northward from Teravista Parkway to the existing intersection  with Westinghouse Road at Rabbit Hill Road. The widening along Westinghouse  Road and Rabbit Hill Road will also be included in the schematic for additional  turning lanes to/from Westinghouse Road. Preliminary layouts for future signals  and roadway illumination will also be included.  The project length along the  anticipated alignment is approximately 1.2 miles.  Purpose To develop final PS&E and complete construction of the project.  Project Managers Bill Dryden, P.E.  Engineer CP&Y, Inc.    Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way ROW acquisition – on‐going Total Parcels: 6  Acquired: 4  Pending: 2  Utility Relocations TBD  Construction Project advertised June 12th and 19th;   Bids to be opened June 30th;  GTEC – July 20th;  Council – August 9th;  Anticipated NTP – Late‐August  Anticipated completion Summer 2017  Other Issues     Page 232 of 247 NB Frontage Road  (SS 158 to Lakeway Drive)  Project No. 5QX      TIP No. AF  July 2016  Unchanged  Project Description Design and construct a portion of an IH‐35 NB Frontage Road from Williams Drive  to Northwest Boulevard Bridge of a proposed NB FR which would ultimately  extend to Lakeway Drive.  Purpose To relieve congestion in the Williams Drive/Austin Avenue intersection by  providing a NB alternate, interim route to FM 971 and Georgetown High School.  This project is the only remaining portion of IH 35 in Central Texas without a  frontage road existing, under construction or being designed.  Project Manager Bill Dryden  Engineer Klotz Associates  Element Status / Issues  Design We have been informed by TxDOT that it will be doing the Schematic,  Environmental, etc., and PS&E for the NB Frontage Road as part of its proposed  Williams Drive Bridge project.  The City project is on indefinite hold but we will continue coordination with  TxDOT on its design of the project.  Environmental/  Archeology  TBD – By TxDOT  Rights of Way None identified  Utility Relocations TBD  Construction TBD  Other Issues None at this time.    Page 233 of 247 Northwest Boulevard Overpass  (Fontana Drive to Austin Avenue)  Project No. 5QX     TIP No. AF  July 2016  Unchanged  Project Description Construction of overpass and surface roads to connect Northwest Boulevard with  Austin Avenue and FM 971.  Purpose This project will relieve congestion at the Austin Avenue/Williams Drive  intersection and provide a more direct access from the west side of IH 35 corridor to  Georgetown High School and SH 130 via FM 971.  Project Manager Bill Dryden, P.E.  Engineer Klotz Associates    Element Status / Issues  Design Engineer is coordinating design with the design for Rivery Boulevard in moving  towards construction PS&E for both projects to minimize overlap work between  these two projects.  Engineer has developed alternatives for stormwater outfall northward from NW  Blvd.  Environmental/  Archeological  Concurrent with preliminary engineering and schematic design.  Rights of Way ROW Documents are being finalized.  Part of the ROW for this project is being  required to complete the Rivery Boulevard Extension project.  Utility Relocations TBD  Construction Tentatively scheduled to begin mid‐FY 2019.  Other Issues Paper work has been submitted to TxDOT to create an AFA for design and  environmental reviews of the bridge over I 35.    Page 234 of 247 Rivery Boulevard Extension  (Williams Drive to Northwest Boulevard @ Fontana Drive)  Project No. 5RM     TIP No. AD   July 2016  Project  Description  Develop the Rights‐of‐Way Map, acquire ROW, address potential environmental issues  and complete construction plans specifications and estimate (PS&E) for the extension of  Rivery Boulevard from Williams Drive to Northwest Boulevard at Fontana Drive in  anticipation of future funding availability.  Purpose To provide a route between Williams Drive and Northwest Boulevard serving the  Gateway area, providing an alternate route from Williams Drive to the future  Northwest Boulevard Bridge over IH 35, to provide a route between the hotels in the  Gateway area and the proposed Conference Center near Rivery Boulevard and Wolf  Ranch Parkway.  Project Manager Bill Dryden, P.E.  Engineer Kasberg Patrick and Associates  Element Status / Issues  Design Engineer has submitted 75% plans for City’s review.  Environmental/  Archeology  Complete  Rights of Way Appraisals complete.  Offers have been made to all 22  parcels.  Closed on 6 parcels; 3 pending contract  execution or final closing preparation.  Total Parcels: 22 Appraised: 22 Offers: 22 Acquired: 6 Closing pending: 3 Condemnation: 0 Utility Relocations TBD  Construction Tentatively scheduled to begin mid‐FY 2018.  Other Issues TBD    Page 235 of 247 Snead Drive Project  (SE Inner Loop to Airborn Circle)  Project No. 5QZ      TIP No. BM  July 2016  Project Description   Develop Construction Plans Specifications and Estimate (PS&E) for the widening  of Snead Drive from S.E. Inner Loop to 600 feet north of Cooperative Way,  including appurtenant waste water improvements.  Purpose This project has been identified as GTEC eligible project and will provide  necessary infrastructure for ongoing economic development in the area.   Project Manager Bill Dryden, P.E.  Engineer Steger Bizzell      Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way Complete  Utility Relocations Complete  Construction Project is Substantially Complete (roadway is fully open to traffic; contractor  working on punch‐list and final clean up.)  Final WalkThru scheduled 7/28/16,  awaiting grass to be established.  Other Issues None     Page 236 of 247 Austin Avenue Bridges Project  (North and South San Gabriel Bridges)  Project No. TBD     TIP Project No. N/A  July 2016  Project  Description  Develop 30% plans for improvements along Austin Ave. between 3rd Street and Morrow  Street.  The project involves several phases and requires participation and support from  various stakeholders and interested citizens, community businesses, professional  consultants, State and regional transportation partners City Staff and Council.  Schedule Phase Activity Completion  1 Public involvement and alternative analyses, evaluating   alternatives for feasibility and costs, etc.Mid 2016  2 Develop geometric layouts and preliminary construction  estimates for two alternatives Mid 2016  3 Selection of alternative by Council End 2016  4 Develop schematic and 30% plans.Mid 2017 Proj. Mgrs Nat Waggoner, AICP, PMP®, Ed Polasek, AICP; Bill Dryden, P.E.  Engineer Aguirre & Fields, LP    Element Status/Issues Public  Involvement  2nd Public Meeting was held June 28, 2016 at the San Gabriel Community Center  Walking tour – 4:30 to 5:30, Public Meeting from 6:00‐8:00  Design Forensic testing completed. Steel coupon testing 0/30. Results expected by 10/16.  Surveying  Complete  Environmental 4f and Study Scope documents drafted, Meeting 6/13 with TxDOT Rights of Way Exist. ROW from N. of 2nd to Morrow; Additional ROW may be required 3rd to N.  of 2nd.  Utility Relocations TBD  Construction TBD  Other Issues Reports from independent engineering firms completed and will be  distributed the week of  7/4/16.    Page 237 of 247 CDBG Sidewalk Improvements Project  MLK/3rd Street (Scenic Dr. to Austin Ave.)  Project No. None    TIP No. None  July 2016  Project Description Design and preparation of final plans, specifications and estimates (PS&E) for  sidewalk improvements along MLK/ and 3rd streets from Scenic Drive to Austin  Avenue.  Purpose To provide ADA/TDLR compliant sidewalks and ramps along the route.  Project Managers Bill Dryden, P.E.  Engineer Steger Bizzell    Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way N/A  Utility Relocations N/A  Construction Under Construction; approximately 75% complete.  Other Issues None    Page 238 of 247 CDBG Sidewalk Improvements Project  University Avenue (SH 29) (I 35 to Hart St.)  Project No. None    TIP No. None  July 2016  Project Description Design and preparation of final plans, specifications and estimates (PS&E) for  sidewalk improvements along University Avenue (SH 29) from I 35 to Hart Street.  Purpose To provide ADA/TDLR compliant sidewalks in the area.  Project Managers Bill Dryden, P.E.  Engineer Steger Bizzell    Element Status / Issues  Design Complete  Environmental/  Archeological  N/A  Rights of Way Existing  Utility Relocations None identified  Construction NTP – 2nd week of July; expected completion   Other Issues Multiple Use Agreement has been received from TxDOT, signed by the Mayor  and returned for final execution by TxDOT.    Page 239 of 247 FM 971 at Austin Avenue  Realignment Intersection Improvements  Project No. 1BZ     TIP No. AG  July 2016  Project Description Design and preparation of final plans, specifications and estimates (PS&E) for the  widening and realignment of FM 971 at Austin Avenue, eastward to Gann Street.  Purpose To provide a new alignment consistent with the alignment of the proposed  Northwest Boulevard Bridge over IH 35; to allow a feasible, alternate route from  the west side of I 35 to Austin Avenue, to Georgetown High School, to San Gabriel  Park and a more direct route to SH 130.  Project Managers Bill Dryden, P.E.  Engineer Klotz Associates, Inc.    Element Status / Issues  Design Preliminary Engineering complete;   Engineer’s work for the 60% design submittal is on hold pending discussion and  recommendation from GTAB for alignment.  Environmental/  Archeological  TBD  Rights of Way Complete  Utility Relocations TBD  Construction TBD  Other Issues On hold pending resolution of discussions on a potential alternative alignment.    Page 240 of 247 FM 1460  Quail Valley Drive to University Drive  Project No. 5RB     TIP No. BO & CD  July 2016  Unchanged  Project Description Design and preparation of plans, specifications and estimates (PS&E) for the  widening and reconstruction of FM 1460.  Project will include review and update  to existing Schematic, Right‐of‐Way Map and Environmental Document and  completion of the PS&E for the remaining existing roadway.  Purpose To keep the currently approved environmental documents active; purchase ROW,  effect utility relocations/clearance and to provide on‐the‐shelf PS&E for TxDOT  letting not later than August 2013, pending available construction funding.  Project Managers Ed Polasek, AICP and Bill Dryden, P.E.  Engineer Brown and Gay Engineers, Inc.    Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way 1 remaining parcel of original 36 – pending closing documents.  Utility Relocations Ongoing  Construction Construction is on‐going  Other Issues Engineer preparing Change Orders for construction contract.    Page 241 of 247 Jim Hogg Drive/Road at Williams Drive  Intersection and Signalization Improvements  Project No. 1DE    TIP No. None  July 2106  Project Description Design and preparation of final plans, specifications and estimates (PS&E) for the  widening of Jim Hogg at the intersection of Williams Drive, inclusive of installation  of a traffic signal.  Purpose To provide a widened 3‐lane section with signal at the intersection of Jim Hogg and  Williams Drive.  The proposed improvements will provide improved access for the  residents and the employees of the new City Service Center to Williams Drive.  Project Manager Bill Dryden, P.E.  Engineer Kimley‐Horn and Associates, Inc.    Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way Existing  Utility Relocations Complete  Construction Construction is substantially complete.  All driveways placed, road paved and striped; traffic signal in flash mode 06/27  and full operation mode 07/06; NB Hogg all lanes open; SB Hogg needs some  dress‐up; expect to have all lanes open Wednesday 6/29.  Walk‐thru to be scheduled during the week of 07/05‐08.  Other Issues None    Page 242 of 247 Southwest Bypass Project   (RM 2243 to IH 35)  Project No. 1CA     Project No. BK  July 2016  Unchanged  Project Description Develop PS&E for Southwest Bypass from Leander Road (RM 2243) to IH 35 in the  ultimate configuration for construction of approximately 1.5 miles of interim 2‐lane  roadway from Leander Road (RM 2243) to its intersection with the existing Inner  Loop underpass at IH 35.  Purpose To extend an interim portion of the SH 29 Bypass, filling in between Leander Road  (RM 2243) to IH 35 Southbound Frontage Road.  Project Manager Williamson County  City Contact: Ed Polasek, AICP and Bill Dryden, P.E.  Engineer HDR, Inc.      Element Status / Issues  Williamson County  Project Status  (from WilCo’s  status  report)  Southwest Bypass Driveways – Award of the construction contract was approved  at 3/8/16 Commissioners Court Meeting. Five (5) bids were received on 2/24/16, with  the apparent low bidder being Smith Contracting with a bid of $289,981.90.  NTP is  anticipated to be issued 5/2/16 with Time Charges beginning on 5/12/16. A  Preconstruction meeting was held 4/15/16.  Southwest Bypass (RM 2243 to IH 35) – A meeting with HDR to discuss the WA  Supplemental and project status was held on 3/9/16. A meeting with TxDOT and the  City of Georgetown to discuss the turn lanes on RM 2243 was held on 3/9/16. A  meeting with the City of Georgetown and County staff was held on 2/26/16 to  discuss project status. A 30% PS&E Submittal for the Southwest Bypass Phase 1 was  received on 2/23/16 and is under review. A GEC Constructability review meeting  was held on 3/3/16. An ILA with the City of Georgetown was approved by  Commissioners Court on 2/23/16. Comments were issued 2/18/16 on a 60% PS&E  submittal for turn lanes on RM 2243 at Southwest Bypass.  Rights of Way Complete for the parcels east of the Texas Crushed Stone properties.  Other Issues City and WilCo completing the Interlocal Agreement for the Project.    Page 243 of 247 Transit Development Plan  (Fixed Route Bus)  July 2016  Project  Description  The purpose of this study is to develop a local transit plan for the City of Georgetown that  serves transit needs of the citizens within the city limits and connect to existing and future  regional transit options to form a regional  transit  network  that  would  improve  mobility,   improve  the  region’s  environmental  and economic sustainability and slow the increase of  congestion on roadways.  Schedule Phase Activity Completion   1 Initiation Fall 2014  2 Public Involvement, Existing Conditions, Recommendations Spring 2015  3 Initial Report Completed Summer 2015  4 Boards and Commissions Review, Council May 2016  5 Consideration by Council August 16, 2016 Proj. Mgrs Ed Polasek, AICP; Nat Waggoner, AICP, PMP®; Bill Dryden, P.E.  Engineer AECOM, Capital Metro    Element Status/Issues  Public  Involvement  2 Public Meetings  Public Intercept Survey, Online Survey, GYAB Survey, Multiple Stakeholder Interviews More than 20 presentations  Design Revisions underway based on changed conditions  Next Step(s) Council consideration of TDP Adoption and FY17 Budget Inclusion      Page 244 of 247 Transportation Services Operations  CIP Maintenance  July 2016  Project Description 2016‐2017 CIP Maintenance of roadways including, Chip seal, Cutler Overlays,  Fog seal applications and Engineering design of future rehabilitation projects.  Purpose To provide protection and maintain an overall pavement condition index of  85%.  Project Manager Mark Miller  Engineer/Engineers KPA, LP  Task Status / Issues     Chip Seal  Contractor has indicated his intention to move into Georgetown on July 25th  and work through August.  PMM (polymer modified masterseal) with chip  seal contract.     HIPR/Overlay Preconstruction was held on June 16th.  Tree trimming July 5th to the 12th.   Notice to proceed will be July 18th.  Contractor to pave Maple Street between  July 26th  and August 11th.  Southwestern preference 26‐29.  Sun City provided  a calendar of events in the area of the amenity center in July and August to  help determine the best times to cross driveways with the moving operation.  Curb and Gutter  Engineering 2016  Plans should be complete in July.  Advertising in August and bring to  GTAB for recommendation in September.    Page 245 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: - At the time of po sting, no persons had signed up to address the City Council ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Shelley Nowling, City Secretary Page 246 of 247 City of Georgetown, Texas City Council Regula r Meeting July 26, 2016 SUBJECT: Sec. 551.071: Consul tati on w i th Attorney - Advice from attorney about pending or contemplated litigation and other matters on which the attorney has a duty to advise the City Council, including agenda items - P ublic Safety Ope ratio ns and Training Facility - ADG Settlement Sec. 551.072: De l i berati o n Regardi ng Real P ro perty - City Lease Agre e ments Sec. 551.074: Personnel Matters - City Manager, City Atto rney, City Secretary and Municipal Judge: Consideration o f the appointment, employment, evaluation, reassignment, duties, discipline, or dismissal - City Manager Evaluatio n ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Shelley Nowling, City Secretary - BH Page 247 of 247